Attachment_1-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx

Air Force Form DOCX document 33 KB Posted

Attached to
Air Force Boiler and UPV Inspections, Alaska
Solicitation number
FA8051-14-T-0008
Issued by

About this file

Attachment 1 - AF Form 1222 - AF Equivalent (7-12-13)

View the file

Other versions and copies of AF Form 1222

File Revision Posted Attached to
CDRL_Attachment_4_-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013).docx Jul 12, 2013 OCONUS PACAF AND USAFE BOILER INSPECTIONS FY17
Attachment_3-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013)_(2).docx Jul 12, 2013 PACAF Boiler Inspection Services
Attachment_3-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013)_(2).docx Jul 12, 2013 Boiler Inspections at Clear/Eielson AFB, AK
Attachment_3-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013)_(2).docx Jul 12, 2013 Boiler/UPV Inspection Services in Alaska
Attachment_3-AF_FORM_1222-AF_EQUIVALENT_(7-12-13)-Tests.docx Revision not stated OCONUS PACAF AND USAFE BOILER INSPECTIONS FY17
Attachment_2-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated PACAF Boiler Inspection Services
Attach_5_AF_Form_1222.pdf Revision not stated Air Force Boiler and Unfired Pressure Vessel Inspections (AFCEC, Tyndall AFB, FL)
Attch_2_AFCEC_SUPPLEMENTAL_AF_FORM_1222.pdf Revision not stated Air Force Boiler and Unfired Pressure Vessel Inspections (AFCEC, Tyndall AFB, FL)
Attch_3_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(10-30-15).pdf Revision not stated Air Force Boiler and Unfired Pressure Vessel Inspections (AFCEC, Tyndall AFB, FL)
Attachment_2_-_Instructions_for_Completing_the_AF_Form_1222.pdf Revision not stated Air Force Boiler and UPV Inspections, Korea
Attachment_1_-_AF_Form_1222-AF_Equialent.docx Revision not stated Air Force Boiler and UPV Inspections, Korea
Attachment_2-_Instructions_for_Completing_the_AF_Form_1222.pdf Revision not stated Air Force Boiler and UPV Inspections, Alaska
Attachment_2-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated Boiler Inspections at Clear/Eielson AFB, AK
Attachment_2-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated Boiler/UPV Inspection Services in Alaska
Show all 14

Who attaches AF Form 1222

Other files

File Type Posted
042914_Alaska_Boilers_Q As.docx DOCX document
PWS_Dated_15_April_2014.docx DOCX document
Attachment_5-_Mandatory_DFARS_Provision.docx DOCX document
Attachment_4-_FY_14_Passenger_and_Cargo_Fees.xlsx XLSX spreadsheet
Combo_-_Boiler_Inspections_for_Alaska.docx DOCX document
AK_WD.pdf PDF
Attachment_3-Alaska_Required_Inspections_and_Schedule.docx DOCX document
Attachment_2-_Instructions_for_Completing_the_AF_Form_1222.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOILER OR

PRESSURE VESSEL INSPECTION REPORT

1. TYPE OF INSPECTION (B – Boiler ☐; V – Pressure Vessel ☐)
2. DATE OF INSPECTION
INTERNAL AND EXTERNAL
☐BA
☐VA
INTERNAL EXTERNAL UNDER HYDROSTATIC TEST
☐BB
☐VB
3. INSPECTION/DELIVERY ORDER NO.
EXTERNAL UNDER OPERATION
☐BC
☐VC
EXTERNAL UNDER HYDROSTATIC TEST
☐BD
☐VD
4. CONTRACT NUMBER
EXPANSION/RECEIVER TANK
☐BE
☐VE

5. INSTALLATION

6. STATE

7. ZIP CODE

8. LOCATION (Bldg. No.)

9. PLANT
☐MANNED☐UNMANNED

10. OBJECT INSPECTED:

BOILER:
☐FIRE TUBE
☐CAST IRON
☐WATER TUBE
☐OTHER (SPECIFY)
UPV:
☐EXPANSION TANK
☐AIR RECEIVER
☐LP
☐OTHER (SPECIFY)
11. USE:
☐POWER
☐PROCESS
☐HTHW
☐HWH
☐STEAM HEATING
☐STORAGE
☐HEAT EXCHANGE

☐OTHER (SPECIFY)

12. MANUFACTURER
13. MFR. RATING (MBTU or
14(a). NATIONAL BOARD NO.
14(b). USAF NO.

KLBS/HR):

15. YEAR BUILT
16. YEAR INSTALLED
17. PRIMARY FUEL (BOILER)
18. SECONDARY FUEL
19. PRESSURE ALLOWED MAWP ________ PSIG at TEMP ____
20. ACTUAL OPERATING PRESSURE (PSIG)

Previous Inspection MAWP ________ PSIG at TEMP _____

21. SAFETY &/or RELIEF VALVE SETTING
22. PRESSURE &/or TEMP PRIOR INSPECTION
23. PRESSURE &/or TEMP THIS INSPECTION
24. EXPLAIN IF PRESSURE CHANGED
(PSIG &/or ° F) _________
(PSIG &/or ° F) _________
(PSIG &/or ° F) _________
25. METHOD OF FIRING (BOILERS):
26. PRESSURE GAGE CALIBRATED?☐YES☐NO
27. DATE/TYPE OF LAST INSPECTION
TYPE:DATE:
28. HYDROSTATIC TEST☐NEW☐RETEST☐REPAIR
DATE:PSIG:
29. LAST HYDROSTATIC TEST
DATE:PSIG:

30. REPAIRS/ALTERATIONS MADE SINCE LAST INSPECTION? ☐NONE ☐YES (SPECIFY)

31. INTERNAL INSPECTION (DESCRIBE INSPECTION FULLY):

32. EXTERNAL INSPECTION (DESCRIBE INSPECTION FULLY):

33. INSPECTION OF SAFETY DEVICES RELIEVING (lbs/hr)

MANUFACTURER
SET PRESSURE-PSIG
SIZE
CAPACITY
TESTED (Y/N?)
CONDITION & HOW TESTED

TOTAL RELIEVING CAPACITY (lbs/hr)

34. INSPECTION OF PRESSURE GAGES

GAGE
CONDITION
CORRECTIONS MADE
TESTED (Y/N?)
REASONS WHY NOT TESTED

35. OTHER APPLIANCES (e.g., WATER COLUMNS, GAGE GLASSES, GAGE COCKS, BLOWOFF PIPE & VALVE OR COCKS, FEED PIPE)

ITEM
CONDITION

36. CSD-1/NFPA 85 COMPLIANT? (FOR BC ONLY)

☐YES
☐NO (EXPLAIN IN BLOCK 37)
☐N/A

37. STATE CONDITION OF OBJECT

☐ SATISFACTORY
☐ UNSATISFACTORY (LIST DEFICIENCIES TO BE CORRECTED AND REPAIRS TO BE MADE.

USE A SUPPLEMENTAL SHEET, IF NECESSARY.)

38. CAN THE OBJECT CONTINUE IN OPERATION?
☐YES☐YES, WITH RESTRICTIONS (EXPLAIN ON SUPPLEMENTAL SHEET)☐NO (EXPLAIN ON SUPPLEMENTAL SHEET)

39. NAME AND TITLE OF INSPECTOR:

40. SIGNATURE OF INSPECTOR:

41. NATIONAL BOARD COMMISSION NUMBER:
42. DATE:

43. NAME AND TITLE OF AIR FORCE REPRESENTATIVE ACCOMPANYING INSPECTOR:

44. SIGNATURE:

45. DATE:

46. ACTIONS TAKEN BY AIR FORCE AT A LATER DATE TO RESOLVE DEFICIENCIES CITED ABOVE:

47. DATE OF ACTIONS TAKEN:

48. NAME AND TITLE OF AUTHORIZING OFFICIAL:

49. SIGNATURE OF AUTHORIZING OFFICIAL:

50. DATE:

AF FORM 1222-AF EQUIVALENT (7-12-13)

File details come from the government source that posted it. Updated .