AFCEC SUPPLEMENTAL FORM FOR AF FORM 1222
BOILER OR PRESSURE VESSEL INSPECTION REPORT
SUP 51-FIGURE 1 - BOILER EFFICIENCY TEST RESULTS
BOILER EFFICIENCY TEST RESULTS:
Test Positions X/Y Axis
O2
% CO
(ppm) CO2 % HYDRO-
CARBONS %
STACK
TEMP
(°F)
COMBUSTION
AIR
TEMP
(°F)
EXCESS
AIR %
COMBUSTION
EFF %
X-Axis
.07 DIA
.25 DIA
.75 DIA
.93 DIA
Y-Axis
.07 DIA
.25 DIA
.75 DIA
.93 DIA
FLUE STACK DIA. (IN.): ____________ FUEL TYPE NG/FO: ______________ ENERGY CONTENT (BTU/ft3; BTU/gal): ____________
BOILER EFFICIENCY TEST PROCEDURES USING THE ASME PERFORMANCE TEST CODES
1. The efficiency test procedure will measure the test parameters at the sampling locations listed in the SUP 51 Figure 1-Boiler Efficiency Test Results.
2. Select the sampling locations as shown in Figure 2 so the test points are uniform in each area.
3. The velocity will be acceptably uniform if the sample point is at least eight diameters downstream and two diameters upstream from the first elbow or disturbance (bend or fitting, etc.).
4. Measurements should not be taken within three diameters of the stack exit to avoid possibility of any ambient air being aspirated into the sample.
5. Ensure test hole diameters are sized correctly to prevent infiltration of air. Use a mechanical seal around test probe to seal any gaps.
SUP 30-33. INSPECTION OF SAFETY DEVICES RELIEVING (lbs/hr) MANUFACTURER SET PRESSURE-PSIG SIZE CAPACITY TESTED (Y/N?) CONDITION & HOW TESTED
TOTAL RELIEVING CAPACITY (lbs/hr)
SUP 34-35. INSPECTION OF PRESSURE GAGES
GAGE CONDITION CORRECTIONS MADE TESTED (Y/N?) REASONS WHY NOT TESTED
SUP 36-37. OTHER APPLIANCES (e.g., WATER COLUMNS, GAGE GLASSES, GAGE COCKS, BLOWOFF PIPE & VALVE OR COCKS, FEED PIPE)
ITEM CONDITION
FIGURE 2 METHOD OF SUBDIVIDING CIRCULAR SAMPLE PLANE
ASME PERFORMANCE TEST CODES
Use as sample to set up test points for boiler efficiency tests
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow1: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow1_2: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow1_3: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow1_4: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow1_5: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow1_6: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow2: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow2_2: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow2_3: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow2_4: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow2_5: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow2_6: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow3: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow3_2: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow3_3: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow3_4: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow3_5: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow3_6: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow4: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow4_2: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow4_3: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow4_4: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow4_5: |
| SUP 3033 INSPECTION OF SAFETY DEVICES RELIEVING lbshr MANUFACTURER SET PRESSUREPSIG SIZE CAPACITY TESTED YN CONDITION HOW TESTEDRow4_6: |
| TOTAL RELIEVING CAPACITY lbshr: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow1: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow1_2: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow1_3: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow1_4: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow1_5: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow2: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow2_2: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow2_3: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow2_4: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow2_5: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow3: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow3_2: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow3_3: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow3_4: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow3_5: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow4: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow4_2: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow4_3: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow4_4: |
| SUP 3435 INSPECTION OF PRESSURE GAGES GAGE CONDITION CORRECTIONS MADE TESTED YN REASONS WHY NOT TESTEDRow4_5: |
| SUP 3637 OTHER APPLIANCES eg WATER COLUMNS GAGE GLASSES GAGE COCKS BLOWOFF PIPE VALVE OR COCKS FEED PIPE ITEM CONDITIONRow1: |
| SUP 3637 OTHER APPLIANCES eg WATER COLUMNS GAGE GLASSES GAGE COCKS BLOWOFF PIPE VALVE OR COCKS FEED PIPE ITEM CONDITIONRow1_2: |
| SUP 3637 OTHER APPLIANCES eg WATER COLUMNS GAGE GLASSES GAGE COCKS BLOWOFF PIPE VALVE OR COCKS FEED PIPE ITEM CONDITIONRow2: |
| SUP 3637 OTHER APPLIANCES eg WATER COLUMNS GAGE GLASSES GAGE COCKS BLOWOFF PIPE VALVE OR COCKS FEED PIPE ITEM CONDITIONRow2_2: |
| SUP 3637 OTHER APPLIANCES eg WATER COLUMNS GAGE GLASSES GAGE COCKS BLOWOFF PIPE VALVE OR COCKS FEED PIPE ITEM CONDITIONRow3: |
| SUP 3637 OTHER APPLIANCES eg WATER COLUMNS GAGE GLASSES GAGE COCKS BLOWOFF PIPE VALVE OR COCKS FEED PIPE ITEM CONDITIONRow3_2: |
| SUP 3637 OTHER APPLIANCES eg WATER COLUMNS GAGE GLASSES GAGE COCKS BLOWOFF PIPE VALVE OR COCKS FEED PIPE ITEM CONDITIONRow4: |
| SUP 3637 OTHER APPLIANCES eg WATER COLUMNS GAGE GLASSES GAGE COCKS BLOWOFF PIPE VALVE OR COCKS FEED PIPE ITEM CONDITIONRow4_2: |
| 07 DIA: |
| 07 DIA_2: |
| 07 DIA_3: |
| 07 DIA_4: |
| 07 DIA_5: |
| 07 DIA_6: |
| 07 DIA_7: |
| 07 DIA_8: |
| 25 DIA: |
| 25 DIA_2: |
| 25 DIA_3: |
| 25 DIA_4: |
| 25 DIA_5: |
| 25 DIA_6: |
| 25 DIA_7: |
| 25 DIA_8: |
| 75 DIA: |
| 75 DIA_2: |
| 75 DIA_3: |
| 75 DIA_4: |
| 75 DIA_5: |
| 75 DIA_6: |
| 75 DIA_7: |
| 75 DIA_8: |
| 93 DIA: |
| 93 DIA_2: |
| 93 DIA_3: |
| 93 DIA_4: |
| 93 DIA_5: |
| 93 DIA_6: |
| 93 DIA_7: |
| 93 DIA_8: |
| 07 DIA_9: |
| 07 DIA_10: |
| 07 DIA_11: |
| 07 DIA_12: |
| 07 DIA_13: |
| 07 DIA_14: |
| 07 DIA_15: |
| 07 DIA_16: |
| 25 DIA_9: |
| 25 DIA_10: |
| 25 DIA_11: |
| 25 DIA_12: |
| 25 DIA_13: |
| 25 DIA_14: |
| 25 DIA_15: |
| 25 DIA_16: |
| 75 DIA_9: |
| 75 DIA_10: |
| 75 DIA_11: |
| 75 DIA_12: |
| 75 DIA_13: |
| 75 DIA_14: |
| 75 DIA_15: |
| 75 DIA_16: |
| 93 DIA_9: |
| 93 DIA_10: |
| 93 DIA_11: |
| 93 DIA_12: |
| 93 DIA_13: |
| 93 DIA_14: |
| 93 DIA_15: |
| 93 DIA_16: |
| FLUE STACK DIA IN: |
| FUEL TYPE NGFO: |
| ENERGY CONTENT BTUft3 BTUgal: |