Attachment 5 - TASK FREQUENCY- Maintenance Exterior Cleaning.pdf

PDF 102 KB Posted

Attached to
Air Force Memorial Facility Maintenance Service
Solicitation number
FA706026RCE10
Issued by

About this file

This document is a Performance Work Statement (PWS) for maintenance services at the Air Force Memorial Complex. The contractor is required to provide comprehensive facility maintenance across multiple areas with varying frequency schedules.

Administrative tasks include daily maintenance of hazardous materials inventory, facility inspections, staff coordination meetings, supply and equipment inventory management, and electronic service call submissions. Government staff office maintenance requires daily checks of lighting, plumbing fixtures, outlets, doors, and handles, with monthly caulking inspections and as-needed window caulking assessments. Contractor office maintenance mirrors government office requirements with daily lighting, outlet, door, and work area inspections, plus as-needed caulking repairs. Restroom maintenance includes daily plumbing checks and door inspections. Welcome booth services require monthly electrical and daily HVAC function checks, annual metal surface cleaning, and daily door inspections. HVAC system maintenance specifies monthly filter changes and vent cleaning as needed. Generator maintenance requires weekly checks with monthly reports, service yearly, and monthly tank assessments submitted by the 15th of each month.

Exterior facility maintenance encompasses daily trash receptacle inspections, driveway and parking lot debris removal up to five times daily with gray paver joint sand application as needed, daily bollard cleaning with as-needed raising and lowering, annual bronze statue conservation treatment, and plaza panel cleaning up to five times daily. Specialized cleaning includes Missing Man glass cleaning up to twice daily, spire fingerprint removal up to twice daily with railing maintenance up to three times daily, and annual base plate polishing. Walkway and seating areas require removal of bird feces up to ten times daily, gum and cigarettes up to five times daily, and trash up to five times daily. Events and ceremonies maintenance (peak season March through November) includes equipment setup and teardown once daily or as needed, equipment modifications up to three times daily, and flag raising and lowering operations up to two to three times daily depending on the flag type.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Maintenance Services: Air Force Memorial Complex

TASK/AREA

Frequency

ADMINISTRATIVE

Maintain inventory hazards materials binder Daily, as required Inspection of entire facility (Email to AFM staff) Daily, as required

Maintenance Meeting with AFM staff Daily, as required Maintain inventory for supply & equipment (Email to AFM staff)

Daily, as required

Service calls (required/requested) electronically submitted (Email to AFM staff)

Daily, as required

GOVERNMENT STAFF OFFICE

Check all lighting One time daily Check bathroom plumbing, sinks, and toilets for leaks and damage and caulking needs

One time daily

Check kitchenette plumbing One time daily Check all outlets for damage and function One time daily Check interior Window Caulking As needed Check Exterior Windows Caulking As needed Check all caulking needs (fill cracks) Monthly Check doors & handles One time daily

CONTRACTOR OFFICE

Check all lighting One time daily Check all outlets for damage and function One time daily Check all caulking needs (fill cracks) As needed Check doors & handles One time daily Maintain clean & neat work area One time daily

REST ROOMS (All tasks/services) Check bathroom plumbing, sinks, and toilets for leaks and damage and caulking needs

One time daily

Check doors & handles One time daily

WELCOME BOOTH

Check Electrical Functions Monthly Check HVAC Functions One Time daily Wipe down metal surfaces Annual Check doors & handles One time daily

HVAC SYSTEMS

HVAC Filter change Monthly or as needed Check HVAC Vents and Clean as needed Monthly

GENERATOR

Generator Checks (Send Report) Service yearly and change filters as required per service manual

Weekly

Monthly (Send Tank Assessment Worksheet) Monthly by 15th of month

EXTERIOR TRASH AND RECYCLE RECEPTACLES

Inspect for rust One time daily

DRIVEWAY AND PARKING LOT

Remove leaves, trash, and debris As Required, up to five (5) times daily Apply Gray Paver Joint Sand As needed

BOLLARDS

Cleaning One time daily Raising and lowering As needed

HONOR GUARD STATUES

Bronze Statues Conservation Treatment Annual

PLAZA PANELS

Blow off plaza As Required, up to five (5) times daily Remove fingerprints from all panels As Required, up to five (5) times daily

MISSING MAN GLASS

Clean glass As Required, up to two (2) times daily

SPIRES

Remove fingerprints from up to 8 feet As Required, up to two (2) times daily Railing and Glass As Required, up to three (3) times daily Polishing Spires base plates Annually

WALKWAY AND SEATING AREAS

Remove bird feces As Required, up to ten (10) times daily Remove gum, cigars, cigarettes As Required, up to five (5) times daily Remove trash As Required, up to five (5) times daily

EVENTS AND CEREMONIES (Peak Season March – November) (Slow November – February) Equipment setup and teardown Once per day or as needed Equipment adding or removal No more than three (3) times daily

Flag Raising and Lowering Raise and Lower Flags (US, POW, and Air Force No more than two (2) times daily or as needed Flag Flying Program Raise and Lowering Customer Provided US Flag or Air Force flag

No more than three (3) times daily or as needed

File details come from the government source that posted it. Updated .