FA7014-17-R-5002 USAF FIAR FOLLOW ON SUPPORT QUESTIONS AND ANSWERS
View the file
Other files for this federal contract opportunity
Show all 50
Financial Improvement & Audit Readiness (FIAR) Follow-on Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 28, 2017
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
RFP Questions
Attachment 1 Addendum to FAR
Provision 52.212-1, Page 3, Section 2.5
Proposal Submission
The Past Performance Volume (Volume II) is due on 9 October 2017.
SOME DELAY SHOULD BE
ANTICIPATED WHEN HAND
CARRYING PROPOSALS AS WELL AS
MAILING BY COMMON CARRIER DUE
TO POTENTIAL BASE MAILROOM
DELAYS.
The RFP requires Past Performance
Questionnaires and Past Performance (hard copy, hand carried) volume submissions on
October 9th, which is a Federal holiday.
Request the due date for these submissions be changed to October 10th to ensure that delivery locations will be open and accessible.
The RFP has been amended to change the Past Performance
Volume (Volume II) due date to
16 October 2017 NLT 2:00PM
EST
Provision 52.212-1, Page 3, Section 2.5
Proposal Submission
This code will be placed on 4 of the 5 required printed copies.
This code will replace the company name and logos. On the four (4) coded proposals, there shall be NO mention of the company name or logo or any other identifying information on all required volumes.
The RFP requires name-redacted
The name redaction will apply to the Technical Volumes only.
Past Performance Volumes will have full company names and logos along with the code provided by the Government.
Each offeror is required to submit an un-redacted copy per the instructions.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
submissions. While we understand the
Government's desire for blind evaluation, removal of the company name or logo in the
Past Performance Volume will require a removal of all references within the past performance reference itself. This redaction renders this volume significantly less meaningful for evaluation. Please clarify that the name redaction applies only to the
Volume I Technical Proposal.
Provision 52.212-1, Page 7, Section
4.1.1.3 Subfactor 3 Staffing
Plan/Recruiting and Retention Plan
If the Offeror proposes alternate labor categories, the Offeror must map the proposed alternates to the provided labor categories.
The RFP intent appears to be that offerors can augment the RFP Labor Categories with alternates appropriate to perform the proposed support services. However, mapping to the (RFP) "provided labor categories" reduces the use of alternate labor categories to derivatives of the RFP labor categories. Please clarify whether offerors may propose alternate labor categories in place of provided labor categories OR propose alternate labor categories in addition to the provided labor categories.
The offeror is allowed to use the labor categories listed, propose all new labor categories, add to the labor categories, or propose to remove some. The offerors have discretion to propose as they see fit. However, if the offeror is proposing alternate labor categories, they must be mapped to the Government provided labor categories.
Provision 52.212-1, Page 6, Section 4.1
Volume I, FACTOR 1 - Technical
Proposal, Paragraph 4.1.1.3.2.
Can the Government confirm the TO
Request Form(s) to be included in the
Technical Volume only refers to the
"Proposed Hours Estimated by Task"
The TO Request Form will be placed in Volume III, Pricing, as required but "Proposed Hrs. Est by Task" tab will be used by the
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
At Task Order level, the Government is not requesting a technical proposal for the task order pricing; all based on the approach provided for the IDIQ. The
Offerors shall complete TO Request
Form (Attachments 5a-g). The Offeror shall propose the appropriate FTEs and labor categories for each of the specific task orders based on what was proposed at the IDIQ level.
worksheets?
Technical Evaluation Team to evaluate Task Order FTEs/Hours proposed only.
Provision 52.212-1, Page 6, Section 4.1
Volume I, FACTOR 1 - Technical
Proposal, Paragraph 4.1.1.3.2.
At Task Order level the Government is not requesting a technical proposal for the task order pricing; all based on the approach provided for the IDIQ. The
Offerors shall complete TO Request
Form (Attachments 5a-g). The Offeror shall propose the appropriate FTEs and labor categories for each of the specific task orders based on what was proposed at the IDIQ level.
Can the Government confirm the TO
Request Form, "Proposed Hours Estimated by Task" worksheets are to be included as part of the Technical Volume and are included in the Technical Volume page count?
The TO Request Form will be placed in Volume III, Pricing, not the Technical Volume. The Price
Volume has an unlimited page count
RFP AFFARS 5352.209-9001, Potential
Conflict of Interest
The RFP on Page 40 of 41 states “any offeror that holds a contract in the Program
Management Office, Financial Management
Offerors have the opportunity to submit mitigation plans in regards to this OCI. Offerors that
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
Office, and/or the System Integrator of the following systems have an impaired objectivity OCI: Defense Enterprise
Accounting and Management System
(DEAMS), Next Generation Information
Technology (NexGen IT), and Air Force
Integrated Personnel and Pay System
(AFIPPS).”
It appears the Government has concluded the contractors identified above have an impaired objectivity OCI that would not permit such contractors to compete for the
Financial Improvement and Audit Readiness
(FIAR) contract. It should be noted that:
The Air Force is currently under audit and the Independent Public
Accountant (IPA) conducting the audit, not the FIAR contractor, will independently identify the weaknesses and deficiencies in
DEAMS, NeXGen IT, and AFIPPS that require corrective actions
Although it is the FIAR contractor’s responsibility to develop corrective actions to address weaknesses and deficiencies identified by the IPA, typically the Government, IPA, and
FIAR contractor collaborate and mutually agree on the nature and requested an offeror code and provided proof that they are an
IPA have an opportunity. The
Contracting Officer will review the OCI plans from all offerors and provide their determination in writing.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
extent of the corrective actions needed to address the deficiencies and weaknesses identified by the IPA
Contractors supporting the DEAMS
Functional Management Office
(FMO) work under the direction and control of Government personnel.
The Government, not the support contractor, through a very complex review and approval process, makes the final decisions regarding development, integration, assembly, checkout, and production of
DEAMS, NexGen IT, and AFIPPS system components
Contractors supporting the DEAMS
FMO do not provide system components, including hardware and software.
Given that these factors reasonably mitigate impaired objectivity OCI concerns, will the
Government permit contractors supporting the DEAMS FMO to compete for the FIAR work?
N/A N/A
Would the Government extend the due date for the OCI Mitigation Plan to at least 10 calendar days from the date at which the
Government releases all final answers concerning potential conflict of interest matters? This would ensure that contractors
The OCI plan due date has been changed to 13 October 2017 at
2:00PM EST. See Attachment 1, Amended 52.212-1.
RFP FA7014-17-R-5002
have adequate time to respond.
We would like to request an extension on the due date of the OCI Mitigation Plan as questions are due Monday, September 22 and the OCI Plan is due Friday, September 29, which would not allow time to respond to Q&A.
The OCI plan due date has been changed to 13 October 2017 at
2:00PM EST. See Attachment 1, Amended 52.212-1.
Attachment 1 Questions
RFP Attachment 1, Page 2, Section 2.3 Organizational Conflict of Interest (OCI).
Please confirm that meaningful discussions will be conducted by the Air Force after each offeror submits their OCI Mitigation Plan if the Air Force has any questions about the content of the OCI Mitigation Plan and/or prior to the Air Force taking any action to eliminate any offerors from the FIAR procurement based on their OCI Mitigation
Plan.
The Government will take the actions that are in its best interest
Attachment_1_-
_Addendum_to_52_212-
1_FIAR_FINAL, Section 2.1.3, page 1
…Offerors must be an Independent Public
Accounting (IPA) firm, in good standing with the American Institute of Certified
Public Accountants (AICPA)…
The key element of the AICPA standard to judge if an IPA firm is in good standing with the AICPA is to require a Peer Review.
Please confirm the Offeror must present the government a current peer review associated with the bidding entity (i.e. same DUNS and
CAGE).
Offerors were given their notice to continue to step 2 or not already in accordance with
52.212-2, Paragraph 1.5.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
2.3.2
Attachment_1_-
_Addendum_to_52_212-
1_FIAR_FINAL, Section 2.3.2
“All Offerors shall also submit an OCI Plan as to how to avoid other OCIs in the future.”
Attachment 1, section 2.3.2 states: “All
Offerors shall also submit an OCI Plan as to how to avoid other OCIs in the future.”
Could the Government provide additional guidance on what the Government is seeking in this additional OCI Plan? Is the
Government seeking a separate OCI Plan than the OCI Mitigation Plan described in section 2.3.1? Can offerors provide both plans in one document? Is the Government seeking a separate OCI Mitigation Plan to avoid OCIs that are not based upon impaired objectivity?
Yes. The Government is seeking a separate mitigation plan from the known impaired objectivity
OCI. Offerors can submit the plans together or separately as long as the offeror clearly addresses each OCI matter; e.g.
impaired objectivity, future
OCIs.
Standard Form 1449; Attachment 1, Section 2.5, page 3
Could the Government please clarify the submission deadline for November 6, 2017?
The SF 1449 states “12:00 AM 06 Nov
2017” and Attachment 1, Section 2.5 states, “by 2:00 pm Eastern Time…”
The deadline is 13 November
2017 at 2:00PM EST. The RFP has been updated.
Attachment 1, Section 2.2, page 2 Could the Government please clarify in which volume it would like the Offeror to include information on its Facility Security
Clearance?
See RFP Attachment 1 –
Addendum to 52.212-1 paragraph
2.1.4. Should be submitted in
Volume I, Technical
Attachment 1, Section 3.3.1, page 5 and
Question 97 (page 47 of the Draft Q&A)
Could the Government clarify if the
Technical Cross Reference Matrix
(Attachment 3) is excluded from page count?
Yes. The cross reference matrix is excluded from the page count.
Updated para 4.1.1.3.1 and
4.2.1.3.
Attachment_1_-
_Addendum_to_52_212-
The Offeror shall submit one resume for all key personnel positions (PWS Attachment F) Use the key personnel positions
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
1_FIAR_FINAL, Section 4.1.1.3.1, page for review to show the Offerors understanding of the requirement.
Attachment F identifies key personnel by
IDIQ Task Area and also refers the reader to attachment G.
Please clarify if the full requirement is to submit the eight key positions identified in attachment F and only those eight.
If the eight positions do not represent the full resume submission requirement, please clarify the number of key personnel positions required for submission.
in Attachment F.
The language in Attachment F has been updated to provide clarity
Attachment_1_-
_Addendum_to_52_212-
1_FIAR_FINAL, Section 4.1.1.3.2, page
At Task Order level the Government is not requesting a technical proposal for the task order pricing; all based on the approach provided for the IDIQ. The Offerors shall complete TO Request Form (Attachments
5a-g). The Offeror shall propose the appropriate FTEs and labor categories for each of the specific task orders based on what was proposed at the IDIQ level.
Since a specific approach is not proposed for each Task Order, how will the government determine realism for staffing FTEs and labor categories?
The Government will evaluate the approach to complete the tasks at the IDIQ level because each task order will not have a separate PWS at this time.
However, the proposed Task
Order FTEs and labor categories will be based off the proposed
IDIQ labor categories and will be evaluated to ensure the offeror is proposing enough resources for the Task. See 52.212-2, Paragraph 3.2.3.
The evaluation of the TO pricing sheet, using the “Proposed Hrs.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
Est by Task” will be based on the
IDIQ pricing, which is evaluated for fairness, reasonableness, and the PECP for realism. The TO will be evaluated for fairness and reasonableness. Updated language in para 4.1.1.3.2.
Attachment_1_-
_Addendum_to_52_212-
1_FIAR_FINAL, Section 4.1.1.3.2, page
At Task Order level the Government is not requesting a technical proposal for the task order pricing; all based on the approach provided for the IDIQ. The Offerors shall complete TO Request Form (Attachments
5a-g). The Offeror shall propose the appropriate FTEs and labor categories for each of the specific task orders based on what was proposed at the IDIQ level.
Required staff levels are especially difficult to predict for option years starting in July
2020 and after since it is highly variable based on actual progress, managerial decisions and other moving factors. Staffing would be highly dependent on the Task
Order approach and Government and offeror assumptions for each task area within each task order.
For evaluation purposes, we recommend the
Government choose one of the following methods to determine realism for the staffing: (1) have bidders bid to historic level of effort; (2) have bidders determine staff
Offerors shall propose staff mix and FTEs for the base year and keep that constant across the options for this solicitation
(Attachments 5a-5h). The Task
Order pricing is to be based off the IDIQ pricing. See 52.212-1, Amendment 1, Paragraph 4.3.1.3.
The offeror can escalate rates if they so choose.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
mix and FTEs for the base year and keep that constant across the options for bid and price evaluation purposes; (3) provide government estimates for hours for all task orders and all years; or (4) provide government assumptions for out years, additional estimating details, and provide instructions for Offerors to bid an approach and supported BOE for each Task Order.
Attachment 1, Section 4 Transition Plan,
4.1.1.4 a. Key Transition Personnel,
a. Key Transition Personnel
Do Key Transition Personnel have to be named? Can Key Transition Personnel be considered key in multiple areas?
Key transition personnel do not have to be named. Key personnel can work in multiple areas
Attachment 1, Section 4.1.1.4.1, page 7 Could the Government please clarify if there is to be a letter “h” in the bulleted list?
Error corrected
Attachment 1, Section 4.2.1.1, page 8, bullet 7
Could the Government please clarify if the
Offeror should add “List of significant subcontractors” to the Past Performance Info
Form (Attachment 6)?
Offerors should only reference first tier subcontractors past performance if they are submitting it for inclusion and expect it to be evaluated
Attachment 1, Section 4.2.1.3, page 9 The Government requests the Offeror to submit a Past Performance Cross Reference
Matrix that assigns the proposed past performance to the specific subfactors listed above using the template provided
(Attachment 3). Attachment 3 is the
Technical Cross Reference Matrix, could the
Attachment 3 is a starting point and offerors can tailor or create their own matrix.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
Government clarify if the Offeror should use this matrix or create its own matrix for past performance?
Attachment 1, Section 4.3.2.1, page 10 Does the government require information for each subcontractor in the professional employee compensation plan?
Yes. For first tier subcontractors.
Updated paragraph 4.3.1.2 See
52.212-1, Amendment 1, Paragraph 4.3.1.2.2.
RFP Attachment 1, Page 9 / Section 4.3 4.30Volume III, FACTOR IV – Cost/Price:
Will the government please confirm/clarify that the reference to “FACTOR IV” is a typo and there are only three factors, and therefore the heading for this section should reference Factor III under the Price Volume per Table 1 on page 5?
There are only three factors. The typo has been corrected.
Would the government consider a teaming arrangement between contractors that would operate similar to a contractor teaming arrangement (CTA) in a GSA contract environment? There would still be a named prime with overall accountability to the government but both contractors would operate as co-primes.
The Government is seeking to have one focal point for audit readiness.
RFP RFP and Attachments in general.
Please confirm that “Tasks” as used in the B tables and in the PWS is not synonymous with “Task Orders.”
Tasks are referred to as the work throughout the solicitation. It is not synonymous with Task
Orders, which is the actual award that outlines the tasks or work to be completed.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
ITO
Attachment 1 – Addendum to FAR
Provision 52.212-1 Instructions to
Offerors (ITO) – Commercial Items
4.2.1.3 The Offeror shall submit a Past
Performance Cross Reference Matrix that assigns the proposed past performance to the specific subfactors listed above using the template provided (Attachment 3).
Will the government please confirm that the
Past Performance Cross Reference Matrix is excluded from the Past Performance Volume page count?
Yes, the Past Performance Cross
Reference Matrix is excluded from the page count.
2 2.2
This section states, “A verifiable SECRET
FCL must exist in the ISFD at time of proposal. Offeror’s FCL will be assessed as
“responsive/non-responsive” at proposal submission.” In which Factor/section should offerors include verification of their Secret
FCL?
The facility clearance does not have to be included in any
Factor/section. The Offeror does not have to submit anything outside of the required DD254 for Government verification.
3 2.5 Proposal Submission
This section states, “All proposals shall be received (5 hard copies, plus CD-ROM or
CD-R), by the contracting team by 2:00 pm
Eastern Time on each required date.” Please confirm all Volumes may be included on the same CD-ROM or CD-R.
Yes
3 2.5 Proposal Submission
This section states, “Offerors should notify the CS or CO if they intend to hand deliver their proposal.” How much notice does the
Government need ahead of the hand delivery?
The Government requires at least one business day notice prior to scheduled delivery. The RFP has been updated to reflect this change in 52.212-1.
5 3.3.2 Page Size and Format
This section states, “Pages shall be numbered sequentially by volume.” Please confirm offerors may use a separate numbering system for pages not included in
Yes
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
the page limitations (such as i, ii, iii or A-1, A-2, A-3).
5 3.3.2 Page Size and Format
This section states, “Pages shall be numbered sequentially by volume.” Please confirm the title page (reference in section
3.3.4) does not need to be numbered.
Yes
5 3.3.2 Page Size and Format
This section states, “When text is included within displays, it may be no smaller than 8 point, but must be clearly legible without magnification, as determined solely by the
CO.” Please confirm “displays” refers to tables and graphics.
Yes
5 3.3.2 Page Size and Format
This section states, “When text is included within displays, it may be no smaller than 8 point, but must be clearly legible without magnification, as determined solely by the
CO.” Please confirm offerors may use text no smaller than 8 point in headers and footers.
Yes
5 3.3.3 CD-ROM or CD-R Copies
This section states, “Each volume shall be in a different directory on a CD.” Please clarify if “directory” is equivalent to
“folder.”
Yes
5 3.3.3 CD-ROM or CD-R Copies
This section states, “One electronic copy of the proposal shall be submitted in the following formats: Microsoft (MS) Word
2010, MS Excel 2010, or MS-Power Point
2010, or Portable Document Format (PDF), as applicable.” Should offerors submit one electronic copy of each volume in ALL of the listed formats (as applicable) or ONE of
One of the listed formats
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
the listed formats?
5/6 3.3.4 Title Page
This section states that the title page must include, “Name, address, telephone numbers and e-mail address of the offeror (only one copy for all required volumes).” Does this mean only one copy of each volume should contain the name, address, telephones and e-mail address of the offeror, and it may be omitted from all other copies?
Yes
4.2.3 Past Performance Info Form and
Past Performance Questionnaires
When applicable, may offerors submit a
CPARS report in lieu of a Past Performance
Questionnaire?
No
N/A N/A Please confirm offerors may submit their proposals in Adobe PDF format.
Yes, with the exception of pricing. The pricing sheets
(attachment 4 and 5a-5h) need to be in Excel
Attachment 2 Questions
Attachment_2_-_Addendum_to_52.212-
2_FIAR_FINAL, Section 1.6 Step 2, “If the CO determines there is an OCI that cannot be mitigated, the government will not evaluate any further and the offeror will not continue to step 3.”
Will the Government afford the Offeror the opportunity to address any OCI mitigation actions the Government has an issue with prior to the PCO’s final determination?
The Government will take the actions that are in its best interest.
Attachment_2_-_Addendum_to_52.212-
2_FIAR_FINAL, Section 3.2.3, page 3
At the IDIQ level the Government will evaluate the cross reference matrix
(attachment 3) that assigns the proposed labor categories and FTEs to specific PWS
The Technical Cross Reference
Matrix used to assist in evaluation. The purpose of the matrix for both the technical and
RFP FA7014-17-R-5002
task areas.
In the evaluation criteria cited for this question, it states the cross reference matrix from attachment 3 will be evaluated based on the relationship of labor categories to
FTEs to PWS task areas.
In attachment 3 the cross reference matrix is identified as an example and the example does not include FTEs.
Please clarify that attachment 3 will not be evaluated – rather our proposed cross reference matrix would be evaluated.
past performance is to ensure the
Offerors address and map all information requested by the
Government. If an offeror provides a product similar to
Attachment 3, it will also be used to assist in the evaluation. If a product other than Attachment 3 is used, ensure it is easily identified as the cross reference matrix.
3 Attachment_2_-_Addendum_to_52.212-
2_FIAR_FINAL, Section 3.2.3, page 3
If applicable, the Government will evaluate any alternate labor categories proposed by the offeror.
This section discusses evaluation of alternate labor categories. Please confirm (1) the government is allowing Offerors to propose new labor categories in addition to those defined by the government, (2) since the new categories are required to fill a gap that the government categories do not cover, that the new categories would have distinct requirements and pricing that cannot be mapped to an existing category, and (3) those labor categories should be described in
Volume 1, Subfactor 3 Staffing
The offeror is allowed to use the labor categories listed, propose all new labor categories, add to the labor categories, or propose to remove some. The offerors have discretion to propose as they see fit. However, if the offeror is proposing alternate labor categories, they must be mapped to the Government provided labor categories.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
Plan/Recruiting and Retention Plan and priced in the pricing volume.
4 Attachment 2, Section 3.2.4, page 4 Could the Government please clarify if there is to be a letter “h” in the bulleted list?
Error has been corrected
5-8 Attachment 2 –Addendum to 52.212-2
Evaluation, Sections 3.3.6 – 3.3.8, pages
5-8
To determine relevancy in this performance category, the offeror can submit up to three
(3) submissions in this performance category.
How will the government weigh the past performance for up to three (3) submissions in each category? For example, do three
RELEVANT scores rate higher that one
VERY RELEVANT score?
The Government will use the evaluation criteria as provided in
52.212-1, Paragraph 3.3 to rate each submission.
Table 4 Attachment 2 – Addendum, Section
3.3.7.1, Table 4
Table 4, “Past/Present performance on audit contracts for entities with an annual budget greater than $60B performing 51% or more of the required effort.”
The Draft RFP provided a higher rating for bidders with federal audit experience, while the final RFP provides a higher rating for federal and commercial audit experience. We request that the government revise the experience requirements to provide a higher rating for federal audit experience because federal audits are significantly different and in some ways more complex than commercial audits. For example, No changes to the past/present performance evaluation criteria.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
commercial auditors do not need to understand and test internal controls and test account balances for the Statement of
Budgetary Resources, such as appropriations, reimbursable agreements, new obligations, undelivered orders, and unfilled customer orders. In addition, federal auditors assess federal agencies implementation of federal accounting standards, which are different than commercial accounting standards, thus auditors of federal financial statements will understand the unique aspects of federal accounting standards and be able to assist the
Air Force with complying with the federal accounting standards. The federal accounting standards include several unique accounting standards related to beginning balance valuation for PP&E and OM&S and exchange versus non-exchange transactions that a federal auditor will have experience with. Ultimately, a bidder with seasoned federal auditors will have a better understanding of what the Air Force needs to get to an unmodified opinion on its federal financial statements that follow federal accounting standards rather than commercial accounting standards.
Attachment 2 – Addendum to 52.212-2 –
Evaluation – Commercial Items
3.2.2 Subfactor 2: Management plan at the
IDIQ level
The evaluation of the
Management Plan and Past
Performance are not the same
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
3.3.6 Contract Management History, Table 3
Will the Government please confirm if the criteria (200 vs. 250 FTEs) to evaluate the
Management Plan and Past Performance
Qualifications is intentionally different, or should the criteria be the same, and therefore updated in the RFP?
and are intentionally different.
Paragraph 3.2.2 under the
Technical Factor refers to the evaluation of the offeror’s proposed management of plan of at least 200 FTEs in order to meet the PWS requirements.
Paragraph 3.3.6 under the
Past/Present Performance Factor provides the relevancy definitions for each submission in the Contract Management
History category.
No changes to RFP.
2/3 3.0 Evaluation Factors and Subfactors
Please confirm offerors must submit each
Factor (Technical, Past Performance, and
Cost/Price) as a separate electronic file.
Yes. Each Factor should have its own electronic file. All separate electronic files can be on one
CD-R or DVD-R.
Attachment 6 – Past Performance Information Form
Attachment 6 – Past Performance
References that Addresses Performance
Categories
G. Describe how contract requirements relate to contract management history, audit, or audit advisory support.
Will the Government please confirm that the requirement to address Magnitude and
Complexity within Attachment 6, is no longer required, as that same language was removed from Attachment 2 52.212-2.
Updated attachment 6.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
Attachment 6 – Past Performance
References that Addresses Performance
Categories
When filled-in, this form shall not exceed eight (8) pages.
The template states the form shall not exceed eight pages. However, the Offeror can submit up to nine qualifications and the Past
Performance Volume cannot exceed 100 pages. If the Offeror submits nine qualifications and the template cannot exceed eight pages, the total maximum page count for the Past Performance Volume under this scenario is 72 pages.
Will the government update the RFP to remove the page limitation at the individual past performance template level, and instead keep the page limit requirement at the overall volume level?
Updated attachment 6
Attachment 6 – Past Performance
References that Addresses Performance
Categories
I. Continuation for Items A through H.
Will the Government please delete Section I from the template because it is not required since all offerors will complete the template
‘soft copy’ therefore the spacing will automatically adjust to fit the content.
Updated attachment 6
Attachment 6 - Past Performance Form, Section G and corresponding RFP Past
Performance Evaluation Criteria
Magnitude:
Complexity:
How does the Government define Magnitude and Complexity of each past performance
Updated attachment 6
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
type?
Attachment 9 PWS Questions:
Attachment_9_AF_FIAR_PWS_FINAL, Table 1 performance locations.
The locations listed in the table are not consistent with the task order attachments
5a-g. Notably, Los Angeles AFB is not included in the table.
Table 1 clarified to state and associated bases for MAJCOMs.
6 and
DRAFT
RFP 59
Attachment_9_AF_FIAR_PWS_FINAL, Section 1.4.1, page 6 and Draft RFP
Q&A Question #9 (page 59 of 94)
“AF Major Command (MAJCOM) / Direct
Reporting Unit
(DRU) Liaison Support. The Contractor shall provide MAJCOM liaison support between MAJCOMs/ Functional Community and SAF/FMFFA to assist with sustaining audit readiness, Office of Management and
Budget (OMB) Circular A-123 annual cycles, and financial statement audit liaison support.”
Does the Government expect MAJCOM liaison support to be collocated at the
MAJCOMs?
Government Response: Yes
Follow-up Question: There are numerous locations in Table 1 showing where
MAJCOM Liaisons are required. Yet in
Table 4 there are no Government seats for these people. To be effective at performing the Liaison role these people need to be co-located with the MAJCOM client vice
The IDIQ PWS is identifying that the listed support may be needed at the MAJCOMs. If needed then a Task Order will be issued for the MAJCOM. The RFP has task orders for AFSPC, AFMC already.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
located in an office nearby. Suggest the
Government identify seats collocated with the MAJCOM client at these locations or permit them to be centrally staffed at another contractor location.
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.2.1.1, page 8
The PWS requests that the contractor shall advise and assist with the implementation and compliance with OMB Bulletin No. 01-
02; however, this bulletin has been superseded and relates to requirements that the auditor would follow rather than management. We recommend the government remove such bulletin from the list.
Typo corrected
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.3.1, page 12
The PWS indicates that the contractor assist with the implementation of corrective action plans. We recommend that the government remove “implementation”
No change
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.6.1, page 21
“Proactively analyze the progression of audit readiness/sustainment for financial statement audits and provide strategic and implementable solutions to address gaps”.
Will the Government please confirm if there is an established process for assessing progress? Are there existing performance indicators? If not, would the contractor be expected to develop a measurement tool and/or key performance indicators?
The contractor is expected recommend a process to the government and then execute the approved process.
21 Attachment_9_AF_FIAR_PWS_FINAL, “An integrated and coordinated approach to There is no effective existing
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
Section 2.6.1, page 21 execute this initiative through the development of communication and change management strategies.”
Will the Government please confirm if there is an existing governance model that would allow the contractor to have access to integration points?
governance model.
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.6.1, page 21
The contractor shall design/develop, provide broad-based communications and change management support for program management…
Will the Government please confirm who will ultimately approve the communication efforts being designed and developed?
SAF/FMFA leadership.
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.6.1, page 21
Assess communication and outreach strategies, approaches, and forums used internally and externally to assist SAF/FMF with internal collaboration and
Will the Government please confirm if there are existing methods or measurement tools being utilized? Are there existing key performance indicators established?
There are existing newsletters, monthly updates, established
POCs. There are no existing key performance indicators.
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.6.1, page 21
Support communication, collaboration and change management initiatives, including road shows and training events.
Formal training moved to Task 9 in the PWS. A Task Order will be issued when a specific training requirement is identified. See the
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
Will the Government please provide more information around expected support of initiatives such as road shows and training events (i.e., develop materials, provide onsite logistics, AV support, facilitation support, etc.)
updated PWS attachment.
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.6.1, page 21
Contractor to document, prioritize, and recommend solutions for the most critical areas related to financial management and audit readiness that require change management support and update on a periodic and routine basis.
Will the Government confirm who receives the recommendations and ultimately approves priority and solutions?
SAF/FMFA leadership
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.6.2, page 21
Create training content
Will the Government please provide an estimated number of course per year and in what format (instructor led vs. computer based)? If computer based, will the
Government please confirm if the training content is required to be completed on government issued computers?
Formal training moved to Task 9 in the PWS. A Task Order will be issued when a specific training requirement is identified.
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.6.2, page 22
Support the development and delivery of course curriculum.
Formal training moved to Task 9 in the PWS. A Task Order will
RFP FA7014-17-R-5002
Will the Government please confirm, on average, how long are the training courses?
requirement is identified.
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.6.2, page 22
Support the development and delivery of course curriculum.
Will the Government please confirm that delivery support is limited to the logistics noted in the PWS or is delivery support expected to include the contractor delivering the training course
Formal training moved to Task 9 in the PWS. A Task Order will be issued when a specific training requirement is identified.
Attachment_9_AF_FIAR_PWS_FINAL, Section 2.6.2, page 22
Support the development and delivery of course curriculum.
In support of delivery of course curriculum, will the Government please confirm if travel is required to support, and if so, how much travel is anticipated.
Formal training moved to Task 9 in the PWS. A Task Order will be issued when a specific training requirement is identified.
Attachment_9_AF_FIAR_PWS_FINAL, Section 5.2.2, page 30
We request that the government clarify that a secret or interim secret clearance is required prior to starting work as the current wording is not clear.
PWS updated.
Attachment_9_AF_FIAR_PWS_FINAL, Section 6.7.4, page 34
We request that the government clarify if the reference to section 6.7.4 is correct or should be referred to another section.
PWS updated.
Attachment_9_AF_FIAR_PWS_FINAL, Section 7.3, page 38 and Ordering Guide
8.1, and Draft RFP Q&A #22 (page 14 of 94)
The Government indicates in the Draft RFP
Q&A that this statement was “Deleted,” however the language is still included in the
The language has been deleted
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
Final PWS.
Question included:
PWS paragraph 7.3 states, “The CORs are required to monitor and certify the
Contractor’s performance for any work conducted off-site; therefore the Contractor shall provide a plan to the Government for monitoring the work accomplished and hours expended by labor category and for each
Task Order that will allow the COR to validate the level of effort performed and the number of hours invoiced.”
The Ordering Guide, paragraph 8.1 Invoice
Data does not mention a requirement to report hours.
Reporting hours and hours by labor category on a FFP task order is in conflict with the contract type.
Please clarify whether the Government intends to manage this FFP IDIQ as a “true”
FFP, with invoicing based on either deliverable milestones or monthly increments of the fixed price, or as fixed-price labor hour or time-and-materials, consistent with a requirement to report hours by labor category.
Attachment_9_AF_FIAR_PWS_FINAL, Section 10.4 Computers, page 43
The government will provide laptops as part of this requirement as described in Table 4.
Laptops are only provided to personnel on site. Laptops are not to leave government space unless specifically authorized by
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
Will laptops be provided to contractor personnel who are not assigned to an on-site workstation?
exception.
Attachment_9_AF_FIAR_PWS_FINAL, Section 12, page 46
(See 4a-3, Associate Contractor Agreement)
In Section 12 Organizational Conflict of
Interest, could the Government please clarify or provide a copy of 4a-3, Associate
Contractor Agreement?
Deleted
Attachment_9_AF_FIAR_PWS_FINAL, Section 12, page 46
Section 12 of the PWS (RFP Attachment 9) states in part: “To avoid, neutralize, or mitigate a potential conflict of interest, the
Contractor shall not, during performance of the contract, engage (as a prime Contractor, subcontractor, supplier, or consultant) in any other contract that would design, develop, implement, operate, or sustain any general ledger system or deliverable that is based on a recommended solution provided under this contract. The following systems apply:
Defense Enterprise and Accounting
Management System (DEAMS), Next
Generation IT (NextGenIT), Air Force
Integrated Personnel and Payment System
(AFIPPS).”
Does this restriction apply only to the prime contractor or to both the prime contractor and its subcontractors?
Per the PWS the restriction applies to “as a prime contractor, subcontractor, supplier, or consultant.”
Attachment_9_AF_FIAR_PWS_FINAL, Section 12, page 46
Section 12 of the PWS (RFP Attachment 9) states in part: “To avoid, neutralize, or
Offerors, Prime and
Subcontractors, have to submit
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
mitigate a potential conflict of interest, the
Contractor shall not, during performance of the contract, engage (as a prime Contractor, subcontractor, supplier, or consultant) in any other contract that would design, develop, implement, operate, or sustain any general ledger system or deliverable that is based on a recommended solution provided under this contract. The following systems apply:
Defense Enterprise and Accounting
Management System (DEAMS), Next
Generation IT (NextGenIT), Air Force
Integrated Personnel and Payment System
(AFIPPS).”
Can the prime contractor use subcontractors that work on DEAMS, NextGenIT or
AFIPPS as long as these subcontractors do not work on any task areas on this contract that are related to the subcontractor’s work on DEAMS, NextGenIT or AFIPPS?
an OCI plan to show how they will mitigate an OCI or potential
OCI. The CO will make a determination if the plan will be accepted or rejected.
12 Page 12/ Task 5: FIAR IT
Systems/Integration/Support
2.5.2.1: Security Controls Assessment. The contractor shall provide support assessing, documenting, testing and monitoring internal controls in alignment with current AF, FISCAM, Risk Management Framework
(NIST 800-53), and FIAR Guidance related to systems utilized in the performance of material business processes.
a) In the final PWS section 2.5.2.1, Risk
Management Framework (NIST 800-53), was added as one of the standards that will
The scope of the NIST publications implementing
FISMA is not limited to NIST
800-53 and would include additional NIST publications as they relate to audit. Other such publications needed to address the support of RMF include the
Federal Information System
Controls Audit Manual
(FISCAM), and AFI 17-101, RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
be expected to be used to assess security controls. However, answers to questions regarding contractor’s involvement in IT
Support for FISMA (sections 2.5.2.1 and
2.5.2.4), indicated that contractors will not be required to provide IT support over
FISMA nor support on FISMA audit remediation efforts. Will the government elaborate on the extent of RMF NIST 800-53 compliance tasks and expectations?
b) We request the government provide clarification on the answers provided for #40 and #42 of our previously submitted questions to the draft PWS. The government’s response stated that no FISMA support will be required by the contractor.
However, there are a few instances where the
PWS requires contractor support for RMF
(see 2.5.2.1 and 2.5.2.21) and DoDI 8510.01
(i.e. DoD RMF) mandates FISMA compliance. Can clarification please be provided to the government’s original response? Is the scope of FISMA support simply limited to NIST 800-53? Or are there additional NIST publications that will need to be addressed during the support of RMF?
Risk Management Framework for Air Force Information
Technology. The contractors will be required to provide advisory support to information security owners, managers and assessors. Contractors will assist with policy creation and implementation guidance for the
Risk Management Framework, including reviewing controls, analyzing and performing assessments to validate completed activities (i.e., financial and cybersecurity controls) meet audit standards for
FIAR compliance.
19 Page 19/ Task 5: FIAR IT
Systems/Integration/Support
2.5.2.9: Support the AF Business
Capability Acquisition Cycle (BCAC) as required for development activity related to FIAR business processes. This support
For AFWCFi current systems (or the WCF portion of them) to be subsumed are:
ABS
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
shall include: Provide research and support to ensure future BCACAF WCF
DBS systems material to audit are FIAR compliant.
Will the Government provide additional information about the WCF Defense
Business Systems (DBS)?
‒ Can you identify them in
PWS ATTACHMENT D -
Feeder Systems?
‒ How many are they?
‒ Will they be hosted by Air
Force or other third party organizations?
This information influences the offeror’s ability to document a clear and concise approach and methodology within the response to the RFP, and informs staffing and pricing.
ABSS
APO
DIFMS
FIABS
GAFS-R
SMAS
Feeder systems are:
AFEMS, ATAAPS, DCPS,
DMAPS, DMLSS, ILS-S, SCS
Hosting decisions have not been made at this time.
For CON-IT systems to be subsumed are: ACPS, ConWrite, SPS.
20 Page 20/Task 5: FIAR IT
Systems/Integration/Support
2.5.2.20: Assist SAF/FMF in the development and sustainment the annual
Statement on Standards Attestation
Engagement 18 assertion package for
DEAMS in accordance with AICPA standards and OUSD FIAR Guidance.
Support shall include all control objective testing in support of assertion.
Analyzing SSAE18 reports, designing and implementing processes to review and validate CUECs over relevant systems
Two separate requirements.
2.5.2.20 is to develop the management assertion for the
DEAMS SSAE. As part of the support, there is associated annual updates and annual testing.
2.2.1.8 is the monitoring of all
SSAE reports that are applicable to the Air Force and create
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
owned by others. Analysis feeds SSAE monitoring report in 2.2.1.8.
Can the Government please clarify what the contractor will be expected to do with regards to SSAE 18 reports? Will the contractor be expected to test controls objectives and issue SSAE 18 reports AND review SSAE 18 reports issued by other
IPAs?
Are the CUECs referenced here related to systems owned by Air Force (e.g. DEAMS) or systems owned by service providers (e.g.
DFAS, DLA, U.S Bank, etc.)?
monitoring reports that document the review and associated testing of Air Force internal controls to address CUEC requirements in each of the SSAEs. Sample monitoring report was provided in Bidder’s Library.
Bidder’s Library document
SSAE SOC Listing 051917 listed all the SSAEs known as of that point in time, approximately 20.
21-22 PWS_2.6.2 Page #21 -22 The schedule shall also include delivery dates of sustainment courses for existing course content, training medium (e.g., in-person, virtual instructor, e-learning self-study) and a target list of USAF participants, etc.
We request that the Government clarify what existing content the government has and how this compares to the content the contractor is expected to create as indicated in the step above?
We request the Government provide added
Formal training moved to Task 9 in the PWS. A Task Order will requirement is identified.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
clarity for this Section such as:
a. How many courses need to be sustained?
b. How long are the courses currently?
c. How much time will be allocated for the development of new courses?
c. Are they mixed medium or all in person trainings?
d. What platform/LMS are courses currently stored and will the contractor be responsible for uploading and testing the electronic content?
e. Will the contractor be required for certifying courses for CETs?
22 Page 22, 2.7 Task 7: Acquisition
Program Office Valuation Sustainment
“… Acquisition Program
Office…Sustainment”
The title of Task 7 was changed from
“Existence and Completeness, and
Valuation” to “Acquisition Program Office
Valuation Sustainment”. Will the Air Force please clarify why the title of Task 7 was changed, and whether requirements have been changed for Task 7 (for example, supporting the substantiation of existence and completeness of assets) given there were inconsequential changes to the sub-tasks?
The title was changed to better reflect the requirements identified in the PWS.
Requirements did not change.
See updated PWS with the attachments.
22 Page 22, 2.7 Task 7: Acquisition
Program Office Valuation Sustainment
“2.7.3 … See PWS Attachment B –
Deliverables…”
The reference to “PWS Attachment B –
Deliverables” is made in Sub-tasks 2.7.3, PWS Attachment B updated.
RFP FA7014-17-R-5002
Page # Section, Paragraph, or Attachment Question/Comment/Clarification Government Responses:
2.7.6, 2.7.8, and 2.7.10.3, but “PWS
Attachment B – Deliverables” does not reference Task 7 and appears incomplete.
Will the Air Force be updating “PWS
Attachment B – Deliverables?”
Attachment
D
PWS ATTACHMENT D - Feeder
Systems
PWS ATTACHMENT D:: ** New System
Being Deployed, or related old system.
The key in PWS Attachment D indicates
“**” for new system being deployed or related old system, however this identifier seems not to be included in the list for any of the systems. Will the Government please update Attachment D to identify which are new systems to be deployed and which ones are related old systems?
PWS Attachment D updated.
New systems are NexGen and
CON-IT.
Attachment
10 Page 6
Attachment F and Attachment 10 page 6
(section 2.3)
2.3 Contractor/ Key Personnel
2.3.1 Program Manager: The Contractor’s
Project Manager is responsible for the overall execution of the task order. This individual will serve as the focal point for the CM/CO and/or PM assigned to the IDIQ contract and may interface with the customer, as needed.
2.3.2 Project/Task Lead: The Project/Task
Lead for each Task Order is responsible for technical or quality control oversight, this individual may be the Project Manager
2.3.3 Engagement Partner: The Engagement
Partner is responsible for overseeing the
PWS…