Attachment_9_JBA_Entire_CSR_View.pdf

PDF 164 KB Posted

Attached to
Data Center Reconfiguration Federal contract opportunity
Solicitation number
FA7014-15-T3002
Issued by
Department of the Air Force Headquarters District Washington

About this file

CSR View - New schematic

View the file

Other files for this federal contract opportunity

Other files attached to Data Center Reconfiguration, newest first.
File Type Posted
Equipment_List_Amendment_2.docx DOCX document
Attachment_10_Schematic_3.pdf PDF
Attachment_1_SOW_Data_Center_Amendment_2.docx DOCX document
Attachment_9_Schematic_1.pdf PDF
Attachment_8_Schematic_2.pdf PDF
Solicitation.pdf PDF
Attachment_8_JBA_Entire_CSR_Power.pdf PDF
Attachment_10_JBA_SCE_Power.pdf PDF
Attachment_4_Eval_Method_V2.pdf PDF
Attachment_2_QASP_Data_Center.pdf PDF
Attachment_1_SOW_Data_Center.pdf PDF
Attachment_7_Equipment_list.pdf PDF
Amendment_1_Q A.docx DOCX document
Attachment_4_Eval_Method_Amendment_1.pdf PDF
Attachment_2_QASP_Data_Center.pdf PDF
Attachment_9_Materials_List.pdf PDF
Solicitation_FA7014-15-T-3002.pdf PDF
Attachment_5_Past_Performance_Information_Sheet.pdf PDF
Attachment_6__Cost_ _Price__Worksheet.xls XLS spreadsheet
Attachment_7_SCE_Data_Center.pdf PDF
Attachment_8_SCE_Data_Center_TO_BE.pdf PDF
Attachment_3_Justification_and_Approval_(Signed).pdf PDF
Attachment_1_SOW_Data_Center.pdf PDF
Attachment_4_Eval_Method.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

A

B

C

D

E

D 31D 30D 29D 28D 27D 26D 25D 24D 23D 21D 19D 18D 17D 16D 15D 12D 11D 10D 9D 8D 7D

RC

D

RC

D

6D 5D

RC

D

RC

D

4D 3D 2D 1D

29E 28E 27E 26E

RC

6E

RC

5E

25E

RC

4E

RC

3E 21E 20E 19E 18E 17E 16E

RC

6E 13E

RC

3EE

32C 31C 30C 17C 16C 14C 13C 12C 11C 10C 9C 8C 7C

RC

C

RC

C

6C 5C

RC

C

RC

C

4C 3C 2C 1C

RC

B

2B 1B3B4B5B

RC

B

6B7B8B9B10B11B12B13B14B15B16BRC

0B

1A2A3A

Last Updated January 27, 2014 By Kenneth Ahn

AFDW Current CSR & SCE Elevation

FOR OFFICIAL USE ONLY

CA CB CC

15C

22D

23E 15E 14E

14D 13D

22E24E

UPS E1

UPS 6

UPS 4

UPS 2

UPS 1

UPS 3

In-Line Rack Cooling

Controlled by APC Front of the Rack Existing Circuit Breaker New Circuit Breaker

F21F24F25F26F27F28F

UPS F1

RC

0F

RC

2F

22FRC

6F

RC

5F

23F

AFLOAF

UPS 5

10F11F12F18F19F 9F13F14F17F29F 20F

A26A27A28A29A30A

26B27B28B29B30B

Controlled by APC Controlled by ANG

Controlled by 744th

Propose AFDW SCE

Mechanical Switches

PCCIE Battery UPS

SC

E

U

PS

St or ag e

A re a

RC

5B

RC

6B

RC

5A

RC

6A

RC

0A

RC

1A

U

PS

29CRPDU

1F2F

24A25A RC

3A

RC

4A

24B25B

RC

3B

RC

4B

23A

23B

3E 2E 1E 1E

UPS 8

8F 3F

RC

7C

RFID Antenna

RFID Antenna

New 1558 Core

Main Entrance

SC

E

O ff ic e

A re a

RC

9B

RC

8B

18B B

4A

RC

A

RC

A

5A6A7A8A9A10A11A12A13A14A

RC

4A

RC

5A

16A17A18A19A20A 15A

18C

17B

Page-1�

File details come from the government source that posted it. Updated .