Amendment_1_Q A.docx

DOCX document 17 KB Posted

Attached to
Data Center Reconfiguration Federal contract opportunity
Solicitation number
FA7014-15-T3002
Issued by
Department of the Air Force Headquarters District Washington

About this file

Questions Answers

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1 – Q&A

1. The Solicitation issued on 7-31-15 with questions due on 7-31-15. Hopefully, you will accept these questions even though they were not submitted on 7-31-15.

- Questions are due by 8-11-15.

2. The FBO Announcement says responses are due on 8-14-15 at 4 pm. The Evaluation document says 8-7-15 at 4:30 pm.

- The evaluation document is wrong. The proposals are due by 8-14-15

3. HubZone is checked on page 5 of 14 of the Solicitation. Is this a HubZone set-aside?

-This is not a hub-zone set-aside.

4. Buy American is checked on page 7 of 14 of the Solicitation. Can you clarify which equipment and materials are expected to be American made?

- FAR 52.225-1 does apply.

- FAR 52.225-3 does apply.

- Required American made equipment: AP-8865 - Rack PDU 2G, Metered, ZeroU, 8.6kW, 208V, (36) C13 & (6) C19 & (2) 5-20

5. There were two Visio diagrams provided with the Solicitation in PDF format. Could you share those in Visio format?

-Cannot share original diagrams in Visio Format.

6. Paragraph 4.1.17 requires that we set up the RC100 units in group configurations, but there is no information in the bid documents that describes the group arrangements. Are the four relocated units intended to be in their own group?

- RC100 grouping was explained in the walk-thru...No the RC100's are separated thru-out the Data Center.

7. Paragraph 4.1.21 of the SOW refers to removal of 40kW and 80kW Main PDUs. These PDUs are part of APC UPS Systems, which would also include batteries and power modules. Can you clarify the demo/removal requirements? Some of this equipment may need special handling and disposal.

- Data Center Manager briefed during the walk thru. Will not need any special tools or equipment for removal or disposal.

8. Paragraph 4.1.24 in the SOW refers to 32 rack PDUs, but BOM shows only 26. Please clarify which is required.

- 32 Rack PDUs

9. A number of racks in the new layout are to be fed with 50A power circuits. There are no 50A rack PDUs listed in the APC parts list. Please confirm that this is correct.

- 8 50A Rack PDUs