Quantity Item Description 36 AP8865 Rack PDU 2G, Metered, ZeroU, 8.6kW, 208V, (36) C13 & (6) C19 & (2) 5-20 8 AP7516 Rack PDU, Basic, 1U, 14.4kW, 208V, (6) C19 2 AR8560 Cable Trough, Open Bottom, 600mm 2 AR8162ABLK Data Cable Partition, NetShelter, 600mm Wide

1 PSX-PDU120V 120 V TYPE PDU

1 ELECTRICAL SYSTEM 120V -ELECTRICAL SYSTEM 120V

1 0G-PDPB150G6FATO - -ASSY 84P PDU BASE UNIT ATO

1 DISTRIBUTION BREAKERS 120V -TYPE & AMP OF DISTRIBUTION CKT BRKS

18 0M-5366 - -S/A TESTED BRKR 3P 30A PNL

8 0M-6866 - -S/A TESTED 3P 50A CKT BRKR 120/240 UL

1 OPTIONS & ACCESSORIES 120V -OPTIONS AND ACCESSORIES

6 0G-8310 - -KIT FILLER SQD NQ PNL QTY 15 ATO

17 0G-8313 - -PLUG FILLER GLAND PLATE 84P PDU ATO

1 RACK COLOR -RACK COLOR

1 0G-8315 - -ASSY PACKAGING FINAL 84P PDU ATO

1 PSX-PDU120V 120 V TYPE PDU

1 ELECTRICAL SYSTEM 120V -ELECTRICAL SYSTEM 120V

1 0G-PDPB150G6FATO - -ASSY 84P PDU BASE UNIT ATO

1 DISTRIBUTION BREAKERS 120V -TYPE & AMP OF DISTRIBUTION CKT BRKS

18 0M-5366 - -S/A TESTED BRKR 3P 30A PNL

8 0M-6866 - -S/A TESTED 3P 50A CKT BRKR 120/240 UL

1 OPTIONS & ACCESSORIES 120V -OPTIONS AND ACCESSORIES

6 0G-8310 - -KIT FILLER SQD NQ PNL QTY 15 ATO

17 0G-8313 - -PLUG FILLER GLAND PLATE 84P PDU ATO

1 RACK COLOR -RACK COLOR

1 0G-8315 - -ASSY PACKAGING FINAL 84P PDU ATO

2 WSTRTUP5X8-PD-50 Start-Up Service 5X8 for (1) InfraStruxure 60kVA / 150kVA PDU 1 WSITECOORD Site Coordination Service 2 WASSEMUPS5X8-PX-21 Scheduled 5X8 Assembly Service for Symmetra PX 40 kW UPS and/or PDU

Electrical Installation by Schneider Electric Installation Team with the following

SOW:

Below bill of materials must be purchased as a single solution to avoid on-site installation complications

- Shut down and remove two existing 80kPDU from main room computer room.

- Receive and unpack all new equipment listed above

-Remove all whips from existing PDU's and from existing cabinets in Glass Wall room

- Install new 150kW PDU Cabinets into customer dedicated spaces

- Run new feeds from previous 80kW PDU's into Row C of glass wall room

- Provide and install 36 - new 208v 3phase 30 amp feeds to customer designated cabinets in glass wall room from new 150kW PDU's.

- Provide and install 16 - new 208v 3phase 30 amp feeds to customer designated cabinets in glass wall room from new 150kW PDU's.

- Remove and dispose of existing sub panel C in main computer room

-Install 42 Pole 208v 3Phase panel in Glass wall room including new feeds from existing

UPS panel

- Move all glass room cooling feeds to newly installed panel C

- Provide Project Management, and coordination between Customers representative, APC Factory Electrical Contractor, Freight Company and APC certified service technician to insure a successful completion of the Project.

Mechanical Installation by Schneider Electric Installation Team with the following SOW:

- Shut down and move customers four existing ACRC100 In Row Cooling units from main computer room to glass wall room row C

- Disconnect and drain supply lines of each of the ACRC100 Units from existing Cooling

Distribution units

- Run new insulated PEX lines from CDU units to new ACRC100 locations in Glass Wall

Room

-Provide and install new condensate lines from the cooling units to the condensate pump

- Provide and install ( 4 ) overhead power whips to provide power to the existing cooling units in their new locations

- Provide Project Management, and coordination between Customers representative, APC Factory Electrical Contractor, Freight Company and APC certified service technician to insure a successful completion of the Project.

1 QWINSTALL-QBED69929

QWINSTALL-QBED695661