Attachment_7_Equipment_list.pdf
PDF 69 KB Posted
- Attached to
- Data Center Reconfiguration Federal contract opportunity
- Solicitation number
- FA7014-15-T3002
About this file
New Equipment List
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quantity Item Description 36 AP8865 Rack PDU 2G, Metered, ZeroU, 8.6kW, 208V, (36) C13 & (6) C19 & (2) 5-20 8 AP7516 Rack PDU, Basic, 1U, 14.4kW, 208V, (6) C19 2 AR8560 Cable Trough, Open Bottom, 600mm 2 AR8162ABLK Data Cable Partition, NetShelter, 600mm Wide
1 PSX-PDU120V 120 V TYPE PDU
1 ELECTRICAL SYSTEM 120V -ELECTRICAL SYSTEM 120V
1 0G-PDPB150G6FATO - -ASSY 84P PDU BASE UNIT ATO
1 DISTRIBUTION BREAKERS 120V -TYPE & AMP OF DISTRIBUTION CKT BRKS
18 0M-5366 - -S/A TESTED BRKR 3P 30A PNL
8 0M-6866 - -S/A TESTED 3P 50A CKT BRKR 120/240 UL
1 OPTIONS & ACCESSORIES 120V -OPTIONS AND ACCESSORIES
6 0G-8310 - -KIT FILLER SQD NQ PNL QTY 15 ATO
17 0G-8313 - -PLUG FILLER GLAND PLATE 84P PDU ATO
1 RACK COLOR -RACK COLOR
1 0G-8315 - -ASSY PACKAGING FINAL 84P PDU ATO
1 PSX-PDU120V 120 V TYPE PDU
1 ELECTRICAL SYSTEM 120V -ELECTRICAL SYSTEM 120V
1 0G-PDPB150G6FATO - -ASSY 84P PDU BASE UNIT ATO
1 DISTRIBUTION BREAKERS 120V -TYPE & AMP OF DISTRIBUTION CKT BRKS
18 0M-5366 - -S/A TESTED BRKR 3P 30A PNL
8 0M-6866 - -S/A TESTED 3P 50A CKT BRKR 120/240 UL
1 OPTIONS & ACCESSORIES 120V -OPTIONS AND ACCESSORIES
6 0G-8310 - -KIT FILLER SQD NQ PNL QTY 15 ATO
17 0G-8313 - -PLUG FILLER GLAND PLATE 84P PDU ATO
1 RACK COLOR -RACK COLOR
1 0G-8315 - -ASSY PACKAGING FINAL 84P PDU ATO
2 WSTRTUP5X8-PD-50 Start-Up Service 5X8 for (1) InfraStruxure 60kVA / 150kVA PDU 1 WSITECOORD Site Coordination Service 2 WASSEMUPS5X8-PX-21 Scheduled 5X8 Assembly Service for Symmetra PX 40 kW UPS and/or PDU
Electrical Installation by Schneider Electric Installation Team with the following
SOW:
Below bill of materials must be purchased as a single solution to avoid on-site installation complications
- Shut down and remove two existing 80kPDU from main room computer room.
- Receive and unpack all new equipment listed above
-Remove all whips from existing PDU's and from existing cabinets in Glass Wall room
- Install new 150kW PDU Cabinets into customer dedicated spaces
- Run new feeds from previous 80kW PDU's into Row C of glass wall room
- Provide and install 36 - new 208v 3phase 30 amp feeds to customer designated cabinets in glass wall room from new 150kW PDU's.
- Provide and install 16 - new 208v 3phase 30 amp feeds to customer designated cabinets in glass wall room from new 150kW PDU's.
- Remove and dispose of existing sub panel C in main computer room
-Install 42 Pole 208v 3Phase panel in Glass wall room including new feeds from existing
UPS panel
- Move all glass room cooling feeds to newly installed panel C
- Provide Project Management, and coordination between Customers representative, APC Factory Electrical Contractor, Freight Company and APC certified service technician to insure a successful completion of the Project.
Mechanical Installation by Schneider Electric Installation Team with the following SOW:
- Shut down and move customers four existing ACRC100 In Row Cooling units from main computer room to glass wall room row C
- Disconnect and drain supply lines of each of the ACRC100 Units from existing Cooling
Distribution units
- Run new insulated PEX lines from CDU units to new ACRC100 locations in Glass Wall
Room
-Provide and install new condensate lines from the cooling units to the condensate pump
- Provide and install ( 4 ) overhead power whips to provide power to the existing cooling units in their new locations
- Provide Project Management, and coordination between Customers representative, APC Factory Electrical Contractor, Freight Company and APC certified service technician to insure a successful completion of the Project.
1 QWINSTALL-QBED69929
QWINSTALL-QBED695661
File details come from the government source that posted it. Updated .