Atch 6_Questions and Answers (RFIs).pdf
PDF 310 KB Posted
- Attached to
- FY27 USAFA LRS/LGRC CADET T-SHIRTS
- Solicitation number
- FA700027Q0003
About this file
Vendor Solicitation Inquiries & Clarification Requests
RFQ FA700027Q0003 – USAFA T-Shirts
This document is a comprehensive questions-and-answers file addressing vendor inquiries for a U.S. Air Force Academy t-shirt procurement. The solicitation is a 100% Small Business Set-Aside requiring all quoted items to be manufactured by a domestic small business concern under NAICS 315250 (Cut and Sew Apparel Manufacturing). Nonmanufacturer small businesses may partner with domestic small-business manufacturers provided the manufacturing partner is identified in Attachment 2 and Berry Amendment compliance (100% domestic sourcing) is certified in Attachment 3.
The contract covers three line items: CLIN X001 (Personalized Type II and Type III T-Shirts), CLIN X002 (Blank T-Shirts), and CLIN 0003 (First Article Sample—one Type II Large shirt). The Government estimates approximately 15,000–16,250 total annual t-shirt quantities across a base period and four option periods concluding September 30, 2031. Personalized shirts must be delivered within 21 calendar days after receipt of cadet name rosters; blank inventory must be pre-staged and delivered within a revised 120-day After Receipt of Order (ARO) window (originally 150 days) to meet an end-of-May 2027 delivery deadline. The anticipated award date is on or before December 10, 2026. Unit prices must remain fixed throughout each option period and cover all labor, materials, FOB Destination delivery, and expedited delivery requirements at no additional charge. The first article sample is due within 30 calendar days ARO with a 14-calendar-day Government review window. A NIST SP 800-171 assessment score must be posted in the Supplier Performance Risk System (SPRS) prior to contract award because cadet rosters contain Controlled Unclassified Information (CUI) requiring DFARS 252.204-7012 compliance flowdown to all subcontractors, including decorators and manufacturers. All textile components—yarn, fabric, thread, trim, reflective transfers, and printing inks—must meet Berry Amendment domestic sourcing requirements. Quoters must submit a completed Attachment 2 (Nonmanufacturer Rule Compliance Declaration and Price Schedule) and Attachment 3 (Berry Amendment Certificate of Conformance) with their quotes; no third-party laboratory test reports are required at quote submission but may be required prior to first delivery. Historical sizing data and past performance guidance clarify that nonmanufacturer quoters must submit references demonstrating their own prime contractor experience (contract administration, supply chain logistics, customer service, distribution management) in addition to the manufacturing partner's references, with both entities' records evaluated relative to their distinct contract roles. No guaranteed minimum purchase quantity applies; all quantities are estimates for evaluation purposes.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vendor Solicitation Inquiries & Clarification Requests
RFQ FA700027Q0003 – USAFA T-Shirts
1. Cadet rosters: the solicitation says rosters contain CUI and PII, and Attachment 5 lists DFARS 252.204-7012 and a clause titled "NIST SP 800-171 DoD
Assessment Requirements." Must a quoter have a current NIST SP 800-171 DoD
Assessment score posted in SPRS at the time of quote, or is that needed only before rosters are sent?
In accordance with DFARS 252.204-7019, a current NIST SP 800-171 assessment score posted in SPRS is not required at quote submission but is mandatory prior to contract award. An award cannot be made to any quoter lacking a posted SPRS score at the time of award.
2. The solicitation says the contractor "shall not disseminate or disclose rosters to any third party". For a nonmanufacturer quoter, may the contractor pass rosters to its domestic small business manufacturer for name printing, or will the
Government send rosters directly to that manufacturer?
The Government will transmit rosters directly to the Prime Contractor.
The Prime Contractor is authorized to provide rosters to its approved domestic manufacturing/decorating partner identified in Attachment 3 solely for contract performance, provided the partner complies with all
CUI/PII safeguarding, handling, and 30-day post-delivery destruction requirements.
3. Past performance: may a nonmanufacturer's Volume III include contracts and questionnaires of its domestic small business manufacturer, clearly labeled as the manufacturer's?
Yes, but the quoter must also provide past performance references for itself. A nonmanufacturer quoter must submit references reflecting its own past performance as a prime contractor (e.g., contract administration, supply chain logistics, customer service, and distribution management) in addition to references for its designated domestic small business manufacturer identified in Attachment 3.
The quote must clearly differentiate between the past performance of the prime contractor and that of the manufacturer, detailing each entity's specific responsibilities. The Government will evaluate both entities' records relative to the distinct roles they are proposed to perform under the contract.
4. First article quantity: Attachment 1, PD 174, section 3 asks for "three t-shirts, one of each type", while CLIN 0003 lists 1 EA. Which quantity governs?
Please follow the solicitation requirement for one (1) first article sample
CLIN 0003.
5. Period: Attachment 3 item 11 says "through 30 September 2032", while the last option period ends 30 September 2031. Which date is correct?
30 September 2031.
6. The Contracting Officer's email appears as danielle.hyde@us.af.mil in the notice and danielle.hyde.2@us.af.mil in the solicitation. Which address should receive quotes? This note is copied to both.
danielle.hyde.2@us.af.mil
7. Are small apparel businesses permitted to partner with an American-based manufacturer to produce and fulfill the T-shirt requirements?
Yes. Under the Nonmanufacturer Rule (13 CFR § 121.406 and RFO Part
19), small businesses may partner with an American manufacturer provided:
• Small Business Status: The manufacturing partner must qualify as a small business under NAICS 315250. Partnering with large manufacturers is prohibited.
• Berry Amendment: The manufacturer and all components must be
100% domestic under 10 U.S.C. § 4862 and R-DFARS Subpart
225.70.
• Disclosure: The partner must be declared in Attachment 2 and traced in the signed Attachment 3 Certificate of Conformance.
8. Are there specific domestic manufacturing and material sourcing certifications required under the Berry Amendment?
Please complete attachment Atch 3_Berry CoC Template.
9. Can you confirm the required quantities, shirt specifications, sizes, printing requirements, and delivery schedule?
Please refer to the Schedule of Supplies/Services (CLINs) and
Performance Work Statement (PWS) Sections 1, 2, and 4, along with
USAFA Purchase Description PD 174 (Attachment 1), where the required quantities, specifications, sizing, printing, and delivery schedules are explicitly detailed.
10. Are there any additional vendor qualifications or documentation requirements we should be aware of before submitting our quotation?
All mandatory vendor qualifications, compliance certifications, and document submission requirements are fully and exclusively outlined within Section 3 (Instructions to Quoters) and Section 4 (Evaluation
Factors) of the solicitation.
11. Section 5.1 notes that Federal Prison Industries may quote. Will the current FPI contract for these T-shirts (FA700025D0009) end before orders under this contract begin?
FA700025D0009 has already expired.
12. Section 2.4 asks for the First Article within 30 days after the first order. For
Berry-compliant fabric knit to order, would 45 days be acceptable?
The Government can accept a 45-day ARO (After Receipt of Order) delivery timeline for the First Article Sample. However, the final delivery of the entire production requirement must be received no later than May
31, 2027. This absolute deadline compresses the standard 120-day ARO production window. Please confirm if your production line can accommodate this accelerated delivery schedule or propose a phased delivery plan to meet our end-of-May constraint.
13. First Article quantity. PD 174 §3 calls for three first-article shirts (one of each type, size Large). CLIN 0003 and clause 52.209-4 call for one Type II, size Large.
Please confirm that one Type II Large sample satisfies the requirement.
One Type II Large sample satisfies the requirement.
14. Unit pack size. Attachment 3, Tier 9 refers to a "13-pack". The synopsis (§2.3) and Attachment 2 specify packs of 6 or 12 per cadet. Please confirm 6/12.
Packs of 6 or 12 per cadet.
15. CoC validity date. Attachment 3, item 11 states 30 September 2032. Synopsis
§2.1(4) states 30 September 2031. Please confirm the intended date.
16. Yarn. PD 174 Table I states "75/1/72 Semi Pull Texturized Polyester".
Attachment 3 states "semi-dull texturized". Please confirm semi-dull.
Yes, semi-dull is the correct industry specification, though the PD contains a minor typo. Please refer to USAFA PD 174, Table I (page 4) of the purchase description, which lists the Yarn Denier/Ply/Filaments requirement as "75/1/72 Semi Pull Texturized Polyester." The phrase
"Semi Pull" is a typographical error in the purchase description for "Semi-
Dull".
17. Size distribution. Can the Government provide the historical or expected size breakdown (XS–XXXL) and the Type II versus Type III split for pricing and pre-staging?
The Government provides the following historical sizing breakdown based on last year's cadet class order (Class of 2030, FY26 Delivery Order) for informational, non-binding planning purposes:
Important Sizing and Ordering Notes:
1. Informational & Non-Binding Only: The table above represents historical data from a single prior ordering period. It is provided solely to assist offerors with pre-staging planning and production curve modeling. The Government does not guarantee that future delivery orders will match these exact sizing percentages or quantities.
2. Operational Variations & Class Sizing: Actual quantities ordered on individual delivery orders will vary based on annual incoming cadet class sizes (currently estimated at approximately 1,250 cadets) and pending USAFA Leadership kit configuration decisions
(Configuration A: 12 personalized shirts vs. Configuration B: 6 personalized / 6 blank shirts).
3. Type II vs. Type III Allocation: Historically, international cadets requiring Type III t-shirts (country of origin printed beneath the acronym USAFA) represent approximately 1% to 2% of the incoming cadet class (~12 to 25 cadets). The vast majority (98% to 99%) of personalized garments ordered under CLIN X001 are standard Type II shirts (cadet surname printed above USAFA).
18. Bar codes. PD 174 §8 requires a Code 39 ticket with the Cadet Issue Section stock number. Please provide the stock numbers by size and type, and a sample ticket (a bar code sample was attached to FA700025Q0014).
Bar codes are not required.
19. Past performance for a nonmanufacturer. Where the quoter is a nonmanufacturer furnishing the end item of a domestic small-business manufacturer named in
Attachment 2, will the Government consider that manufacturer's recent, relevant past performance (and PPQs from the manufacturer's customers) in the Phase 3 evaluation?
Size Commercial
Nomenclature Historical
Class Ratio
Prior Order Qty
(Personalized - 6/kit)
Prior Order Qty
(Blanks - 7/kit)
Total Units
(Historical)
XS Extra Small 4.0% 300 EA 350 EA 650 EA
S Small 21.6% 1,620 EA 1,890 EA 3,510 EA
M Medium 40.8% 3,060 EA 3,570 EA 6,630 EA
L Large 24.8% 1,860 EA 2,170 EA 4,030 EA
XL X-Large 6.4% 480 EA 560 EA 1,040 EA
XXL XX-Large 2.4% 180 EA 210 EA 390 EA
TOTALS:
(Historical Class
Baseline)
100.0% 7,500 EA 8,750 EA 16,250 EA
Please refer to question/answer 7.
20. NIST SP 800-171 / SPRS. Given that rosters are CUI and DFARS 252.204-7012 and 252.240-7997 (Dev) are incorporated, is a current NIST SP 800-171 assessment score in SPRS required for award? Does the requirement apply to the prime only, or also to the decorator that receives rosters?
Please refer to DFARS 252.204-7012, 252.204-7019, and 252.204-7020
(incorporated in Attachment 5) along with PWS Section 2.2 (page 13), which require a current NIST SP 800-171 assessment score in SPRS prior to award and mandate that flowdown and safeguarding requirements apply to any covered contractor or subcontractor information system that processes, stores, or transmits CUI cadet rosters.
21. Delivery addresses. The WAWF "Ship To Code" is blank. Please confirm the delivery address for bulk and personalized shipments, and whether the First
Article goes to 10 LRS/LGRC, 2351 Sijan Drive, Mitchell Hall Annex, as stated in 52.209-4(a).
First Article Sample goes to 10 LRS/LGRC, 2351 Sijan Drive, Mitchell
Hall Annex, as stated in 52.209-4(a). Please see amended Atch 5 for revised WAWF instructions.
22. Pre-staging versus First Article. 52.209-4(h) places pre-approval production at contractor risk, while §2.2(1) requires staging 100% of blank inventory within the
150-day window. Will the Government consider sequencing the initial Delivery
Order so that First Article approval occurs before the bulk build begins?
First Article sample is due within 30 calendar days ARO of the initial
Delivery Order with a 14-calendar-day Government review window
(concluding by day 44 ARO), which naturally occurs early in the 120-day
ARO window mandated for pre-manufacturing and staging the 100% blank inventory. While this timeline alignment minimizes the overlap and risk of commencing bulk production before First Article approval, any manufacturing performed by the contractor prior to receiving that formal approval remains at contractor risk in accordance with FAR 52.209-4(h).
23. Can a physical sample of the current PT T-shirt be provided to offerors? A detailed tech pack would also work: fabric weight and content, construction, print or heat transfer specs, and size grade.
No, physical samples will not be provided. Please follow the specifications outlined in Atch 1_PD 174-240814-T-shirt USAFA dated 14 August 2024.
24. Are we to fill out the 6 attachments via sam.gov and send it back to you?
Please refer to Section 1 (page 1), Section 3.1.a (page 15), Section 3.2
(pages 16-17), and Section 5.2 (page 23) of the solicitation, which outline that quotes and required attachments (such as Attachments 2 and 3) must be submitted directly via email to the designated Points of Contact (POCs) rather than uploaded to SAM.gov, while other attachments (like
Attachment 4) are sent directly by your references.
25. Can you share who holds the current contract, and the actual quantities ordered by size for the last one or two years?
The prior contract number is FA700025D0009 awarded to Federal Prison
Industries on January 28, 2025, under solicitation FA700025Q0014.
Please refer to question/answer 17 for historical sizing example.
26. Will the Government accept delivery of the pre-staged inventory in two increments (for example, about 60 percent by April and the balance by May), as long as every roster batch is still delivered within 21 days?
The Government clarifies that pre-staged inventory for CLIN X001
(Personalized T-Shirts) must be maintained at the contractor's facility, not delivered to USAFA. The Government does not possess on-site printing capabilities to personalize blank garments. For CLIN X001, garments must remain at the contractor's plant, be screen-printed as Admissions roster batches arrive, and be delivered within twenty-one (21) calendar days after receipt of each batch.
For CLIN X002 (Blank T-Shirts) only, the Government will accept incremental deliveries (e.g., approximately 60% in April and the balance in May), provided 100% of the ordered quantity arrives no later than the contractual May deadline and delivery is coordinated in advance with the receiving dock (10 LRS/LGRCU, DoDAAC F4BR31).
27. For CLIN X001, can the pre-staged shirts be invoiced when they are delivered to
USAFA as stock, or only after personalization is complete?
The items can be invoiced after delivery and inspection/acceptance. See question/answer 26 for further clarification.
28. For a small business without prior federal contracts, will commercial references be accepted in Volume III, and will a Neutral past performance rating be treated as neither favorable nor unfavorable?
According to TABLE 4.2.2: PAST PERFORMANCE RATINGS on page
21, a neutral past performance rating is treated as neither favorable nor unfavorable. Additionally, commercial references will be accepted in
Volume III.
29. Under FAR 52.219-33, may an eligible small-business prime supply the shirts through a qualified domestic small-business manufacturer without manufacturing the garments itself?
Please refer to Section 5.1.2 (page 23) of the solicitation, which addresses
Nonmanufacturer Rule (NMR) Compliance and specifies that nonmanufacturing suppliers or distributors quoting on this 100% Small
Business Set-Aside must supply the end item of a domestic small-business manufacturer/producer and declare their domestic manufacturing mill partner in Attachment 2.
30. Must the proposed manufacturer’s legal name and manufacturing location be identified in the initial technical quotation?
Yes, the proposed manufacturer’s legal name and manufacturing location must be identified in the initial technical quotation.
31. What evidence of nonmanufacturer-rule compliance is required with the quotation?
The quotation must include a completed Nonmanufacturer Rule (NMR)
Compliance Declaration found in Atch 2 – Price Schedule Template.
32. Are there any additional solicitation-specific restrictions on this prime/manufacturer arrangement?
Please refer to Section 2.1.2 and Section 2.1.4 (page 12), as well as
Section 2.3, Addendum Clause III(1)(ii)-(iii) (page 14), which outline strict solicitation-specific parameters, including mandatory 100% domestic sourcing (Berry Amendment) across all tiers, a strict prohibition on substituting any supply chain facilities (mills, dyehouses, decorators, or cut-and-sew) without 30 days advance written CO approval, and the requirement that all Contractor Furnished Material (CFM) must originate from the same dye lot of fabric for each individual delivery order.
33. May the prime rely on the proposed manufacturing subcontractor’s relevant manufacturing past performance and technical experience? If so, may that manufacturer’s Government or commercial customers complete Attachment 4 and submit it directly to the Government?
Yes to both questions:
Reliance on Manufacturing Partner: The prime contractor may cite and rely upon the relevant manufacturing technical experience and past performance of its proposed domestic small business manufacturing partner, provided that the partner is explicitly identified in Attachment 2 and mapped in the Attachment 3 Berry Amendment Certificate of
Conformance. The prime contractor must also submit references demonstrating its own past performance in prime contract management, distribution logistics, and customer administration.
Direct Submission of Attachment 4: The proposed manufacturer’s
Government or commercial references/clients are authorized and encouraged to complete Attachment 4 (Past Performance Client
Questionnaire) on behalf of the manufacturer and submit it directly via email to the Contract Specialist (marissa.morris.4@us.af.mil) and
Contracting Officer (danielle.hyde@us.af.mil) prior to the quotation closing date.
34. If the prime has no relevant apparel history but its committed manufacturer does, how will the Government assess the prime’s past performance?
The Government will assess past performance in accordance with the roles assigned to each entity:
Prime Contractor Evaluation: The prime contractor is not required to have specific apparel manufacturing past performance, but should submit references demonstrating its experience in general prime contract administration, commercial supply distribution, customer service, order fulfillment, and subcontractor management. If the prime contractor has no relevant record of past performance, the prime contractor’s individual past performance record will be evaluated as Neutral (neither favorably nor unfavorably).
Manufacturer Evaluation: The committed domestic small business manufacturer’s past performance will be evaluated directly on its record of cut-and-sew apparel production, technical specification adherence, screen printing/decoration quality, and delivery schedule execution.
Composite Best-Value Rating: In accordance with 13 CFR § 125.2(g) and the solicitation’s evaluation criteria, the Government will consider the past performance of both entities relative to the scope of work each will perform under the contract, resulting in an overall past performance confidence assessment for the quoter.
35. Is a manufacturer commitment letter or teaming agreement required?
No, a manufacturer commitment letter or teaming agreement is not required.
36. Is any minimum number of references mandatory, or may fewer than three be submitted?
No, there is no mandatory minimum number of references. If no recent or relevant past performance is available, the quoter will be assigned as neutral, which is treated as neither favorable nor unfavorable.
37. May the prime sign Attachment 3 based on verified supply-chain records from its proposed manufacturer?
Please refer to Section 2.1.2 and Section 2.1.3 (page 12) along with
Section 3.2, Volume II, Subfactor 1 (page 17), which establish that the prime contractor (quoter) is responsible for executing and submitting the signed Attachment 3 Certificate of Conformance (CoC) to verify 100% domestic textile provenance and certify compliance based on their internal quality assurance systems and supply chain records.
38. Must all nine tiers be documented at quotation submission, or may supporting records be provided later?
Please refer to Section 2.1.3 (page 12) and Section 3.2, Volume II, Subfactor 1 (page 17), which clarify that while offerors must submit a signed Attachment 3 Certificate of Conformance (CoC) and a compliance narrative with their initial quote, they are not required to submit third-party laboratory test reports or full supporting records at submission;
however, the Government reserves the right to require physical proof of conformance or accredited laboratory test data prior to first delivery or during contract performance.
39. Which supporting mill, supplier, facility, or traceability documents must accompany the initial quotation?
No mill, supplier, facility, or traceability documents are required to accompany the initial quotation beyond the completion of Atch 2 – Price
Schedule Template and Atch 3_Berry CoC Template.
40. Please confirm the required approval process if an identified domestic supplier or manufacturing facility changes.
Please refer to Section 2.1.4 (page 12) and Section 2.3, Addendum Clause
III(1)(iii) (page 14), which state that any substitutions of a yarn mill, knitting mill, dyehouse, decorator, or cut-and-sew facility require providing at least 30 calendar days advance written notice to the
Contracting Officer and obtaining their written approval.
41. Attachment 1 appears to call for three garments (Types I, II, III), while the main solicitation identifies one Type II garment under the First Article CLIN. Which controls?
The solicitation is referring to one large Type II garment. This first article sample must be approved before bulk production of the Type I, II, and III garments begin.
42. Can a waiver be supported by the manufacturing subcontractor’s previous qualifying production?
Please refer to Section 2.4.4 (page 15) and Section 3.2, Volume II, Subfactor 2 (page 17) of the solicitation, which describe the Contracting
Officer's waiver authority for quoters who demonstrate successful manufacturing and delivery of identical or substantially similar garments to USAFA or the Department of Defense within the past three (3) years."
43. May bulk manufacturing start before written First Article approval?
The contractor may begin bulk manufacturing before written First Article approval, but all such activity is at the contractor’s sole risk. Before First
Article approval, associated costs are not allocable to the contract for progress payments or termination settlements if the contract is terminated for convenience.
44. Is the Government review period additional to the production/delivery periods?
Yes, the Government's review period is additional. Please refer to Section
2.4.3 (page 15) and Section 2.2 (page 13) of the solicitation: the
Government's 14-calendar-day First Article review window runs independently and is not subtracted from the standard production and delivery timelines (such as the 120-day bulk blank delivery or the 21-day personalized batch schedules).
45. Are physical color standards or approved garment samples available?
No, physical color standards or approved garment samples are not available. Please follow the specifications outlined in Atch 1_PD 174-
240814-T-shirt USAFA dated 14 August 2024.
46. Are laboratory reports required with the quote, or only during production/inspection?
Please refer to Section 2.1.3 (page 12) of the solicitation, which explicitly states that quoters are not required to submit third-party independent textile laboratory test reports with their initial quote submission, though the Government reserves the unilateral right to require this data prior to first delivery or during contract performance.
47. Are personalized and blank-shirt estimated quantities independent or alternative mixes?
They are alternative, dependent mixes that offset each other. If the
Government orders blank shirts (CLIN X002, estimated at 7,500 EA) prior to In-Processing, the quantity of personalized shirts ordered under CLIN
X001 is reduced accordingly to 7,500 EA. If full personalization is chosen instead, roughly 15,000 personalized shirts will be ordered under CLIN
X001.
48. Will both full estimates be used for price evaluation despite potential order-mix changes?
Yes, the full estimates of CLIN X001, X002, and 0003 will be used for price evaluation despite potential order-mix changes.
49. What guaranteed minimum purchase quantity or value applies?
No guaranteed minimum purchase quantity or value applies. All quantities provided in the solicitation are estimates for evaluation and planning.
50. Will all garment CLINs be awarded together, or could individual CLINs be awarded separately?
In accordance with Provision 52.212-1(h) (as tailored in Section 3.1.d of the solicitation), the Government intends to make a single contract award to one responsible contractor on an "all or none" basis. Multiple awards across multiple contractors will not be contemplated; individual CLINs will not be split or awarded to separate offerors.
However, the Government reserves the unilateral right to award some, none, or all CLINs on that single resultant contract based on final USAFA
Leadership determinations regarding cadet kit composition and funding availability. Quoters must submit binding unit prices for all CLINs across all ordering periods in Attachment 2 to be eligible for evaluation and award.
51. Must First Article expenses be priced exclusively in the First Article CLIN?
The contractor is responsible for providing and determining how to allocate costs within the firm-fixed price for CLIN 0003, the First Article sample.
52. Must each option-period unit price remain fixed throughout that period?
Yes, each option-period unit price must remain fixed throughout that period.
53. Does the 150-day clock start at contract award, delivery order receipt, or another authorization?
The revised 120-day clock starts once the contractor receives the delivery order receipt.
54. Does the 21-day personalization clock begin with receipt of each complete roster?
The 21-day personalization clock begins with receipt of each roster containing 25 or more names.
55. How do consolidation of fewer than 25 names and the 30-day limit operate?
Roster batches with fewer than 25 names may be combined with subsequent roster transmissions, as long as the consolidated batch is delivered within 30 calendar days (of the initial transmission) and no later than the final cutoff.
56. How will late-roster expedited delivery requirements be established and priced?
Rosters received within 14 calendar days of I-Day must be delivered by expedited carrier or during the first week of Basic Cadet Training as coordinated with the Contracting Officer. There is no reimbursable charge for expedited delivery, and quoted prices must be firm-fixed, including
FOB Destination. This is usually a very small amount of names (5 or less).
57. Is a minimum blank-shirt inventory required throughout each period?
No, there is no minimum blank-shirt inventory required.
58. Is delivery to one USAFA receiving location or multiple installation locations?
Delivery is to one USAFA receiving location.
59. May an approved manufacturing subcontractor access only the cadet names needed for personalization?
While the text prohibits disclosing rosters to any "third party," a formally declared and approved domestic manufacturing or decorating subcontractor (listed in Attachment 2 and Attachment 3) is considered part of the authorized contract team and may access the cadet names strictly as needed for garment personalization, provided that DFARS 252.204-7012
(Attachment 5) is flowed down and their information systems fully comply with NIST SP 800-171 cybersecurity controls.
60. What approved encryption, transmission, access, and destruction procedures apply to that subcontractor?
The subcontractor may receive and process the cadet name rosters strictly as needed to print and package the personalized garments, provided that
DFARS 252.204-7012 (Attachment 5) is flowed down and their information systems fully comply with NIST SP 800-171 cybersecurity controls.
61. Is prior written approval required before roster information is shared with the manufacturer?
Yes; under Section 2.1.2 and Section 2.1.4 (page 12) and Section 2.2
(page 13), prior written approval is required, which is established by obtaining the Contracting Officer's formal acceptance of the prime contractor's declared supply chain team—specifically the decorator/manufacturer listed in the submitted Attachment 2 and
Attachment 3—prior to contract award, or by obtaining a formal
Contracting Officer approval at least 30 calendar days in advance of any post-award subcontractor substitution.
62. The main solicitation indicates final option expiration September 30, 2031, while
Attachment 3 appears to reference September 30, 2032. Please confirm the controlling expiration date.
63. Please confirm the five pricing periods correspond to the base and four options.
The five pricing periods correspond to the base and four options.
64. Does the 15-page technical narrative limit exclude required signed Government forms?
The 15-page technical narrative limit applies to Volume II, Technical
Capability and does not exclude required signed Government forms. Atch
3_Berry CoC Template is the only attachment required to be submitted as part of Volume II, so quoters must include it within the 15-page limit.
65. May manufacturer commitments and material certifications be submitted as appendices outside that limit?
No, any manufacturer commitments and material certifications submitted as appendices must be included within the 15-page limit.
66. May production, quality, and delivery plans be incorporated into one technical narrative?
Yes, they may be combined into one continuous narrative, provided all subfactors are clearly addressed.
67. Is the pricing workbook required both in original XLSX and separately signed
PDF format, and are additional price certifications required?
Yes, the pricing workbook is required in both original XLSX and a separately signed PDF format. The required price certifications are included in Atch 2 – Price Schedule, Part D – Quoter Representations, Commitments, and Binding Certification. No addition certifications are required.
68. Will official responses be published through a SAM.gov amendment or another solicitation update?
Official responses will be published through a SAM.gov amendment.
69. Must the printing inks and the reflective materials be Berry Amendment compliant (100% U.S. origin)?
Yes, the printing inks and the reflective materials be Berry Amendment compliant. All raw materials, component parts, and manufacturing operations must originate within the United States.
70. Section 2.4 and CLIN 0003 specify one Size Large, Type II personalized first article within 30 calendar days after receipt of the initial delivery order. Section 3 of Attachment 1 requires three Size Large shirts, one of each type, before production begins. Please confirm the required quantity and types, and whether inventory production or staging may begin before written first article approval.
One Type II Large sample delivered within 30 days after receipt of contract award is required. The contractor may begin inventory production or staging before written first article approval, but all such activity is at the contractor’s sole risk.
71. May a nonmanufacturer submit recent, relevant apparel manufacturing references and Past Performance Questionnaires for its proposed manufacturer under
Volume III? If so, how should those references be identified, and will they be considered in the past performance evaluation?
past performance as a prime contractor (e.g., contract administration, supply chain logistics, customer service, and distribution management) in specific responsibilities. The Government will evaluate both entities'
72. Section 2.2 prohibits disclosure of cadet rosters to any third party. May the proposed manufacturer or personalization subcontractor receive and process roster information solely for contract performance? Please identify any required authorization, contractual provisions, or security requirements for that arrangement.
Yes; an approved subcontractor or decorator declared in Attachment 3 is authorized to receive and process rosters solely for contract performance, provided DFARS 252.204-7012 (referenced in Attachment 5, page 23) is formally flowed down to them, requiring both the prime and subcontractor information systems to fully comply with NIST SP 800-171 security controls, maintain active SPRS assessment scores per DFARS 252.204-
7019/7020, transmit rosters exclusively via encrypted DoD methods (e.g., DoD SAFE), and securely purge all roster files within 30 days of final contract delivery as mandated by Section 2.2 (page 13).
73. Several provisions require delivery within 21 calendar days after receipt of the final cadet name batch, while Section 2.2, paragraph 5, measures the deadline from manufacture and shipment of that batch. Please confirm which event starts the 21-day delivery period.
The 21-day delivery period for the personalized cadet shirts under CLIN
0001 begins immediately after receipt of the cadet name roster/batch from the Government, whereas the 21-day delivery clock for unassigned leftover/replenishment stock under Section 2.2, Paragraph 5 is triggered only after the final Admissions batch of personalized shirts has been manufactured and shipped by the contractor.
74. If the garment is knit and sewn by one small business and decorated (print and reflective transfers) by another, which firm is treated as the manufacturer for the
Nonmanufacturer Rule and Attachment 2?
In accordance with the Small Business Administration regulations at 13
CFR § 121.406(b)(2), the manufacturer of an end item is the concern that, with its own facilities, performs the primary activities in transforming raw materials into the finished end item being acquired under the designated
NAICS code.
For acquisitions classified under NAICS 315250 (Cut and Sew Apparel
Manufacturing):
1. Primary Manufacturer under NMR (Attachment 2): The cut-and-sew facility (the domestic firm that cuts the fabric and sews the physical t-shirts) is treated as the manufacturer of the end item for purposes of the Nonmanufacturer Rule. The cut-and-sew firm must qualify as an
American small business concern and must be identified in the
Attachment 2 Quoter Information Header under the Nonmanufacturer
Rule declaration.
2. Decorator Classification: The firm applying the plastisol screen print and retroreflective heat transfers is considered a specialty subcontractor/finisher. The decorator must also qualify as a small business concern.
3. Complete Supply Chain Traceability (Attachment 3): Both the cut-and-sew manufacturing mill and the decorating facility (as well as the yarn and knitting mills) must be fully identified by company name, address, and CAGE code in the Attachment 3 Berry Amendment
Certificate of Conformance. Both entities must be 100% domestic in origin.
75. May a small-business offeror use a U.S. manufacturer as its supplier or subcontractor, provided the offeror remains responsible for full Berry Amendment compliance?
Yes, a small-business offeror may use a U.S. manufacturer as its supplier or contractor, provided the offeror remains responsible for full Berry
Amendment compliance and is also a small business.
76. Must the manufacturer or subcontractor be identified in the quote, and what documentation is required from them with the quote?
Yes, the manufacturer or subcontractor must be identified within the quote in both Atch 2 – Price Schedule Template and Atch 3_Berry CoC
Template.
77. Does the Berry certificate need to cover every textile component—including yarn, fabric, thread, trim, reflective transfers, and printing—or are any components treated differently under this solicitation?
The Berry certificate must cover every textile component and manufacturing operation identified in Atch 3_Berry CoC Template Part
III: Domestic Supply Chan Traceability Declaration. No components are treated differently under this solicitation.
78. Are the required first-article samples due with the quote, or only after award?
The required first-article physical sample is due within 30 calendar days
After Receipt of Order (ARO) / contract award, not with the initial quote submission.
79. The solicitation calls for one Type II Large first article, but PD 174 calls for three
Large shirts, one of each type. Which applies, and how should the samples be priced?
One Type II Large sample applies. The contractor is responsible for providing and determining how to allocate costs within the firm-fixed price for CLIN 0003, the First Article sample.
80. The first-article waiver provisions refer to prior work for USAFA or the
Department of Defense in one section, but USAFA only in another. Which standard applies?
The Government clarifies that the First Article Testing (FAT) waiver under Section 2.4 and Volume II, Subfactor 2, is strictly restricted to contractors or proposed manufacturing partners that have successfully manufactured and delivered the exact USAFA Physical Conditioning
Uniform T-Shirt in strict accordance with USAFA Purchase Description
PD 174-240814-T-Shirt USAFA (or its direct predecessor revisions) directly for the United States Air Force Academy (USAFA) within the past three (3) years.
Prior production of generic athletic apparel, physical training shirts for other Department of Defense (DoD) military service branches, or commercial performance t-shirts will not be considered for a First Article waiver. Because USAFA PD 174 contains unique, highly specific salient characteristics—including specialized ANSI/ISEA 107 Level 2 retroreflective sleeve striping, exact AF Academy back reflective logo placement and dimensions, custom PMS 5395 C plastisol dark blue lettering, and strict dimensional tolerances—physical verification via
CLIN 0003 is required for any quoter or manufacturer lacking recent, documented performance producing the exact USAFA garment.
81. What is the anticipated award date, and how would a later award affect the May delivery requirement and 150-day lead time?
The anticipated award date is on or before 11 December 2026. The ARO has been amended to 120 days to meet delivery deadlines. See amended combined synopsis/solicitation and attachments.
82. Cadet rosters and the manufacturer. Section 2.2 states the contractor shall not disclose rosters to any third party. May a nonmanufacturer contractor provide rosters to its declared small business manufacturer/decorator, which needs the names to print the personalized shirts? If so, must both the contractor and the manufacturer meet DFARS 252.204-7012 (NIST SP 800-171)?
Because the rosters contain Controlled Unclassified Information (CUI), DFARS 252.204-7012 mandates a complete flowdown of security requirements. Therefore, both the prime contractor and the manufacturer/decorator's information systems must fully comply with
DFARS 252.204-7012 (NIST SP 800-171) to store, process, or receive the rosters.
83. Under 252.240-7997 (Deviation 2026-O0025), must the quoter have a current
NIST SP 800-171 assessment posted in SPRS at the time of quote submission, or before award?
The evaluation criteria and incorporated DFARS cybersecurity provisions dictate that the NIST SP 800-171 assessment score must be active in the
Supplier Performance Risk System (SPRS) prior to award rather than at the exact time of quote submission. However, because the score is verified during the evaluation phases, it is highly recommended to have it posted as early as possible.
84. For Volume III, will the Government consider contract references and PPQs for the quoter's declared manufacturer, or only for the quoter itself?
past performance as a prime contractor (e.g., contract administration, supply chain logistics, customer service, and distribution management) in specific responsibilities. The Government will evaluate both entities'
85. Can the Government share the prior contract number or historical order quantities for this item?
The prior contract number is FA700025D0009 (awarded on January 28, 2025, under solicitation FA700025Q0014), which had an estimated annual order quantity of 15,600 t-shirts.
86. May an eligible small business quoter fulfill the requirements of this solicitation by partnering with an established domestic U.S. manufacturing subcontractor, provided that the subcontractor and all tiers of the supply chain strictly conform to the 100% domestic sourcing requirements of the Berry Amendment?
Under the statutory domestic sourcing mandates of the Berry Amendment outlined in Section 2.1.2 (page 12), outsourcing production to any foreign manufacturer is strictly prohibited; however, fulfilling the requirements through a qualified domestic U.S. manufacturer is fully acceptable under the Nonmanufacturer Rule Section 5.1.2 (page 23), provided the prime contractor declares their domestic small business manufacturing partner in
Attachment 2 and submits the signed Attachment 3 Certificate of
Conformance verifying 100% domestic provenance across all supply chain tiers.
87. Attachment 2 and the manufacturing partner. Section 5.1 requires a nonmanufacturer to name its domestic small business manufacturer and "mill partner" in Attachment 2. If a separate domestic decorator applies the plastisol personalization, is the cut-and-sew facility the manufacturer to be named in
Attachment 2?
Yes, the cut-and-sew facility is the primary manufacturer to be declared in
Attachment 2.
88. Cadet rosters. May the rosters be sent through DoD SAFE directly to the decorator named in the approved Berry Certificate of Compliance (Attachment
3)? Is that decorator excluded from the restriction on disclosure to "any third party"?
Yes; while PWS Section 2.2 (page 13) restricts disclosure of cadet rosters to "any third party," a domestic subcontractor or decorator formally approved and named in Attachment 3 is considered an authorized part of the contract team rather than an external third party. The rosters may be transmitted directly to them via DoD SAFE for printing and packaging purposes, provided that DFARS 252.204-7012 (Attachment 5) is formally flowed down and the decorator's information systems fully comply with
NIST SP 800-171 security controls to store and process the CUI data.
89. Cybersecurity clauses. Attachment 5 incorporates DFARS 252.204-7012, the provision at 252.204-7008, and 252.240-7997 (Deviation 2026-O0025), together with 252.240-7992. If the cadet rosters are transmitted through DoD SAFE directly to the decorator identified in the approved Attachment 3, and the prime contractor's own information systems never store, process or transmit the rosters, will the Government treat the prime's systems as outside the scope of "covered contractor information system" for this contract, with 252.204-7012 and 252.240-
7992 flowed down to that decorator? Is any CMMC level required at award?
While no specific CMMC certification level is explicitly mandated for award in the solicitation text, standard flowdown rules dictate that any subcontractor information system processing or storing CUI cadet rosters must comply with DFARS 252.204-7012 (NIST SP 800-171) as referenced in Attachment 5 (page 23); if the prime contractor's systems never receive, store, or process these rosters, those specific systems would technically remain out of scope of "covered contractor information systems," though the prime remains contractually responsible for ensuring subcontractor compliance and proper clause flowdown.
90. Certificate validity. Attachment 3, Part I.5 states that the certificate is valid through September 30, 2031, and Part IV.11 states September 30, 2032. Which date applies?
September 30, 2031.
91. Roster purge. The solicitation requires destruction of roster files within thirty (30) days following final contract delivery. Is that the correct purge point, or is it thirty days after the delivery of each roster's order?
It is thirty (30) days following final contract delivery.
92. First Article quantity: Section 1.1 (CLIN 0003) and Section 2.4 call for one (1)
First Article sample (Type II, size Large), while PD 174 Section 3 calls for three t-shirts, one of each type, size large. Which quantity applies?
One Type II Large sample applies.
93. Unit pack size: Section 2.3(2)(iii) states unit packs of 6 or 12 shirts per cadet, while Attachment 3, Tier 9, refers to "cadet kit packing (13-pack)". Which pack size applies?
Packs of 6 or 12 per cadet.
94. Past performance of a manufacturing partner: For a quoter applying the nonmanufacturer rule, will the Government consider past performance references from the quoter's named domestic manufacturer under Volume III?
past performance as a prime contractor (e.g., contract administration, supply chain logistics, customer service, and distribution management) in specific responsibilities. The Government will evaluate both entities'
95. Anticipated award and ordering dates: Clause 52.216-18 (Attachment 5, page 11) leaves the ordering period dates blank, and Section 2.2 (page 13) ties pre-staging to a 150-day window after receipt of order. What is the anticipated award date and the anticipated date of the first delivery order?
The anticipated award date is on or before 10 December 2026. The ARO has been amended to 120 days to meet delivery deadlines. See amended combined synopsis/solicitation and attachments.
96. Past Performance Questionnaire address: Attachment 4 lists danielle.hyde@us.af.mil, while the solicitation lists danielle.hyde.2@us.af.mil.
Which address should references use to return the Past Performance
Questionnaire?
danielle.hyde.2@us.af.mil
97. Can we submit CPARS in lieu of PPQ?
No, you must still facilitate the submission of the PPQs. Please refer to
Section 3.2, Volume III (page 17) and Section 4.2, Phase 3 (page 19) of the solicitation: while the Government will independently evaluate existing records in system databases such as CPARS and SPRS, the submittal instructions explicitly mandate that "Quoters shall transmit
Attachment 4 (Past Performance Questionnaire) to their clients for direct email submission to the Government." Consequently, CPARS cannot be submitted by the quoter as a direct substitute for the required client-submitted PPQs.
98. PD 174 Table I lists "Antimicrobial" with no requirement value. Is an antimicrobial finish required? If so, what test method and performance level apply?
Yes. The fabric shall be antimicrobial. The Government requires supplier certification confirming antimicrobial properties and documentation identifying the antimicrobial treatment, infusion, manufacturing process, or technology utilized in production of the fabric. Certification may be provided by the fabric manufacturer, mill, or other responsible supplier.
The contractor shall maintain documentation sufficient to demonstrate compliance with the Purchase Description requirements. The solicitation does not establish a separate Government-defined laboratory test method or performance threshold. Documentation from the fabric supplier demonstrating antimicrobial treatment is acceptable evidence of compliance.
99. PD 174 §6.C requires self-fabric trim in Pantone 19-4024 TCX. Attachment 3, Tier 4 describes trim from the "same dye lot as body" (white). Please confirm the trim is navy 19-4024 TCX in the body fabric construction, and how the dye-lot requirement applies to the trim.
The collar and sleeve trim shall be manufactured from the same fabric construction or an equivalent fabric meeting the weight, performance, and appearance requirements of the body fabric. The trim color shall match
Pantone 19-4024 TCX, or a Government-acceptable equivalent color match. The Government does not require the trim fabric to originate from the same dye lot as the shirt body fabric. Contractors may utilize alternate dye lots or suppliers provided the trim demonstrates equivalent fabric construction, performance characteristics, durability, and acceptable color matching.
100. How many cycles for AATCC 135 Dimensional Stability (Shrinkage)?
Compliance with the referenced AATCC standard, as certified by the fabric supplier or testing laboratory, is acceptable. No additional USAFA-specific laundering-cycle requirement is imposed. Offerors should source fabric supported by supplier certifications and test documentation demonstrating conformity with the cited industry standard.
101. How many cycles for AATCC 61 Colorfastness to Accelerated
Laundering?
fabric supplier or testing laboratory, is acceptable. The Government does not prescribe additional testing procedures, cycle counts, or laboratory methodologies beyond compliance with the referenced standard. Supplier certification and supporting laboratory documentation may be used to demonstrate compliance.
102. The Testing lists “Antimicrobial” as the last test in Table I, but it does not list a test method or a performance requirement. What test and what are the requirements for pass/fail?
The Government requires supplier certification confirming that the fabric is antimicrobial and documentation describing the antimicrobial treatment or manufacturing process utilized. The solicitation does not establish a separate Government-defined laboratory test method or performance threshold. Documentation from the fabric supplier demonstrating antimicrobial treatment is acceptable evidence of compliance.
103. For the Type II (cadet surname) and Type III (country of origin) personalization, will the Government accept a heat-applied transfer for the names (for example, a direct-to-film or plastisol transfer in Dark Blue
PMS 5395 C, 1/2 inch block letters, placed per PD 174 Section 5.B and
5.C), instead of direct plastisol screen printing? The front "USAFA" print would remain direct plastisol screen print as specified in PD 174 Section
5.A.a.
Yes. Equivalent decoration methods, including direct-to-film (DTF) and plastisol-transfer applications, are acceptable for Type II and Type III personalization provided they achieve the required appearance, color, durability, legibility, placement, and overall quality of the specified design. The contractor shall demonstrate equivalent performance during first article evaluation. The principal USAFA graphic shall remain as specified in the Purchase Description.
104. If the exact 75/1/72 filament yarn construction in PD 174 Table I is not available from a domestic mill, will the Government accept an equal Berry-compliant 100 percent polyester interlock that meets the Table I performance requirements, supported by lab test data and a certificate of conformance?
Yes. The Government will consider Berry-compliant polyester interlock fabrics that differ from the cited yarn construction when supported by supplier certification, laboratory data, and technical documentation demonstrating compliance with the functional and performance requirements of the Purchase Description. The cited yarn construction is intended to identify the desired performance level and fabric characteristics.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .