| File | Type | Posted |
|---|---|---|
| Questions_1.docx | DOCX document | |
| Questions.docx | DOCX document | |
| FA7000-14-R-0020-0001.pdf | ||
| Site_Visit_Attendance.pdf | ||
| Price_List_-3d_Option_Year.xls | XLS spreadsheet | |
| Price_List-4th_Option_Year.xls | XLS spreadsheet | |
| Price_List-2d_Option_Year.xls | XLS spreadsheet | |
| SOW_Protective_Coating_Maintenance_-_01-14-2015.docx | DOCX document | |
| PAST_PERFORMANCE_QUESTIONNAIRE.doc | DOC document | |
| Davis_Bacon_Wage_Determination_Highway.doc | DOC document | |
| Price_List_-Basic_Year.xls | XLS spreadsheet | |
| Solicitation.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SCHEDULE | |||||
| OPTION YEAR 1 CLIN 1001 | |||||
| The contractor shall furnish all labor, equipment, supplies, supervision and materials, and perform all work in strict accordance with the Statement of Work and technical exhibits for the Protective Coatings Maintenance Contract. | |||||
| ITEM | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C001 | Exterior Protective Coatings | ||||
| C001AA | Preparation and prime (or first) coat below 15-ft height | 250,000 | SF | ___________ | ___________ |
| C001AB | Subsequent coatings below 15 ft height | 150,000 | SF | ___________ | ___________ |
| C001AC | Preparation and prime (or first) coat above15 ft height | 67,500 | SF | ___________ | ___________ |
| C001AD | Subsequent coatings above 15 ft height | 50,000 | SF | ___________ | ___________ |
| C002 | Interior Protective Coatings | ||||
| C002AA | Preparation and prime (or first) coat below 15 ft height | 250,000 | SF | ___________ | ___________ |
| C002AB | Subsequent coats below 15 ft height | 250,000 | SF | ___________ | ___________ |
| C002AC | Preparation and prime (or first) coat above 15 ft height | 150,000 | SF | ___________ | ___________ |
| C002AD | Subsequent coats above 15 ft height | 10,000 | SF | ___________ | ___________ |
| C003 | Gypsum wallboard treatment | 10,000 | SF | ___________ | ___________ |
| C004 | Texturing | 5,000 | SF | ___________ | ___________ |
| C005 | Fire hydrants | 100 | EA | ___________ | ___________ |
| C006 | Stencils and Stencil Markings | ||||
| C006AA | Lettering, (1”- 6”) | 1000 | EA | ___________ | ___________ |
| (Each = letter, number, symbol) | |||||
| C006AB | Lettering (7"-12") | 200 | EA | ___________ | ___________ |
| (Each = letter, number, symbol) | |||||
| C006AC | Lettering (13”-24") | 50 | EA | ___________ | ___________ |
| (Each = letter, number, symbol) | |||||
| C006AD | Lettering (96”-105") | 20 | EA | ___________ | ___________ |
| (Each = letter, number, symbol) | |||||
| C007 | Graphics | 1000 | SF | ___________ | ___________ |
| C008 | Wood refinishing, wood doors, frames and trim | 15,000 | EA | ___________ | ___________ |
| C009 | Epoxy Coatings | ||||
| C009AA | Epoxy coatings for shower rooms | 5,000 | SF | ___________ | ___________ |
| (Waterborne epoxy) | |||||
| C009AB | One part urethane | 3000 | SF | ___________ | ___________ |
| (Pedestrian traffic, shop areas) | |||||
| C009AC | Two part 70 plus solids | 5000 | SF | ___________ | ___________ |
| (Vehicle traffic areas) | |||||
| C009AD | Nonslip grit | 5000 | SF | ___________ | ___________ |
| C009AE | Decorative flakes | 5000 | SF | ___________ | ___________ |
| C009AF | Air Gardens | 30,000 | SF | ___________ | ___________ |
| (Chlorinated rubber) | |||||
| C010 | Water blasting | 1000 | SF | ___________ | ___________ |
| C011 | Sand Blasting | 5000 | SF | ___________ | ___________ |
| C012 | Log oil maintenance | 7500 | SF | ___________ | ___________ |
| (Obstacle Courses) | |||||
| C013 | Painting flag poles | ||||
| C013AA | Flag Poles – 35-50 ft | 6 | EA | ___________ | ___________ |
| (Includes rental of lift) | |||||
| C013AB | Flag Poles - 100 ft | 1 | EA | ___________ | ___________ |
| (Includes rental of lift) | |||||
| C014 | Round trip travel to Farish Memorial | ||||
| Park and Ellicott Auxiliary Airfield. | |||||
| C014AA | Farish Memorial Park | 2 | RT | ___________ | ___________ |
| C014AB | Ellicott Auxiliary Airfield | 1 | RT | ___________ | ___________ |
| C017 | Aerial Lift Rental | ||||
| C017A | 30 - 60 ft. lift | 5 | DY | ___________ | ___________ |
| C017AB | 80 - 125 ft. lift | 1 | DY | ___________ | ___________ |
| C017AC | 19 - 25 ft. scissors lift | 2 | DY | ___________ | ___________ |
| Estimated Total Option Year 1: | ___________ |
Sheet2
| BID SCHEDULE | |||||
| OPTION YEAR 1 CLIN 1002 | |||||
| The contractor shall furnish all labor, equipment, supplies, supervision and materials, and perform all work in strict accordance with the Statement of Work and technical exhibits for the Protective Coatings Maintenance Contract. | |||||
| D018 | Pavements Markings | ||||
| D019 | Reflective pavement markings | 425,303 | LF | ___________ | ___________ |
| (White roads) | |||||
| D020 | Reflective pavement markings | 482,945 | LF | ___________ | ___________ |
| (Yellow roads) | |||||
| D021 | Reflective pavement markings | 5000 | SF | ___________ | ___________ |
| (white stop bars) | |||||
| D022 | Reflective pavement markings | 4224 | SF | ___________ | ___________ |
| (white crosswalks) | |||||
| D023 | Reflective pavement markings | 500 | SF | ___________ | ___________ |
| (White traffic arrows) | |||||
| D024 | Non-reflective pavement markings | 335,000 | LF | ___________ | ___________ |
| (White parking lots) | |||||
| D025 | Non-reflective pavement markings | 200 | EA | ___________ | ___________ |
| (White handicap LOGOS) | |||||
| D026 | Layout | 40 | HRS | ___________ | ___________ |
| D027 | Pavements Markings Removal | ||||
| Scarifying (hand machine) | 500 | LF | ___________ | ___________ | |
| Scarifying (industrial truck) | 1500 | LF | ___________ | ___________ | |
| Estimated Total Option Year 1: | ___________ |