Attachment 3 - B419 (Ops) Juniper Both Floors (18 February 2026).pdf
PDF 1 MB Posted
- Attached to
- CAT 6 Premise Cable installation Federal contract opportunity
- Solicitation number
- FA671226Q0005
About this file
This document consists of architectural floor plans for Building 419, updated as of February 18, 2026. The file includes two detailed plans: a First Floor Plan and a Basement Plan, each showing room layouts with numbered spaces and square footage designations.
The First Floor Plan depicts approximately 20 rooms and spaces, including office areas (Rooms 111-124, 136-176), restrooms (Men's and Women's facilities), a lobby (Room 101), multiple halls, vestibules, stairs, and specialized spaces such as an AS Flight Planning room (Room 111, 758 SF) and an AS CSS/Orderly Room (Room 116, 758 SF). The plan includes a legend identifying network infrastructure requirements: blue circles indicate current CradlePoint AP locations, blue squares show current CradlePoint Switch locations, red circles mark preferred Juniper AP port drop locations, green squares identify preferred Juniper Apple TV port drop locations, and red squares designate correct Juniper Switch install locations. The Basement Plan shows support facilities including mechanical room (433 SF), showers, locker rooms (both men's and women's), elevator machine room, and multiple halls and storage areas. Total basement area is approximately 2,040 SF. Both plans indicate the same infrastructure legend for network and audiovisual equipment placement, suggesting facility modernization or upgrade requirements for communications and IT systems throughout Building 419.
View the file
Other files for this federal contract opportunity
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST FLOOR PLAN BUILDING 419
270 SF
274 SF
143 SF
141 SF
297 SF
HALL
393 SF
463 SF
MEN RR
60 SF
WOMEN RR
60 SF
114 SF
114 SF
114 SF
204 SF106
VEST
36 SF
196 SF
168 SF
153 SF
151 SF
STAIR
140 SF
JAN
40 SF
511 SF
161/133
1,052 SF
HALL
598 SF
238 SF 163/131
1,066 SF
CLO
13 SF 140
243 SF
228 SF
486 SF
HALL
480 SF
WOMEN RR
130 SF
MEN RR
130 SF
JAN
22 SF
203 SF
STAIR
105 SF
145 SF
294 SF
758 AS FLIGHT PLANING
400 SF
HALL
490 SF
VEST
44 SF
LOBBY
164 SF
VEST
48 SF
210 SF
207 SF
758 AS CSS/ ORDERLY
ROOM
288 SF
147 SF
131 SF
398 SF
338 SF
480 SF
STAIR
132 SF
VEST
51 SF
203 SF
Blue Circles: current CradlePoint AP Blue Square: current CradlePoint Switch Red Circles: preferred Juniper AP port drop locations Green Squares: preferred Juniper Apple TV port drop locations Red Square: correct Juniper Switch install location (flip page)
U pd at ed
Fe br ua ry
AutoCAD SHX Text
BLDG. NORTH
1396551515V Oval Current CradlePoint Access Point #1 - Bldg 419
WA1809AA002085
1396551515V Rectangle Current CradlePoint Switch Bldg 419 (911 Operations) CradlePoint Router - WA2030RA008657 Primary IP: 192.168.2.1 Guest IP: 192.168.12.1
1396551515V Oval Current CradlePoint Access Point #2 - Bldg 419
WA1809AA002168
1396551515V Oval Current CradlePoint Access Point #3 - Bldg 419
WA1809AA002103
1396551515V Oval Current CradlePoint Access Point #4 - Bldg 419
WA1809AA002202
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Rectangle 5 meters away from Intel Vault downstairs
1396551515V Text Box OG conference room
1396551515V Rectangle Juniper Apple TV?
1396551515V Rectangle Juniper Apple TV?
1396551515V Rectangle Juniper Apple TV?
1396551515V Rectangle Juniper Apple TV?
1396551515V Rectangle Juniper Apple TV?
1396551515V Rectangle Juniper Apple TV?
1396551515V Rectangle Juniper Apple TV?
1396551515V Oval New Juniper AP location
1396551515V Rectangle Juniper Apple TV?
1396551515V Highlight
STAIR
STAIR
STAIR
STAIR
MECHANICAL ROOM
SHOWERS
WOMENS
TOILET
JC
WOMENS
LOCKER
ROOM
HALL
MENS
TOILET
HALL
BREAK
ROOM
HALL
ELEVATOR
MACHINE ROOM
HALL
ELEV
LOBBY
BUILDING 419
CLOSET
HALL
MENS
TOILET
MENS LOCKER
ROOM
433 SF
SHOWERS
BASEMENT PLAN
85 SF
354 SF192 SF
74 SF
1363 SF
320 SF
135 SF
165 SF
103 SF96 SF
441 SF
460 SF
96 SF
27 SF
2040 SF
70 SF
191 SF
124 SF
130 SF
198 SF
368 SF
256 SF
240 SF
86 SF
514 SF78 SF
127 SF
231 SF
224 SF
286 SF
45 SF
356 SF
242 SF
313 SF
133 SF
23 SF
Blue Circles: current CradlePoint AP Blue Square: current CradlePoint Switch (flip page) Red Circles: preferred Juniper AP port drop locations Green Squares: preferred Juniper Apple TV port drop locations Red Square: correct Juniper Switch install location
U pd at ed
Fe br ua ry y
AutoCAD SHX Text
BLDG. NORTH
1396551515V Oval Current CradlePoint Access Point #6 - Bldg 419
WA1809AA001944
1396551515V Oval Current CradlePoint Access Point #5 - Bldg 419
WA1809AA002100
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Oval New Juniper AP location
1396551515V Rectangle New Juniper Switch will be in Comm Closet
1396551515V Rectangle 5 meters away from Intel Vault
1396551515V Rectangle Juniper Apple TV?
1396551515V Rectangle Juniper Apple TV?
1396551515V Highlight
| Sheets and Views |
| Model |
| B419 Basement (Juniper initial layout from OG).pdf |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .