Attachment 3 - Bldg 419 Proposed Juniper Locations - Initial layout drawing.pdf

PDF 334 KB Posted

Attached to
CAT 6 Premise Cable installation Federal contract opportunity
Solicitation number
FA671226Q0005
Issued by
Department of the Air Force Reserve Command

About this file

These are architectural floor plans for Building 419, showing the first floor and basement levels with detailed room layouts and area measurements. The plans include markings for current and preferred network equipment locations, specifically CradlePoint Access Points (APs) and Juniper Switches. Blue circles and squares indicate current CradlePoint AP and Switch locations, while red circles and squares show preferred and correct Juniper Switch installation locations. The first floor plan includes various rooms such as hallways, offices, vestibules, restrooms, and a conference room, with each space labeled and its square footage noted. The basement plan similarly details mechanical rooms, locker rooms, toilets, shower areas, and circulation spaces, each with precise area measurements.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST FLOOR PLAN BUILDING 419

270 SF

274 SF

143 SF

141 SF

297 SF

HALL

393 SF

463 SF

MEN RR

60 SF

WOMEN RR

60 SF

114 SF

114 SF

114 SF

204 SF106

VEST

36 SF

196 SF

168 SF

153 SF

151 SF

STAIR

140 SF

JAN

40 SF

511 SF

161/133

1,052 SF

HALL

598 SF

238 SF 163/131

1,066 SF

CLO

13 SF 140

243 SF

228 SF

486 SF

HALL

480 SF

WOMEN RR

130 SF

MEN RR

130 SF

JAN

22 SF

203 SF

STAIR

105 SF

145 SF

294 SF

400 SF

HALL

490 SF

VEST

44 SF

LOBBY

164 SF

VEST

48 SF

210 SF

207 SF

758 AS CSS/ ORDERLY

ROOM

288 SF

147 SF

131 SF

398 SF

338 SF

480 SF

STAIR

132 SF

VEST

51 SF

203 SF

Blue Circles: current CradlePoint AP Blue Square: current CradlePoint Switch Red Circles: preferred Juniper AP locations Red Square: correct Juniper Switch install location (flip page)

AutoCAD SHX Text

BLDG. NORTH

1396551515V Oval Current CradlePoint Access Point #1 - Bldg 419

WA1809AA002085

1396551515V Rectangle Current CradlePoint Switch Bldg 419 (911 Operations) CradlePoint Router - WA2030RA008657 Primary IP: 192.168.2.1 Guest IP: 192.168.12.1

1396551515V Oval Current CradlePoint Access Point #2 - Bldg 419

WA1809AA002168

1396551515V Oval Current CradlePoint Access Point #3 - Bldg 419

WA1809AA002103

1396551515V Oval Current CradlePoint Access Point #4 - Bldg 419

WA1809AA002202

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Rectangle 5 meters away from Intel Vault downstairs

1396551515V Text Box OG conference room

STAIR

STAIR

STAIR

STAIR

MECHANICAL ROOM

SHOWERS

WOMENS

TOILET

JC

WOMENS

LOCKER

ROOM

HALL

MENS

TOILET

HALL

HALL

ELEVATOR

MACHINE ROOM

HALL

ELEV

LOBBY

BUILDING 419

CLOSET

HALL

MENS

TOILET

MENS LOCKER

ROOM

433 SF

SHOWERS

BASEMENT PLAN

85 SF

354 SF192 SF

74 SF

1363 SF

320 SF

135 SF

165 SF

103 SF96 SF

441 SF

460 SF

96 SF

27 SF

2040 SF

70 SF

191 SF

124 SF

130 SF

198 SF

368 SF

256 SF

240 SF

86 SF

514 SF78 SF

127 SF

231 SF

224 SF

286 SF

45 SF

356 SF

242 SF

313 SF

133 SF

23 SF

Blue Circles: current CradlePoint AP Blue Square: current CradlePoint Switch (flip page) Red Circles: preferred Juniper AP locations Red Square: correct Juniper Switch install location

AutoCAD SHX Text

BLDG. NORTH

1396551515V Oval Current CradlePoint Access Point #6 - Bldg 419

WA1809AA001944

1396551515V Oval Current CradlePoint Access Point #5 - Bldg 419

WA1809AA002100

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Oval New Juniper AP location

1396551515V Rectangle New Juniper Switch will be in Comm Closet

1396551515V Rectangle 5 meters away from Intel Vault

Sheets and Views
Model
B419 Basement (Juniper initial layout from OG).pdf
Sheets and Views
Model

File details come from the government source that posted it. Updated .