Attachment 28 EB 00202.pdf

PDF 527 KB Posted

Attached to
Fiber Optic Cable Install - Qty 6 Federal contract opportunity
Solicitation number
FA671223Q0014
Issued by
Department of the Air Force Reserve Command

About this file

This document contains an as-built telecommunications system installation plan and related federal contract opportunity. The installation plan provides details for a fiber optic cable installation at the Pittsburgh ARS facility in Pennsylvania. It includes room plans, equipment details, and pre- and post-installation photos. The related solicitation is for the procurement of fiber optic cable installations at six locations under Solicitation Number FA671223Q0014 issued by the Department of the Air Force Reserve Command. The opportunity type is listed as a solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Fiber Optic Cable Install - Qty 6, newest first.
File Type Posted
Attachment 32 Additional Questions and answers.docx DOCX document
Attachment 31 Davis Bacon Act WD PA20230001 Rev 7 Building 07 28 2023.pdf PDF
Attachment 30 Wage Determination 2015-4235 Rev 24 6 30 2023.pdf PDF
Attachment 29 Site Visit Questions and answers.docx DOCX document
Attachment 6 Offer Pricing Template r1.pdf PDF
Attachment 26 SOW FOC from B202 to Marquee.docx DOCX document
Attachment 27 GD11014od01CG (107 HH).pdf PDF
Attachment 25 List of Attachments r1.xlsx XLSX spreadsheet
Attachment 2 SOW FOC from ITB 221 to B317 V5.docx DOCX document
Attachment 4 SOW FOC from ITB 405 to ITB 221 v3.docx DOCX document
Attachment 7 AF1024 Confined Space Entry Permit.pdf PDF
Attachment 17 GD13014od01 (MH14 208 208A 210 HH21 220).pdf PDF
Attachment 20 ITB 00405.pdf PDF
Attachment 22 GD12014od02CG (MH 125).pdf PDF
Attachment 3 SOW FOC from ITB 221 to B419 V2.docx DOCX document
Attachment 6 Offer Pricing Template.pdf PDF
Attachment 11 ITB 00221.pdf PDF
Attachment 25 List of Attachments.xlsx XLSX spreadsheet
Attachment 15 GD13013od01(MH1A 2 4 5 6 HH20).pdf PDF
Attachment 5 SOW FOC from ITB 405 to B120 V5.docx DOCX document
Attachment 8 Silica Control Plan.pdf PDF
Attachment 12 GD13013od02CG (HH304A 306 306A 306B 403 MH301).pdf PDF
Attachment 21 GD12014od01CG (HH2-6 MH 121).pdf PDF
Attachment 1 SOW FOC from ITB 221 to B209 V6.docx DOCX document
Attachment 9 GD13014od01 (MH14 208 208A 210 HH21 220).pdf PDF
Attachment 10 GD13014od02CG (MH213 218 221 221A HH300).pdf PDF
Attachment 14 GD13013dd01 (419 411 306 316 316a 333).pdf PDF
Attachment 16 GD13013od03CG (MH316 316A 411 418 419A419B).pdf PDF
Attachment 18 GD13014od02CG (MH213 218 221 221A HH300).pdf PDF
Attachment 19 GD14014od01CG (MH4A 221 B324).pdf PDF
Attachment 24 AF FORM 103 Work Clearance.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

As Built 15 February 2017

Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 1 of 4 Mech Rm Room Plan

EB 202 (ITB 405)

Last Edited: 14 February, 2017

POC: 412-474-8250

6'-0"

6' -0

N

S

E

W

Reuse 2" entry duct to Watch Rm Pullbox

5' 12SM FOC in pliable raceway to ITB 405

2' wall mount cabinet w/ FODP

Dedicated power & ground

20AMP/110V/L5-20R

Panel ELOW-1, Ckt # 9

20' ½” EMT to power panel ELOW-1

2" conc core to Watch Rm pullbox

4"x4" Pull box to Power panel ELOW-1 in Watch Rm

3' #6 AWG ground wire to EMT

3' #6 AWG ground wire to EMT

TGB

Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 2 of 4 Mech Rm Elevation

EB 202 (ITB 405)

Last Edited: 14 February, 2017

POC: 412-474-8250

Pre-Installation Photo

2' Wall Mount Cabinet

4' A

FF

Floor

AFF (Above Finished Floor)

12 Port FODP w/ 12SM FOC to ITB 405

SD

Cable Management

Cisco WS-C2960X-24PS-L

Surge ProtectorRESET

I MIN

R

BR

EA

K E

PR

ES

S

TO

Post Installation Photo

Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 3 of 4 Watch Rm Room Plan

EB 202 (ITB 405)

Last Edited: 14 February, 2017

POC: 412-474-8250

N

S

E

W

Power panel ELOW-1 Ckt # 9

6'-0"

6' -0

Pull box Reuse 2" Entry duct

3' #6 AWG ground wire to Pullbox in Mech Rm

2" conc core to Mech Rm

.03ohms

12SM FOC in pliable raceway to ITB 405

Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 4 of 4 Watch Rm Elevation

EB 202 (ITB 405)

Last Edited: 14 February, 2017

POC: 412-474-8250

Pre-Installation Photo Post Installation Photo

File details come from the government source that posted it. Updated .