Attachment 28 EB 00202.pdf
PDF 527 KB Posted
- Attached to
- Fiber Optic Cable Install - Qty 6 Federal contract opportunity
- Solicitation number
- FA671223Q0014
About this file
This document contains an as-built telecommunications system installation plan and related federal contract opportunity. The installation plan provides details for a fiber optic cable installation at the Pittsburgh ARS facility in Pennsylvania. It includes room plans, equipment details, and pre- and post-installation photos. The related solicitation is for the procurement of fiber optic cable installations at six locations under Solicitation Number FA671223Q0014 issued by the Department of the Air Force Reserve Command. The opportunity type is listed as a solicitation.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
As Built 15 February 2017
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 1 of 4 Mech Rm Room Plan
EB 202 (ITB 405)
Last Edited: 14 February, 2017
POC: 412-474-8250
6'-0"
6' -0
N
S
E
W
Reuse 2" entry duct to Watch Rm Pullbox
5' 12SM FOC in pliable raceway to ITB 405
2' wall mount cabinet w/ FODP
Dedicated power & ground
20AMP/110V/L5-20R
Panel ELOW-1, Ckt # 9
20' ½” EMT to power panel ELOW-1
2" conc core to Watch Rm pullbox
4"x4" Pull box to Power panel ELOW-1 in Watch Rm
3' #6 AWG ground wire to EMT
3' #6 AWG ground wire to EMT
TGB
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 2 of 4 Mech Rm Elevation
EB 202 (ITB 405)
Last Edited: 14 February, 2017
POC: 412-474-8250
Pre-Installation Photo
2' Wall Mount Cabinet
4' A
FF
Floor
AFF (Above Finished Floor)
12 Port FODP w/ 12SM FOC to ITB 405
SD
Cable Management
Cisco WS-C2960X-24PS-L
Surge ProtectorRESET
I MIN
R
BR
EA
K E
PR
ES
S
TO
Post Installation Photo
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 3 of 4 Watch Rm Room Plan
EB 202 (ITB 405)
Last Edited: 14 February, 2017
POC: 412-474-8250
N
S
E
W
Power panel ELOW-1 Ckt # 9
6'-0"
6' -0
Pull box Reuse 2" Entry duct
3' #6 AWG ground wire to Pullbox in Mech Rm
2" conc core to Mech Rm
.03ohms
12SM FOC in pliable raceway to ITB 405
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 4 of 4 Watch Rm Elevation
EB 202 (ITB 405)
Last Edited: 14 February, 2017
POC: 412-474-8250
Pre-Installation Photo Post Installation Photo
File details come from the government source that posted it. Updated .