Attachment 20 ITB 00405.pdf
PDF 7 MB Posted
- Attached to
- Fiber Optic Cable Install - Qty 6 Federal contract opportunity
- Solicitation number
- FA671223Q0014
About this file
This document provides as-built drawings and specifications for a telecommunications system installation at the Pittsburgh ARS facility. Key details include fiber optic and copper cabling to be installed between a telephone frame room and server room, with detailed floor plans, elevations, and equipment specifications. The related federal contract opportunity is solicitation number FA671223Q0014 for the procurement of fiber optic cable installation quantities at six sites from the Department of the Air Force Reserve Command. Services required include installing fiber optic and copper cabling between two rooms according to the specifications provided in the as-built drawings, to be awarded under the listed solicitation number by the Air Force Reserve Command.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
As Built 15 February 2017
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 1 of 8 1st Floor Floor Plan
ITB 405
Last Edited: 14 February, 2017
POC: Les Vish 412-474-8491
Telephone Frame Rm
Server Rm 25
W
E
N
S
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 2 of 8 Telephone Frame Rm Room Plan
ITB 405
Last Edited: 14 February, 2017
POC: Les Vish 412-474-8491
A
W
E
N
S
Covered channel to vault
7' rack #1 w/ FODP
Reuse 7' rack #2 w/ FODP
FODP
Power panel 1.5ohms
100' (3ea) 48SM MIC in plenum innerduct to Server Rm 25
(2ea) 36SM FOC to ITB 221
72SM FOC w/ (12SM ea to EB's 417, 416, 102, 129, 130, & MH 129)
36SM FOC w/ (12SM ea to EB's 420, 408, 409)
(6ea) 12SM FOC to CEB's 419, 125, 210 & EB’s 401, 403, 411
36SM FOC w/ (12SM ea to EB's 111, 107, 202)
A
4" conc core
10' 6" ladder rack
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 3 of 8 Telephone Frame Rm Elevation
ITB 405
Last Edited: 14 February, 2017
POC: Les Vish 412-474-8491 7' Rack 1
WIC
FODP
FODP
Splice Chamber
FODP
Splice Chamber
FODP
FODP
Splice Chamber
WIC
Pre-Installation Photo
No Post Installation Photo Allowed
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 4 of 8 Telephone Frame Rm Elevation
ITB 405
Last Edited: 14 February, 2017
POC: Les Vish 412-474-8491 Reuse 7' Rack #2
Reuse FODP w/ 36SM FOC to EB 333
Reuse FODP w/ 48SM FOC to CEB 316 12SM FOC to CEB 418
FODP w/ 12MM FOC to EB 316 24MM FOC to EB 418
Reuse FODP w/ 24SM FOC to EB 108 12SM FOC to EB106
Reuse FODP w/ 12SM FOC to EB 110
Pre-Installation Photo
SD
Cable Management
144 Port FODP w/ (2ea) 36SM FOC to ITB 221 12SM FOC ea to CEB’s 125, 419, 403, EB’s 210, 401, & 411
SD
Cable Management 144 Port FODP w/ 72SM FOC w/ (12SM ea to EB’s 417, 416, 102, 129, 130, & MH 129) 36SM FOC w/ (12SM ea to 420 408, & 409) 36SM FOC w/ (12SM ea to 111, 107, & 202)
SD
Cable Management
144 Port FODP w/ (3ea) 48SM MIC to Server Rm
SD
Cable Management
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 5 of 8 Server Rm 25 Room Plan
ITB 405
Last Edited: 14 February, 2017
POC: Les Vish 412-474-8491
7' cabinet #4
W
E
N
S
(3ea) 48SM MIC in plenum innerduct to Telephone Frame Rm
7' cabinet #3
TG
B
Power panel MPA-MP Ckt #22, 24, 38
2.0ohms
7' cabinet
FODP
Power panel NED/1 Ckt #29, 31, 10, 41
8' 12" ladder rack
.08ohms to TGB
.08ohms to TGB
2.0ohms to power panel
Dedicated power (2ea) 20AMP/110V/L5-20R
Panel NED/1, Ckt# 10, 41 in Flex PVC
Dedicated power
30AMP/220V/L1430
Panel NED/1, Ckt #29, 31 in Flex PVC
Dedicated power
30AMP/220V/L1430
Panel MPA-MP, Ckt #22, 24 in Flex PVC
Dedicated power (2ea) 20AMP/110V/L5-20R MPA-MP, Ckt# 38 in Flex PVC
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 6 of 8 Server Rm 25 Elevation
ITB 405
Last Edited: 14 February, 2017
POC: Les Vish 412-474-8491
SD
SD
SD
7' Cabinet 3
24 Port Patch Panel
48 Port Patch Panel
48 Port Patch Panel
Cable Management
48 Port Patch Panel
48 Port Patch Panel
Cable Management
48 Port Patch Panel
24 Port Patch Panel
48 Port Patch Panel
Cable Management
24 Port Patch Panel
FODP
FODP
FODP
FODP
FODP
Pre-Installation Photo
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 7 of 8 Server Rm 25 Elevation
ITB 405
Last Edited: 14 February, 2017
POC: Les Vish 412-474-8491
MODE
CONSOLE
SYST XPS STAT SPEED DUPLX
S-PWR MAST ST ACK Po EEN
37X
38X
38 40 42 44 46 4837 39 41 43 45 47
Catalyst 3750-X Series PoE +
25X
26X
35X
36X
26 28 30 32 34 3625 27 29 31 33 35
13X
14X
1X
2X
11X
12X 24X
23X
14 16 18 20 22 2413 15 17 19 21 232 4 6 8 10 121 3 5 7 9 11
C3KX-NM-1G
NETWORK
MODULE
G1 G2 G3 G4
MODE
CONSOLE
SYST XPS STAT SPEED DUPLX
S-PWR MAST ST ACK Po EEN
37X
38X
38 40 42 44 46 4837 39 41 43 45 47
Catalyst 3750-X Series PoE +
25X
26X
35X
36X
26 28 30 32 34 3625 27 29 31 33 35
13X
14X
1X
2X
11X
12X 24X
23X
14 16 18 20 22 2413 15 17 19 21 232 4 6 8 10 121 3 5 7 9 11
C3KX-NM-1G
NETWORK
MODULE
G1 G2 G3 G4
MODE
CONSOLE
SYST XPS STAT SPEED DUPLX
S-PWR MAST ST ACK Po EEN
37X
38X
38 40 42 44 46 4837 39 41 43 45 47
Catalyst 3750-X Series PoE +
25X
26X
35X
36X
26 28 30 32 34 3625 27 29 31 33 35
13X
14X
1X
2X
11X
12X 24X
23X
14 16 18 20 22 2413 15 17 19 21 232 4 6 8 10 121 3 5 7 9 11
C3KX-NM-1G
NETWORK
MODULE
G1 G2 G3 G4
SD
7' Cabinet 4
Cisco WS-C3750-48P
Cisco WS-C3750-48P
Cisco WS-C3750-48P
Cable Management
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Pre-Installation Photo
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 8 of 8 Server Rm 25 Elevation
ITB 405
Last Edited: 14 February, 2017
POC: Les Vish 412-474-8491
No Pre-Installation Photo Allowed
Reuse 7' Cabinet
Equipment
Surge ProtectorRESET
I MIN
R
BR
EA
K E
PR
ES
S
TO
FAN
STATUS
Catalyst 4507R+E
SUPER
VISO
R
SUPERVISO
R
Cisco WS-C4507R+E
SD
Cable Management
144 Port FODP w/ (3ea) 48SM MIC to Telephone Frame Rm
FAN
STATUS
Catalyst 4507R+E
SUPER
VISO
R
SUPERVISO
R
Cisco WS-C4507R+E
File details come from the government source that posted it. Updated .