Attachment 11 ITB 00221.pdf
PDF 3 MB Posted
- Attached to
- Fiber Optic Cable Install - Qty 6 Federal contract opportunity
- Solicitation number
- FA671223Q0014
About this file
This document is an as-built telecommunications system installation plan for the Pittsburgh Air Reserve Station in Pennsylvania. It provides detailed floor plans and equipment layouts for the fiber optic cable and network infrastructure installed throughout various buildings and rooms on the base. The installation included over 700 feet of fiber optic cable run through conduit and cable trays with connections to over 25 communications equipment rooms. Key equipment deployed included fiber optic distribution panels, patch panels, switches and routers. The related federal contract opportunity is a solicitation from the Department of the Air Force Reserve Command for the installation of additional fiber optic cable with a quantity of six. No further details are provided on the opportunity in the documents reviewed.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
As Built 15 February 2017
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 1 of 6 Crawl Space Floor Plan
ITB 221
Last Edited: 14 February, 2017
POC: Security Forces 412-474-8250
W
E
N
S
12SM FOC to EB 220
A
144SM FOC w/ (36SM to ITB 405, 12SM ea to EB’s 300, 312, 333, 342, 306, 304, 301, CEB 316, & EB 307 (left dark in HH 306)
A 48SM FOC w/ (12SM ea to EB’s 213, 218, 325, & 320)
48SM FOC to ITB 300 ANG
24SM FOC w/ (12SM ea to CEB’s 418 & 419)
B
170' wall snake tray
Reuse Building entry
B
36SM FOC to ITB 405
36SM FOC w/ (12SM ea to CEB’s 125, 210 & 208)
10' #6 AWG ground wire to snake tray in Boiler Rm
B
A
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 2 of 6 1st Floor Floor Plan
ITB 221
Last Edited: 14 February, 2017
POC: Security Forces 412-474-8250
Rm
Boiler Rm
(below ground)
W
E
N
S
Mech Rm
Power panel B-MDP .41ohms
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 3 of 6 Mech Rm/Boiler Rm Room Plan
ITB 221
Last Edited: 14 February, 2017
POC: Security Forces 412-474-8250
W
E
N
S
Note:
1. Boiler Rm is below ground level and uses crawl space to route FOC.
(2ea) 4" conc core
24 sm FOC w/ (12sm ea to CEB’s418,419)
48sm FOCto ITB 300 ANG
144sm FOC w/ (36sm tp ITB 405, 12sm ea to EB’s 300,312,333,342,306,304,301, CEB’s 316,&EB 307(left dark in HH 306)
48sm FOC w/ (12sm ea to EB’s 213,218,325,320)
13' wall snake tray
Mech Rm Boiler Rm
#6 AWG ground wire to snake tray in crawlspace
20' #6 AWG ground wire to snake tray in Rm 120
(4ea) 4" conc coresCrawl space entrance
16' wall snake tray
4" conc core
A 4"X4" pull box
Power panel MDP Ckt #32, 34, 36, 38
25' #6 AWG ground wire to snake tray
.03ohms to service ground
70' ½” EMT to power panel MDP
1" conc core
36sm FOC w/ (12 ea to CEB’s 125,208,&210)
36sm FOC to ITB 405
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 4 of 6 Rm 120 Room Plan
ITB 221
Last Edited: 14 February, 2017
POC: Security Forces 412-474-8250
W
E
N
S
10'-0"
'-0
.10ohms
7' rack CAT 6 panel
Power panel
(2ea) Dedicated power
20AMP/110V/L5-20R
Panel MDP, Ckt #27,29
70' ½” EMT to power panel MDP
1" conc core
13' #6 AWG ground wire to TGB
#6 AWG ground wire to snake tray in Mech Rm
24sm FOC w/(12sm ea to CEB’s 418,419)
48sm FOC to ITB 300 ANG
144sm FOC w/(36sm to ITB 405 12sm ea to EB’s 300,312,333, 342,306,304,301,CEB’s 316, & 307 (left in dark in HH 306)
A
TG
B
10' #6 AWG ground wire to TGB
Dedicated power
20AMP/110V/L5-20R
Panel MDP, Ckt #32, 34, 36, 38
7' cabinet
.41ohms
.41ohms to power panel
4" conc core
36sm FOC w/ (12 eash to CEB’s
15,208,&210)
36sm FOC to ITB 405
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 5 of 6 Rm 120 Elevation
ITB 221
Last Edited: 14 February, 2017
POC: Security Forces 412-474-8250 Reuse 7' Rack
Pre-Installation Photo
2U FODP
2U 48 Port Patch Panel
SD
2U Wire Management
2U 48 Port Patch Panel
SD
2U Wire Management
2U 48 Port Patch Panel
SD
2U Wire Management
1U 24 Port Patch Panel
2U 24 Port Patch Panel
SD
1U Wire Management
WS-3850-48PT
SD
2U Wire Management
WS-3850-48PT
Load
AVR Boost
On Line
AVR Trim
Replace Battery
On Battery
Overload
Battery Charge
Test I
O www .apcc.com
Smart-UPS
3 0 0 0 2000 UPS
Surge ProtectorRESET
I MIN
R
BR
EA
K E
PR
ES
S
TO
Equipment
SD
1U Wire Management
No Post Installation Photo Allowed
Telecommunications System Installation Plan - CDRL A002 – Pittsburgh ARS, Pennsylvania Page 6 of 6 Rm 120 Elevation
ITB 221
Last Edited: 14 February, 2017
POC: Security Forces 412-474-8250 7' Rack
No Pre-Installation Photo Allowed
221/405 1-36, 37-48, 221/312, 49-60 221/316, 61-72, 221/333, 73-84, 221/342, 85-96 221/306, 97-108, 221/304, 109-120, 221/301, 121-132 221/HH316 Dark, 133-144
405/221, 1-36, 221/418, 1-12, 221/419, 13-24 221/220, 1-12, 221/125, 1-12, 221/210, 13-24 221/208, 25-36 221/213, 1-12 221/320, 13-24 221/325, 25-36 221/218, 37-48
221-ANG300, 1-48
SD
Cable Management
WS-3850-12S
SD
Cable Management
WS-3850-12S
SD
Cable Management
WS-3850-12S
SD
Cable Management
WS-3850-12S
SD
Cable Management
WS-3850-12S
SD
Cable Management
WS-3850-12S
SD
Cable Management
WS-3850-12S
Load
AVR Boost
On Line
AVR Trim
Replace Battery
On Battery
Overload
Battery Charge
Test I
O ww w.apcc.c om
Smart-UPS
3 0 0 0 2000 UPS
BatteryPack Battery
Surge ProtectorRESET
I MIN
R
BR
EA
K E
PR
ES
S
TO
Surge ProtectorRESET
I MIN
R
BR
EA
K E
PR
ES
S
TO
Pre-Installation Photo
File details come from the government source that posted it. Updated .