FA671223B0002 Bid Schedule.pdf
PDF 193 KB Posted
- Attached to
- Replace Roof - Building 411 Federal contract opportunity
- Solicitation number
- FA671223B0002
About this file
This bid schedule outlines the requirements for a federal contract to replace the roof of Building 411 at a Department of the Air Force Reserve Command facility. The contractor will provide all administration, facilities, materials, labor, and equipment necessary to complete the roof replacement as identified in the contract documents and specifications. The single contract line item (CLIN) is to replace the roof of Building 411 for a firm fixed price to be provided by the bidder. No other details are included regarding response dates, pricing terms, set asides, incumbents or other salient information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Directions to 911AW Contracting Office.pdf | ||
| FA671223B0002 Bid Instructions.pdf | ||
| RFI Questions-Answers.pdf | ||
| Solicitation Amendment FA671223B00020001 SF 30.pdf | ||
| DBA PA20230001 07-28-2023.pdf | ||
| 35-05-05 Aircraft Engine Inspection Repair Shop (1980) As-Built Drawings.pdf | ||
| Replace Roof B411 Drawings-Revised A-1 Sheet.pdf | ||
| B411 Site Visit sign-in_Scanned.pdf | ||
| 3-JLSS 21-0005 Project Specifications.pdf | ||
| 4-2022 CONTRACTOR-VISITOR ACCESS MEMO.pdf | ||
| 7-DBA PA20230001 07-21-2023.pdf | ||
| 6-Bid schedule.pdf | ||
| 9-Supplemental Provisions and Clauses.pdf | ||
| 5-RFI-Communication Form_fillable.pdf | ||
| 1-JLSS 21-0005 Construction SOW.pdf | ||
| 2-JLSS 21-0005 Drawings.pdf | ||
| Solicitation - FA671223B0002.pdf | ||
| 8-Ozone Certification JLSS 21-0005.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
FA671223B0002
REPLACE ROOF, B411
PROJECT NO. 21-0005
UNIT
ITEM DESCRIPTION QTY UNIT PRICE TOTAL
Provide all administration, facilities, materials, labor, and equipment and perform all operations necessary to complete construction as identified in the contract documents, to include, but not limited to specifications and drawings identified herein.
CLIN 0001 REPLACE ROOF, B411
TOTAL BID PRICE $
1 JOB
BID SCHEDULE
REPLACE ROOF, B411
PROJECT NO. 21-0005
UNIT
ITEM DESCRIPTION QTY UNIT PRICE TOTAL
Provide all administration, facilities, materials, labor, and equipment and perform all operations necessary to complete construction as identified in the contract documents, to include, but not limited to specifications and drawings identified herein.
CLIN 0001 REPLACE ROOF, B411
1 JOB $________ $________
TOTAL BID PRICE $________
File details come from the government source that posted it. Updated .