Summary_of_changes_29_Dec_2016.docx

DOCX document 14 KB Posted

Attached to
Base Operations and Support Services (BOS) at Pittsburgh ARS, PA
Solicitation number
FA6712-16-R-0001
Issued by

About this file

Summary of PWS changes

View the file

Other files

File Type Posted
SCA_Wage_Determination_2015-4235.pdf PDF
FA6712-16-R-0001-0009.pdf PDF
FA6712-16-R-0001-0008.docx DOCX document
WD_PA170001.pdf PDF
WD_PA170004.pdf PDF
Tab_A_Q&A_PITTSBURGH_BOS.docx DOCX document
Q&A_Pittsburgh_Tab_C_response_28_Dec.docx DOCX document
NEW_CBA_-_Pittsburgh_-_01_Feb_2017_to_31_Jan_2018_-_Final_-_Signed_-_recd_20_Dec_2016.pdf PDF
Q&A_Pittsburgh_Tab_B_Response_Dec_28_2016.docx DOCX document
FA6712-16-R-0001-0007.pdf PDF
Pittsburgh_BOS_PWS_Rev_2,_Jan_3_2017.docx DOCX document
Q&A_Pittsburgh_Tab_F_28_Dec_2016.docx DOCX document
Pittsburgh_BOS_PWS_Sep__2016.docx DOCX document
Atch_16_Revised_GFP_data_7_Sep_2016.xls XLS spreadsheet
FA6712-16-R-0001-0006.docx DOCX document
Conformed_FA6712-16-R-0001.docx DOCX document
Pittsburgh_Attachment_11_Pricing_Matrix_Rev_3,_5_Dec_2016.xlsx XLSX spreadsheet
Pittsburgh_BOS_PWS_Sep__2016.docx DOCX document
Pittsburgh_BOS__WD_PA4.txt TXT text file
Pittsburge_BOS_WD_PA1.txt TXT text file
Amend_0005.pdf PDF
FA6712-16-R-0001-0004.pdf PDF
FA6712-16-R-0001-0003.pdf PDF
FA6712-16-R-0001-0002_Conformed_Copy.pdf PDF
Attach_11_-_Pricing_Matrix_Rev_1_7_Jan_16_.xlsx XLSX spreadsheet
FA6712-16-R-0001-0002.pdf PDF
FA6712-16-R-0001_0001.pdf PDF
Site_Visit_Memo_Rev_1_-_Pittsburgh.pdf PDF
Atch_2_-_PPC_Brief_18_Nov_2015.pptx PPTX presentation
F-TE-7-D-1_ELECTRIC_DISTRIBUTION_PLAN_2015.pdf PDF
F-TE-7-C-5_AIRFIELD_MARKING_2015.pdf PDF
F-TE-7-C-8_BASE_STREETS_SNOW_REMOVAL_PRIORITY_MAP_2015.pdf PDF
F-TE-7-C-7_AIRFIELD_SNOW_REMOVAL_PRIORITY_MAP_2015.pdf PDF
F-TE-7-A-2_SNOW_PLOW_STAKES_2015.pdf PDF
Atch_3_-_Pittsburgh_ARS_Site_Visit_Agenda_-_18Nov2015.pdf PDF
C-F-TE-7-C-1_C-2_GROUNDS_MAINTENANCE.pdf PDF
F-TE-7-E-3_STORM_DRAINAGE_SYSTEM_2015.pdf PDF
F-TE-7-A-1_LANDSCAPING_PLAN_2015.pdf PDF
Atch_1_-_Pittsburgh_BOS_site_visit_Sign-in_Roster_from_18Nov2015.pdf PDF
Snow_Removal_Plan_2015.pdf PDF
F-TE-7-L_BASE_WATER_OUTFALL_INFALL_MAP_2015.pdf PDF
F-TE-7-E-2_SANITARY_SEWER_SYSTEM_2015.pdf PDF
F-TE-7-D-2_AIRFIELD_LIGHTING_2015.pdf PDF
2015_Integrated_Pest_Management_Plan2.pdf PDF
F-TE-7-E-1_WATER_SUPPLY_SYSTEM_2015.pdf PDF
F-TE-7_BASE_PLOT_PLAN_2015.pdf PDF
F-TE-7-G_LIQUID_FUEL_SYSTEMS.pdf PDF
F-TE-7-H_GAS_DISTRIBUTION_SYSTEM_2015.pdf PDF
F-TE-7-C-3_C-4_PAVEMENT_SWEEPING_PLAN_2015.pdf PDF
911ARS_BaseMap_WasteWaterUtilityNode_2015.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of changes to Pittsburgh ARS PWS Revision 1, 09 Sep 2016:

1) Paragraph F5.20.1: Second to last sentence, added “with a load bank” after testing.

2) Paragraph F5.25.8 Septic Tank Systems: “The KTR shall on a quarterly basis pump the 5000 gallon sewage holding tank at the firing range located at Clinton Pa.” was added.

3) Paragraph F5.26.6 Gas Valves: “Gas valve locations and numbering can be found on the Gas Distribution System Map, F-TE-7-H.” was added as the next to last sentence.

4) Paragraph F6.1.4: Added “provide and” in the last sentence.

5) Paragraph F6.3.11 was added. “F6.3.11 The KTR shall sweep all debris from the base running track a minimum of one time per week.”

6) F-TE-2e Water Heaters: Updated building 110 data.

7) F-TE-2e DDC HVAC and UMCS Control Systems: Updated building 114 data.

8) F-TE-2e Thermostatic Water Temperature Limiting Device: Added building 213 with a quantity of one.

9) F-TE-2g HVAC Filter Location and Quantities: Chart updated for filter sizes on two Facility 110 entries, three Facility 218 entries, and a new line was entered for Facility 418.

10) F-TE-2h Fire Detection, Protection and Suppression Systems: Charts have been updated.

11) F-TE-3 DATA DELIVERIES: Chart updated. New entry F09a. F58 updated.

12) F-TE-5 Technical Acronyms/Definitions: APIMS, Air Program Inventory Management System added.

13) F-TE-6 MAS #1: Chart updated for Facility 213 and 305 updated.

14) F-TE-6 MAS #5: Chart updated for one Facility 411 entry.

15) F-TE-6 MAS #7: Chart updated to add load percentages.

16) F-TE-6 MAS #12: New chart added. Operating PSI, MAS PSI, and Temperature Range added to the new chart.

17) F-TE-6 MAS #17: Chart updated to add Facility 342.

18) F-TE-6 MAS #18: New chart added.

19) F-TE-6 MAS #24: Quantity for Facility 103 increased from 2 to 4.

20) F-TE-6 MAS #28: Quantity for Facility 103 increased from 2 to 4.

21) F-TE-6 MAS #29: Quantity for Facility 322 increased from 3 to 4.

22) F-TE-6 MAS #30: Facility 322 added with a quantity of one.

23) F-TE-6 MAS #3b Maintenance Actions Required sheet: Sheet updated to change “Replace compressor oil” to an annual requirement and not quarterly.

24) F-TE-6 MAS #18h, 18i, 18j, 18o, 18p, 18q and 18r Maintenance Actions Required sheet: Added “check superheat and subcooling temperatures” to the Check refrigerant pressure step.

25) F-TE-7 MAPS: List updated.

File details come from the government source that posted it. Updated .