Summary of changes to Pittsburgh ARS PWS Revision 1, 09 Sep 2016:
1) Paragraph F5.20.1: Second to last sentence, added “with a load bank” after testing.
2) Paragraph F5.25.8 Septic Tank Systems: “The KTR shall on a quarterly basis pump the 5000 gallon sewage holding tank at the firing range located at Clinton Pa.” was added.
3) Paragraph F5.26.6 Gas Valves: “Gas valve locations and numbering can be found on the Gas Distribution System Map, F-TE-7-H.” was added as the next to last sentence.
4) Paragraph F6.1.4: Added “provide and” in the last sentence.
5) Paragraph F6.3.11 was added. “F6.3.11 The KTR shall sweep all debris from the base running track a minimum of one time per week.”
6) F-TE-2e Water Heaters: Updated building 110 data.
7) F-TE-2e DDC HVAC and UMCS Control Systems: Updated building 114 data.
8) F-TE-2e Thermostatic Water Temperature Limiting Device: Added building 213 with a quantity of one.
9) F-TE-2g HVAC Filter Location and Quantities: Chart updated for filter sizes on two Facility 110 entries, three Facility 218 entries, and a new line was entered for Facility 418.
10) F-TE-2h Fire Detection, Protection and Suppression Systems: Charts have been updated.
11) F-TE-3 DATA DELIVERIES: Chart updated. New entry F09a. F58 updated.
12) F-TE-5 Technical Acronyms/Definitions: APIMS, Air Program Inventory Management System added.
13) F-TE-6 MAS #1: Chart updated for Facility 213 and 305 updated.
14) F-TE-6 MAS #5: Chart updated for one Facility 411 entry.
15) F-TE-6 MAS #7: Chart updated to add load percentages.
16) F-TE-6 MAS #12: New chart added. Operating PSI, MAS PSI, and Temperature Range added to the new chart.
17) F-TE-6 MAS #17: Chart updated to add Facility 342.
18) F-TE-6 MAS #18: New chart added.
19) F-TE-6 MAS #24: Quantity for Facility 103 increased from 2 to 4.
20) F-TE-6 MAS #28: Quantity for Facility 103 increased from 2 to 4.
21) F-TE-6 MAS #29: Quantity for Facility 322 increased from 3 to 4.
22) F-TE-6 MAS #30: Facility 322 added with a quantity of one.
23) F-TE-6 MAS #3b Maintenance Actions Required sheet: Sheet updated to change “Replace compressor oil” to an annual requirement and not quarterly.
24) F-TE-6 MAS #18h, 18i, 18j, 18o, 18p, 18q and 18r Maintenance Actions Required sheet: Added “check superheat and subcooling temperatures” to the Check refrigerant pressure step.
25) F-TE-7 MAPS: List updated.