SUBMITTALS_REGISTER_-_Revised.pdf

PDF 293 KB Posted

Attached to
Building 1630 Renovation Federal contract opportunity
Solicitation number
FA667518R0002
Issued by
Department of the Air Force Reserve Command

About this file

Revised Submittals Register. Previously posted on 4/11/2018.

View the file

Other files for this federal contract opportunity

Other files attached to Building 1630 Renovation, newest first.
File Type Posted
Responses_To_Be_Posted-5.pdf PDF
Responses_To_Be_Posted-4.pdf PDF
Sheets_Referred_To_In_Responses_To_Be_Posted-4.pdf PDF
Table_of_Contents.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_COMM_Drawings.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Concrete_Joint_Spec_05_72_00.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Spec_03_35_43_Polished_Concrete.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_-_Specifications_(Revision__4).pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Demolition_Specification_02_41_00.pdf PDF
FA6675-18-R-0002_B1630_Amendment__2.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_EFIS_System_Spec_07_24_00_(Revised).pdf PDF
FA6675-18-R-0002_B1630_Amendment__3.pdf PDF
RFI_Responses_To_Be_Posted-3.pdf PDF
RFI_Responses_To_Be_Posted-2.pdf PDF
RFI_Responses_To_Be_Posted.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_EFIS_System_Spec_07_24_00_(Revised).pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_-_Specifications_(Revision__4).pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_COMM_Drawings.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Concrete_Joint_Spec_05_72_00.pdf PDF
Table_of_Contents.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Demolition_Specification_02_41_00.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Spec_03_35_43_Polished_Concrete.pdf PDF
SUBMITTALS_REGISTER_-_Revised.pdf PDF
FA6675-18-R-0002_B1630_Amendment__2.pdf PDF
RFI_-RFC_FORM.pdf PDF
Site_Visit_Sign-in_Sheet_-_20180327.pdf PDF
FA6675-18-R-0002_B1630_Amendment__1.pdf PDF
ATT12-1630_-_DDPM_120002_-_Concrete_Joint_-_Spec_05_72_00.pdf PDF
ATT7-Wage_Determinations_-_1-12-2018.pdf PDF
ATT4-B1630_Comm_Line_Relocate_Drawings.pdf PDF
ATT14-RFI_Form.pdf PDF
ATT15-SF24_Bid_Bond_Blank_Form.pdf PDF
ATT6-B1630__Basis_of_Design_-_Comm_Line_Relocate.pdf PDF
ATT8-Asbestos_Report_F5A6CE7363AW01_B1630_RENOVATE_LIFE_SUPPORT.pdf PDF
ATT5-B1630_Basis_of_Design_-_Addition_Renovation.pdf PDF
ATT10-95145107-Geotech_Report.pdf PDF
ATT2-B1630_A&E_Dev_Specs_-_Comm_Line_Relocation.pdf PDF
FA667518R0002_B1630_Solicitation.pdf PDF
ATT9-B1630_Lead_Based_Paint_Report.pdf PDF
ATT13-Spec_03_35_43_Polished_Concrete.pdf PDF
ATT3-B1630_Renovation_Drawings.pdf PDF
ATT1-B1630_A&E_Dev_Specs_-_Addition_Renovation.pdf PDF
ATT11-RFI_Clarifications.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 47 PAGES

FA6643-10-D-0002

Addition/Renovation of 301st Life Support Building 1630

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

01 78 23 SD-10 Operation and Maintenance Data

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.5 GValidation of Training Completion

01 91 00.00 37 SD-01 Preconstruction Submittals

1.9 GDraft Cx Plan and Schedule

1.9 GFinal Cx Plan and Schedule

SD-02 Shop Drawings 1.11.2Control Drawings

SD-06 Test Reports

3.6 GFilled out functional test

readiness forms

3.1.3 GCompleted PFT checklists

3.1.4.1 GCompleted startup checklists

3.6.4Completed FPT forms 3.1.5Nonconformance and Approval in

PFT checklists and Startup 3.7Progress reports and test results

SD-07 Certificates

1.5.2 GCommissioning Firm

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

01 91 00.00 37 1.5.3 GCommissioning Agent 3.2Calibration documentation 3.2Calibration certification

SD-08 Manufacturer’s Instructions 1.10Startup and Checkout Plan 1.10Checkout Forms 1.10Test Procedures

SD-10 Operation and Maintenance Data

3.9.1 GTraining Plan

3.9.3Training Documentation 3.9.4Training Verification

SD-11 Closeout Submittals

1.11.1 GFinal Cx Report

1.11.2 GSystems Manual

3.7.4Deficiency Report and Resolution

Record 02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

03 30 00 1.6.7 GQuality Control Personnel Certifications

1.6.9Laboratory Accreditation SD-02 Shop Drawings

1.6.2.1Reinforcing steel SD-03 Product Data

2.4.8Joint sealants 2.4.7Joint filler 2.4.1Cementitious Materials 2.4.6Vapor retarder 2.3.3Concrete Curing Materials 2.5Reinforcement 2.6.1Liquid Chemical Floor Hardener 2.4.5Admixtures

SD-05 Design Data 2.3.1mix design

SD-06 Test Reports

1.6.1.1 GConcrete mix design

1.6.4.1Fly ash 1.6.4.1Pozzolan 1.6.4.2Ground granulated blast-furnace slag 2.4.3Aggregates

3.12.2.3 GCompressive strength tests

3.12.2.4Air Content 3.12.2.1Slump Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

03 30 00 2.4.2Water SD-07 Certificates

2.5.1Reinforcing Bars 1.8Welder Qualifications 1.6.3.2Material Safety Data Sheets 1.6.7.2Field Testing Technician and

Testing Agency SD-08 Manufacturer’s Instructions

2.6.1Liquid Chemical Floor Hardener 2.3.3Curing Compound

04 20 00 SD-03 Product Data 2.4.3Cement 1.6.2Cold Weather Installation

SD-04 Samples

2.2 GConcrete Masonry Units (CMU)

2.6Anchors, Ties, and Bar

Positioners 2.10Expansion-Joint Materials 2.7Joint Reinforcement

SD-05 Design Data 1.2.1.1Unit Strength Method

SD-06 Test Reports

3.15.1 GField Testing of Mortar

3.15.2 GField Testing of Grout

3.15.3 GPrism tests

2.4.3Masonry Cement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

04 20 00 1.4.1 GMasonry Inspector Qualifications SD-07 Certificates

2.2Concrete Masonry Units (CMU) 2.6Anchors, Ties, and Bar

Positioners 2.10Expansion-Joint Materials 2.7Joint Reinforcement 2.4.3Masonry Cement 2.4.1Admixtures for Masonry Mortar 2.5.1Admixtures for Grout

SD-08 Manufacturer’s Instructions 2.4.3Masonry Cement

05 12 00 SD-02 Shop Drawings

1.3.1 GFabrication drawings

SD-03 Product Data 2.5.2Shop primer 2.4.1Welding electrodes and rods 2.4.2Non-Shrink Grout

SD-06 Test Reports 2.3Bolts, nuts, and washers 3.6.1.1Weld Inspection Reports

SD-07 Certificates 2.2Steel 2.3Bolts, nuts, and washers 1.3.2.1Welding procedures and qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

05 12 00 2.4.1Welding electrodes and rods 05 40 00 SD-02 Shop Drawings

1.6.1Framing Components SD-03 Product Data

2.1studs,joists SD-07 Certificates

1.4Load-bearing cold-formed metal framing

3.1.1Welds 05 50 13 SD-02 Shop Drawings

2.5Expansion joint covers SD-03 Product Data

2.3Access doors and panels 2.4Control-joint covers 2.5Expansion joint covers 2.7Wheel guards

06 20 00 SD-02 Shop Drawings 1.3Detail Drawings

06 61 16 SD-03 Product Data 1.4.1Solid polymer material 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications

SD-04 Samples 2.1Material

07 11 13 SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

07 11 13 1.3Materials 07 13 53 SD-03 Product Data

1.3Manufacturer's Standard Details 2.1Elastomeric Waterproofing Sheet

Material 1.4Primers, Adhesives, and Mastics 2.1Primers, Adhesives, and Mastics

SD-06 Test Reports 2.1Elastomeric Waterproofing Sheet

Material 3.7Protective Covering

SD-07 Certificates 2.1Elastomeric Waterproofing Sheet

Material 1.4Primers, Adhesives, and Mastics 2.1Primers, Adhesives, and Mastics 1.4Protective Coverings 1.8Special Warranties 1.8Special Warranties

SD-08 Manufacturer’s Instructions 1.4Primers, Adhesives, and Mastics 2.1Primers, Adhesives, and Mastics

07 14 00 SD-03 Product Data 2.1Fluid-applied membrane 2.2Membrane primer 2.8Elastomeric sheet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

07 14 00 2.10Flexible foam-backed elastomeric sheet

3.3Solvent 3.4.1Moisture meter 2.11Protection board 2.7Bond breaker

SD-11 Closeout Submittals 1.6Warranty 3.6Information Card 3.5Instructions To Government

Personnel 07 21 13 SD-03 Product Data

2.1Block or board insulation 2.2Vapor retarder 2.3Pressure sensitive tape 2.4Protection board or coating 2.5Accessories

SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.5.1Adhesive

07 21 16 SD-03 Product Data 2.1Blanket insulation 2.2Sill sealer insulation 2.4Pressure sensitive tape 2.5Accessories

07 22 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

07 22 00 2.4Fasteners 2.1Insulation

SD-08 Manufacturer’s Instructions 2.4fasteners 2.1insulation

07 24 00 SD-02 Shop Drawings

3.3 GShop drawings

SD-03 Product Data 2.2Sheathing board 2.5Thermal insulation 2.4Mechanical Fasteners 2.11Accessories 2.6Base coat 2.7Portland cement 2.8Reinforcing fabric 2.9Finish coat 2.12Joint Sealant 2.10Sealant Primer 2.13Bond breaker 2.14Backer Rod 1.4.5Insulation Board 1.7Warranty

SD-04 Samples

1.2.3.7 GSample Boards

SD-05 Design Data 1.2.1.2Wind load

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

07 24 00 1.2.4Moisture analysis SD-06 Test Reports

1.2.3.1Abrasion resistance 1.2.3.2Accelerated weathering 1.2.2.3Impact resistance 1.2.3.3Mildew resistance 1.2.3.4Salt spray resistance 1.2.4vapor transmission 1.2.3.6Absorption-freeze-thaw 1.2.1.3Wall fire test 1.2.1.1Water penetration 1.2.3.5Water resistance 1.2.1.3Full scale or intermediate scale fire test 1.2.2.1Surface Burning Characteristics 1.2.2.2Radiant heat 3.1Substrate 1.2.1.2Wind load

SD-07 Certificates 1.4.1Qualifications of EIFS

Manufacturer 1.4.2Qualification of EIFS Installer 1.4.3Qualification of Sealant

Applicator 1.4.4Qualifications of Third Party

Inspector

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

07 24 00 3.5.2 GInspection Check List SD-08 Manufacturer’s Instructions

3.3Installation SD-10 Operation and Maintenance Data

1.7EIFS

07 60 00 SD-02 Shop Drawings

3.1.20Covering on flat, sloped, or curved surfaces

3.1.15Gutters 3.1.16Downspouts 3.1.21Expansion joints 3.1.13Fascias 3.1.17Flashing for roof drains 3.1.11Base flashing 3.1.12Counterflashing 3.1.22Flashing at roof penetrations 3.1.14Drip edge 3.1.18Open valley flashing 3.1.19Eave flashing

SD-11 Closeout Submittals 3.5Quality Control Plan

07 61 14.00 20 SD-02 Shop Drawings

1.2.5 GRoofing

SD-03 Product Data

1.2.5 GRoofing panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

07 61 14.00 20 2.1 GRoofing panels 2.3Attachment clips 2.4.1Closures 2.4Accessories 2.4.2Fasteners 2.4.3Sealants 2.5Insulation

1.7 Gwarranty

SD-05 Design Data 1.5Design calculations

SD-06 Test Reports 3.6Field Inspection 1.3.3Structural performance 1.6.6Finish

SD-07 Certificates 1.6.3Manufacturer's Technical

Representative 1.6.4Installer's Qualifications 2.1Coil stock

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-11 Closeout Submittals 3.8Information card

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

07 84 00 2.2 GFirestopping Materials SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2Inspector Qualifications 2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.4 GFrames

2.4 GFrames

2.2Accessories

SD-03 Product Data 2.1Doors 2.4Frames 2.2Accessories

SD-04 Samples

2.7.3 GFactory-applied enamel finish

08 11 16 SD-02 Shop Drawings

1.5.1 GDoors, windows and frames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

08 11 16 SD-04 Samples 1.5.2.1Finish sample

SD-08 Manufacturer’s Instructions 2.1Doors and frames

08 14 00 SD-03 Product Data

2.1 GDoors

2.2Accessories 2.3.6Water-resistant sealer 1.4warranty

SD-04 Samples 2.1Doors

2.3.5.3 GDoor finish colors

08 33 23 SD-02 Shop Drawings

2.3 GOverhead Coiling Doors

1.4 GCounterbalancing Mechanism

2.5 GCounterbalancing Mechanism

1.4 GManual Door Operators

2.6 GManual Door Operators

1.4Electric Door Operators 2.3.3Bottom Bars 1.3Guides 2.5.1Mounting Brackets 2.3.7Overhead Drum 2.1Hood 2.4.3Hood 1.4Painting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

08 33 23 1.3 GInstallation Drawings SD-03 Product Data

2.3 GOverhead Coiling Doors

2.4Hardware 1.4Counterbalancing Mechanism 2.5Counterbalancing Mechanism 1.4Manual Door Operators 2.6Manual Door Operators

SD-05 Design Data 2.3Overhead Coiling Doors 2.4Hardware 1.4Counterbalancing Mechanism 2.5Counterbalancing Mechanism 1.4Manual Door Operators 2.6Manual Door Operators

SD-10 Operation and Maintenance Data

1.4Operation and Maintenance Manuals

3.4Operation and Maintenance Manuals

1.3Materials 2.3.1Materials 1.4Devices 2.3.6Devices 1.4Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

08 33 23 1.4Manufacture's Brochures 1.4Parts Lists 3.3.2Cleaning

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.9Fabrication Drawings

SD-03 Product Data

2.1 GWindows

2.2.6.1 GHardware

2.2.3 GFasteners

1.10 GWindow performance

2.3 GThermal-Barrier Windows

2.2.8 GScreens

2.2.2 GWeatherstripping

2.2.6 GAccessories

1.10.5Thermal performance

SD-04 Samples 1.4.2.1Window Sample

SD-06 Test Reports 1.4.3Minimum condensation resistance factor 1.4.3Resistance to forced entry

SD-10 Operation and Maintenance Data

2.1 GWindows

08 51 23 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

08 51 23 2.2Windows SD-03 Product Data

3.5Hardware 2.1Materials 2.5.2Fasteners 2.5Accessories

SD-04 Samples

2.6.2 GColor coating

SD-10 Operation and Maintenance Data

2.2Windows 08 71 00 SD-02 Shop Drawings

1.3 GHardware schedule

2.2.7Keying system

SD-03 Product Data 2.2Hardware items

08 81 00 SD-02 Shop Drawings 3.2Installation

SD-03 Product Data 1.3Glazing Accessories

SD-08 Manufacturer’s Instructions 2.2Setting and sealing materials

09 29 00 SD-03 Product Data 2.1.5Cementitious backer units 2.1.3Glass Mat Water-Resistant

Gypsum Tile Backing Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

09 29 00 2.1.2Water-Resistant Gypsum Backing Board

2.1.4Glass Mat Covered or Reinforced Gypsum Sheathing

2.1.4.1Glass Mat Covered or Reinforced Gypsum Sheathing Sealant

2.1.10Accessories SD-07 Certificates

2.1 GAsbestos Free Materials

SD-08 Manufacturer’s Instructions

2.1Material Safety Data Sheets SD-10 Operation and Maintenance Data

2.1Manufacturer maintenance instructions

09 30 13 SD-03 Product Data

2.1 GTile

2.2 GSetting-Bed

2.4Mortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1 GTransition Strips

2.5 GTransition Strips

2.4.3 GGrout

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

09 30 13 2.1Tile 2.4Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions

09 51 00 SD-03 Product Data 1.2.4Acoustical Ceiling Systems 2.1Acoustical Ceiling Systems

SD-04 Samples 1.4Acoustical Units 2.1Acoustical Units 3.1.3Acoustical Units 2.1.1Acoustic Ceiling Tiles

SD-06 Test Reports 1.2.1Ceiling Attenuation Class and

Test SD-07 Certificates

1.4Acoustical Units 2.1Acoustical Units 3.1.3Acoustical Units 2.1.1Acoustic Ceiling Tiles

09 65 00 SD-03 Product Data

2.8 GResilient Flooring and

Accessories 2.4Adhesives

2.1 GVinyl Composition Tile

2.2Wall Base

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

09 65 00 SD-04 Samples

2.8 GResilient Flooring and

Accessories SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests

SD-08 Manufacturer’s Instructions 3.2Surface Preparation 3.1Installation

SD-10 Operation and Maintenance Data

2.8Resilient Flooring and Accessories

09 68 00 SD-03 Product Data

2.1 GCarpet

SD-04 Samples

2.1 GCarpet

SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SD-07 Certificates 1.4Regulatory Requirements

SD-08 Manufacturer’s Instructions 3.1Surface Preparation 3.4Installation

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

09 68 00 3.5 GCleaning and Protection 09 90 00 SD-07 Certificates

1.3Contractor Qualification SD-08 Manufacturer’s Instructions

3.6.2Mixing 1.6.2Manufacturer's Material Safety

Data Sheets 10 14 00.20 SD-02 Shop Drawings

1.4.2 GDetail Drawings

SD-03 Product Data

3.1 GInstallation

1.6 GWarranty

SD-04 Samples

1.4.1 GInterior Signage

1.3 GSoftware

SD-10 Operation and Maintenance Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

10 21 13 SD-02 Shop Drawings

1.2Fabrication Drawings 3.2Installation Drawings

SD-03 Product Data 1.2Cleaning and Maintenance

Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

10 21 13 2.6Colors And Finishes 2.1.1Galvanized Steel Sheet 2.1.2Sound-Deadening Cores 2.1.3Anchoring Devices and

Fasteners 2.1.5Hardware and Fittings 2.1.4Brackets 2.1.6Door Hardware 2.2.1Toilet Enclosures 2.2.2Urinal Screens 2.4Pilaster Shoes

SD-04 Samples 2.6Colors and Finishes 2.1.5Hardware and Fittings 2.1.3Anchoring Devices and

Fasteners SD-07 Certificates

1.6Warranty SD-10 Operation and Maintenance Data

1.2.1Plastic Identification 10 26 13 SD-02 Shop Drawings

2.3Door Protectors SD-03 Product Data

2.2Corner Guards 2.3Door Protectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

10 28 13 SD-03 Product Data 2.1.2Finishes 2.2Accessory Items

10 44 16 SD-01 Preconstruction Submittals

2.1.1 GManufacturer's Data

SD-03 Product Data

2.1.1 GFire Extinguishers

3.1 GFire Extinguishers

2.1.1 GAccessories

2.2.1 GWall Brackets

12 21 00 SD-02 Shop Drawings 3.2Installation

SD-03 Product Data 2.1Window Blinds 3.2Installation

SD-04 Samples 2.1Window Blinds

12 50 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

3.1 GInstallation

SD-03 Product Data 1.2.3Furniture Systems 1.6Warranty 1.2.1Workstations

SD-04 Samples 1.2.1Workstations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

12 50 00 1.2.3Mock-up SD-06 Test Reports

1.2.5.1Selected Components 1.4.2Fire Safety 1.4.3Electrical System 2.1.1Emissions

SD-07 Certificates 1.2.1Workstations

SD-10 Operation and Maintenance Data

2.2.1Assembly Manuals 2.2.2Assembly Manuals 3.2Maintenance Manuals 3.2Cleaning 1.4.3Electrical System 2.1Plastic Identification 1.7Maintenance Service

21 13 13.00 20 SD-02 Shop Drawings

1.5.2 GShop Drawings

SD-03 Product Data

2.2.1 GPipe

2.2.1 GFittings

2.2.6 GAlarm valves

2.2.4 GValves

2.2.7 GElectric Waterflow Alarm Bell

2.2.3 GSprinklers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

21 13 13.00 20 2.2.5 GPipe hangers and supports

2.3.1 GSprinkler Alarm Switches

2.2.8 GFire department connections

2.2.1 GMechanical couplings

2.2.9 GBackflow Prevention Assembly

SD-05 Design Data

1.3 GHydraulic Calculations

SD-06 Test Reports

3.6 Grequest to schedule Preliminary

Tests

3.6 GPreliminary Test Report

3.7 Grequest to schedule Final

Acceptance Test

3.7 GFinal Acceptance Test Report

SD-07 Certificates

3.1 GInspection by Fire Protection

Engineer

1.5.1 GFire Protection Engineer

1.5.2 GSprinkler System Installer

SD-10 Operation and Maintenance Data

3.8Operating and Maintenance Instructions

SD-11 Closeout Submittals 3.7As-built drawings 3.8On-site training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

21 13 18.00 10 SD-02 Shop Drawings

1.4.3 GShop Drawings

3.8As-Built Drawings

SD-03 Product Data

1.4.1 GFire Protection Specialist

1.4.2Installer Qualifications 1.4.1List of Submittals

2.1 GMaterials and Equipment

1.6Spare Parts

3.9 GOnSite Training

SD-05 Design Data 3.3.1Sway Bracing

1.2.1.2 GHydraulic Calculations

2.13.4.1 GStorage Batteries

SD-06 Test Reports

3.7 GPreliminary Tests

3.8Final Acceptance Tests

SD-07 Certificates

3.2 GInspection by Fire Protection

Specialist SD-10 Operation and Maintenance Data

3.9 GOperating and Maintenance

Instructions

22 00 00 SD-02 Shop Drawings

3.9.1 GPlumbing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

22 00 00 SD-03 Product Data

2.4 GFixtures

2.4.3Flush valve water closets 2.4.4Flush valve urinals 2.4.5Wall hung lavatories 2.4.6Countertop lavatories 2.4.7Kitchen sinks 2.4.8Service sinks

2.4.9 GDrinking-water coolers

2.9 GWater heaters

2.11 GPumps

3.9.1.1 GBackflow prevention assemblies

2.6.2 GShower Faucets

2.12 GCentral Vacuum System

1.5.1Welding

3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports 3.9Tests, Flushing and Disinfection

3.9.1.1 GTest of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

22 00 00 3.9.1 GPlumbing System 23 00 00 SD-02 Shop Drawings

1.4.5 GDetail Drawings

1.2.1.2Diagrams

SD-03 Product Data 2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible

Duct Runouts 2.9.1.2Duct Connectors

2.9.2 GDuct Access Doors

2.9.3 GManual Balancing Dampers

2.9.6.1Diffusers 2.9.6.4Registers and Grilles 2.9.7Louvers

2.11 GSplit System Heat Pump VRV

System SD-06 Test Reports

3.12 GPerformance Tests

3.10 GDamper Acceptance Test

SD-07 Certificates 1.4.1Bolts

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions 3.14.2Operation and Maintenance

Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

23 00 00 SD-10 Operation and Maintenance Data

3.14.1Operation and Maintenance Manuals

2.11.2 GDedicated Outdoor Air Unit

2.11 GSplit System Heat Pump VRV

System 23 05 93 SD-01 Preconstruction Submittals

1.3 GRecords of Existing Conditions

1.3.3 GRecords of Existing Conditions

1.5.3.1 GTAB Firm

1.2 GTAB team assistants

1.2 GTAB team engineer

1.5.3.2 GTAB Specialist

1.2 GTAB team field leader

3.3.2 GAdvance Notice of Pre-Final

DALT Field Work

1.6.1.2 GPre-Field DALT Preliminary

Notification SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 GEquipment and Performance

Data

1.5.3.4 GTAB Related HVAC Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

23 05 93 1.5.2 GTAB Procedures

1.5.2 GCalibration

1.3.3 GSystems Readiness Check

1.5.4 GTAB Execution

1.5.4.3 GTAB Verification

SD-06 Test Reports

1.6.1 GDALT and TAB Submittal and

Work Schedule

1.6.1 GDALT and TAB Submittal and

Work Schedule

1.3.3 GDesign review report

1.3.3 GDesign review report

1.6.1.1 GDesign review report

1.6.1.1 GDesign review report

1.6.1 GPre-Final DALT report

3.3.5 GPre-Final DALT report

1.6.1 GFinal DALT report

3.3.8 GFinal DALT report

1.5.5.2 GTAB report for Season 1

1.5.5.2 GTAB report for Season 2

1.5.3.1 GTAB Firm

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.6.1.3 GPre-field TAB engineering report

1.6.1 GAdvanced notice for Season 1

TAB field work

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

23 05 93 1.6.1 GPrerequisite HVAC Work Check Out List For Season 1

1.6.1 GAdvanced notice for Season 2

TAB field work

1.6.1 GPrerequisite HVAC Work Check

Out List For Season 2

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-04 Samples

2.2.1.3 GThermal Insulation

3.1.1 GDisplay Samples

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 09 23.13 20 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

23 09 23.13 20 1.4.1.1 GControl system drawings title sheet

1.4.1.2 GList of I/O Points

1.4.1.3 GControl System Components List

1.4.1.4 GControl system schematics

1.4.1.5 GHVAC Equipment Electrical

Ladder diagrams

1.4.1.6 GComponent wiring diagrams

1.4.1.7 GTerminal strip diagrams

1.4.1.8 GBACnet communication

architecture schematic SD-03 Product Data

2.1.1 GDirect Digital Controllers

2.1.2 GDDC Software

2.1.3 GBACnet Operator Workstation

2.1.3.3 GBACnet Operator Workstation

DDC Software

2.2 GSensors and Input Hardware

2.3 GOutput Hardware

2.4.2 GSurge and transient protection

2.5 GIndicators

2.6 GVariable frequency (motor) drives

SD-05 Design Data

3.4.2 GPerformance Verification Testing

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

23 09 23.13 20 3.4.4 GPre-Performance Verification Testing Checklist

SD-06 Test Reports

3.4.11 GPerformance Verification Testing

Report SD-07 Certificates

1.6.6 GContractor's Qualifications

SD-09 Manufacturer’s Field Reports

3.4.1 GPre-PVT Checklist

SD-10 Operation and Maintenance Data

1.4 GBACnet Direct Digital Control

Systems

3.3 GControls System Operators

Manuals

2.6.2 GVFD Service Manuals

SD-11 Closeout Submittals

3.5.1 GTraining documentation

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data

2.3Refrigerant Piping System 1.5.2Spare Parts

1.3.1 GQualifications

3.5 GRefrigerant Piping Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

23 23 00 3.4 GDemonstrations 3.1Verification of Dimensions

SD-06 Test Reports 3.5Refrigerant Piping Tests

SD-07 Certificates

2.1 GService Organization

SD-10 Operation and Maintenance Data

1.5Maintenance 3.4Operation and Maintenance

Manuals 26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

SD-03 Product Data

2.11 GReceptacles

2.12.3 GCircuit breakers

2.9 GSwitches

2.13 GManual motor starters

2.3 GCABLE TRAYS

2.20 GSURGE PROTECTIVE DEVICES

SD-06 Test Reports

3.4.2 G600-volt wiring test

3.4.4 GGrounding system test

3.4.3 GGround-fault receptacle test

SD-07 Certificates

2.10 GFuses

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

26 41 00 SD-02 Shop Drawings

1.4.1.1 GOverall lightning protection

system

1.4.1.2 GEach major component

SD-06 Test Reports

1.4.3 GLightning Protection and

Grounding System Test Plan

3.3.1 GLightning Protection and

Grounding System Test SD-07 Certificates

1.2.3 GLightning Protection System

Installers Documentation

1.4.2 GComponent UL Listed and

Labeled

3.1.1 GRoof manufacturer's warranty

26 51 00 SD-03 Product Data

2.1 GFluorescent lighting fixtures

1.5.1 GFluorescent electronic ballasts

2.1.2 GFluorescent lamps

2.5 GExit signs

2.6 GEmergency lighting equipment

2.7 GOccupancy sensors

27 10 00 SD-02 Shop Drawings

1.6.1.1 GTelecommunications drawings

1.6.1.2 GTelecommunications Space

Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

27 10 00 SD-03 Product Data

2.3 GTelecommunications cabling

2.4.5 GPatch panels

2.5 GTelecommunications

outlet/connector assemblies

2.4.2 GEquipment support frame

2.4.3 GConnector blocks

SD-06 Test Reports

3.5.1 GTelecommunications cabling

testing SD-07 Certificates

1.6.2.1 GTelecommunications Contractor

1.6.2.2 GKey Personnel

1.6.2.3 GManufacturer Qualifications

1.6.3 GTest plan

SD-09 Manufacturer’s Field Reports

2.9.1 GFactory reel tests

SD-10 Operation and Maintenance Data

1.10.1 GTelecommunications cabling and

pathway system

SD-11 Closeout Submittals

1.10.2 GRecord Documentation

28 31 76 SD-02 Shop Drawings

2.1.2 GNameplates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

28 31 76 2.15.9 GInstructions

3.2.1 GWiring Diagrams

1.4.1 GSystem Layout

2.3 GSystem Operation

2.20 GNotification Appliances

2.16 GAmplifiers

SD-03 Product Data

1.4.2 GTechnical Data And Computer

Software

2.14 GFire Alarm Control Unit and Mass

Notification Control Unit (FMCP)

2.17 GLCD, LED Display Unit (VDU)

3.2.2 GTerminal cabinets

2.19 GManual stations

2.23 GTransmitters

2.13.1 GBatteries

2.13.2 GBattery chargers

2.10 GSmoke sensors

2.11 GHeat detectors

2.20 GNotification appliances

2.7 GAddressable interface devices

2.16 GAmplifiers

2.16 GTone generators

2.16 GDigitalized voice generators

2.15 GRemote Fire Alarm/Mass

Notification Control Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

28 31 76 2.23.1 GRadio transmitter and interface panels

1.3 GLocal Operating Console (LOC)

SD-05 Design Data

2.13.1.2 GBattery power

2.13.2 GBattery chargers

SD-06 Test Reports 3.7Field Quality Control

3.7.1 GTesting Procedures

2.10.6 GSmoke sensor testing

SD-07 Certificates 1.6.1.4Installer 3.7.2.2Formal Inspection and Tests 3.7.2.3Final Testing

SD-09 Manufacturer’s Field Reports

2.3 GSystem Operation

1.6.2.2Fire Alarm/Mass Notification

System SD-10 Operation and Maintenance Data

1.8 GOperation and Maintenance

(O&M) Instructions

3.8Instruction of Government Employees

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

28 31 76 3.7.2.4As-Built Drawings 31 00 00 SD-01 Preconstruction Submittals

1.4.1.2 GDewatering Work Plan

SD-03 Product Data

3.5 GUtilization of Excavated Materials

SD-06 Test Reports

3.11 GTesting;

2.1 GBorrow Site Testing;

SD-07 Certificates

3.11 GTesting;

31 32 11 SD-01 Preconstruction Submittals 1.7Work sequence schedule 1.7Erosion control plan

SD-02 Shop Drawings 3.2.2Layout 3.2.4Obstructions Below Ground 3.2.2Erosion Control 2.5.3.1Seed Establishment Period 3.6Maintenance Record

SD-03 Product Data 2.2.2Geosynthetic Binders 2.1Recycled Plastic 2.3.3Wood Cellulose Fiber 2.3.4Paper Fiber 2.3.9Mulch Control Netting and Filter

Fabric

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

31 32 11 2.3.10Hydraulic Mulch 2.5.1Erosion Control Blankets Type VI 2.5.2Erosion Control Blankets Type IX 2.4Geotextile Fabrics 2.8Aggregate 1.3Equipment 3.1.1Finished Grade 2.5Erosion Control Blankets

SD-04 Samples 1.6Materials

SD-06 Test Reports 2.2.2Geosynthetic Binders 2.3.10Hydraulic Mulch 2.4Geotextile Fabrics 2.5Erosion Control Blankets 2.8Sand 2.8Gravel

SD-07 Certificates 2.3Mulch 2.3.10Hydraulic Mulch 2.4Geotextile Fabrics 2.2.2Geosynthetic Binders 2.2.1Synthetic Soil Binders 1.5.1Installer's Qualification 2.1Recycled Plastic 2.5.3Seed

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

31 32 11 2.3.8Asphalt Adhesive 2.3.11Tackifier 2.3.6Wood By-Products 2.3.3Wood Cellulose Fiber

SD-10 Operation and Maintenance Data

3.6.2Maintenance Instructions 32 05 33 SD-01 Preconstruction Submittals

2.4 GIntegrated Pest Management

Plan

SD-03 Product Data 1.6.1Local/Regional Materials

2.1 GFertilizer

2.2.1Hose 2.3Mulches Topdressing 2.3.2Organic Mulch Materials

SD-07 Certificates 3.4.1Maintenance inspection report

3.4.2 GPlant quantities

SD-11 Closeout Submittals 3.4.3Tree, staking and guying removal

32 16 13 SD-03 Product Data 2.1Concrete

SD-06 Test Reports 3.8Field Quality Control

32 93 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 47 PAGES

Addition/Renovation of 301st Life Support Building 1630

32 93 00 1.4.3State Landscape Contractor's License

1.6Time Restrictions and Planting Conditions

SD-03 Product Data 1.8.1Local/Regional Materials 2.3.8Composted Derivatives 2.7.2Organic Mulch Materials 2.3.9Gypsum

2.7 GMulch

2.8.1.2Ground Stakes 2.8.1.2Ground Stakes 2.9.1Hose 2.5Fertilizer 2.8.1Staking Material 2.8.7Metal anchors

1.4.4 GPhotographs

SD-04 Samples

2.7 GMulch

SD-06 Test Reports 1.4.1Topsoil composition tests 2.2.2Topsoil composition tests 1.4.5Percolation Test

SD-07 Certificates 1.4.2Nursery certifications 2.1.1Nursery certifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.