RFI_Responses_To_Be_Posted.pdf

PDF 101 KB Posted

Attached to
Building 1630 Renovation Federal contract opportunity
Solicitation number
FA667518R0002
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Other files attached to Building 1630 Renovation, newest first.
File Type Posted
Responses_To_Be_Posted-5.pdf PDF
Responses_To_Be_Posted-4.pdf PDF
Sheets_Referred_To_In_Responses_To_Be_Posted-4.pdf PDF
SUBMITTALS_REGISTER_-_Revised.pdf PDF
Table_of_Contents.pdf PDF
FA6675-18-R-0002_B1630_Amendment__2.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_EFIS_System_Spec_07_24_00_(Revised).pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_COMM_Drawings.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Concrete_Joint_Spec_05_72_00.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Spec_03_35_43_Polished_Concrete.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_-_Specifications_(Revision__4).pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Demolition_Specification_02_41_00.pdf PDF
FA6675-18-R-0002_B1630_Amendment__3.pdf PDF
RFI_Responses_To_Be_Posted-3.pdf PDF
RFI_Responses_To_Be_Posted-2.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_EFIS_System_Spec_07_24_00_(Revised).pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_-_Specifications_(Revision__4).pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Spec_03_35_43_Polished_Concrete.pdf PDF
SUBMITTALS_REGISTER_-_Revised.pdf PDF
FA6675-18-R-0002_B1630_Amendment__2.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_COMM_Drawings.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Concrete_Joint_Spec_05_72_00.pdf PDF
Table_of_Contents.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Demolition_Specification_02_41_00.pdf PDF
RFI_-RFC_FORM.pdf PDF
Site_Visit_Sign-in_Sheet_-_20180327.pdf PDF
FA6675-18-R-0002_B1630_Amendment__1.pdf PDF
ATT12-1630_-_DDPM_120002_-_Concrete_Joint_-_Spec_05_72_00.pdf PDF
ATT7-Wage_Determinations_-_1-12-2018.pdf PDF
ATT4-B1630_Comm_Line_Relocate_Drawings.pdf PDF
ATT14-RFI_Form.pdf PDF
ATT1-B1630_A&E_Dev_Specs_-_Addition_Renovation.pdf PDF
ATT11-RFI_Clarifications.pdf PDF
ATT15-SF24_Bid_Bond_Blank_Form.pdf PDF
ATT6-B1630__Basis_of_Design_-_Comm_Line_Relocate.pdf PDF
ATT8-Asbestos_Report_F5A6CE7363AW01_B1630_RENOVATE_LIFE_SUPPORT.pdf PDF
ATT5-B1630_Basis_of_Design_-_Addition_Renovation.pdf PDF
ATT10-95145107-Geotech_Report.pdf PDF
ATT2-B1630_A&E_Dev_Specs_-_Comm_Line_Relocation.pdf PDF
FA667518R0002_B1630_Solicitation.pdf PDF
ATT9-B1630_Lead_Based_Paint_Report.pdf PDF
ATT13-Spec_03_35_43_Polished_Concrete.pdf PDF
ATT3-B1630_Renovation_Drawings.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

There are no Specifications for the New Wood Doors and the Hollow Metal Frames call for on the Door Schedule on Sheet A-602

The doors listed on Sheet A-602 shall match the partition STC ratings listed on Sheet A-100.

A previously submitted RFI regarding proposal submission indicated that electronic submissions were / are acceptable. Please confirm this is correct. If so, are we requried to submit hard copies as well? Also, confirm any email attachemetn size limitations and to whom the electronic submisison should be directed to.

Proposal Submission

Submit one paper AND one electronic (Email attachment or CD in Word or .pdf format) Limit email file size to 3 MB. See solicitation for additional details.

Submit proposals to: Robert Walz And RobertStaley 301st CONF/PK 301st CONF/PK 1776 Carswell Ave 1776 Carswell Ave NAS Fort Worth JRB, TX 76127 NAS Fort Worth JRB, TX 76127 robert.walz.1@us.af.mil robert.staley@us.af.mil

The RFP did not identify the need for government required temporary faciliites typically included in section 01 50 00. Please confirm any requri temporary facilities required by the government.

The Government does not require temp facilities be provided in conjunction with this project.

The RFP did not identify requirements for base access. It was noted a tthe site visit that Rapid Gate will no longer be used at Ft Woth NAS JRB. Confirm base access requirements, procedures and durations of pass.

Post-award base access will be administered through the use of the Form NASFTWJRB 5530/18.

This enables the Contractor to sponsor their employees and subcontractors access to the Base in accordance with NASJRB Fort Worth policies. This form will be provided by the Contracting office.

The RFP did not identify requirements for as built drawings. Are they required? if so in what format?

As-Built drawings are required, in the following formats:

1 AutoCAD file 2012 or later version 1 Printed size B-11x17 1 Printed size E-34x44 1 Binder containing all warranty documentation and appliance data

The RFP did not identify LEED requirements. Is a LEED certification required? If so what level?

LEED certification is not required.

Specification sections 09 29 00 page 8 paragraph 23.4 and 3.4.1 call for level 5 drywall finish. Confirm if this is required.

Level 5 drywall finish is required where called for in the specifications.

Sheet CI102 genereal note #17 notes that the gas line work is to be completed by the privatized utility and coordinated with the government.

Confirm if the cost of this work is to be included in the Contractor's scope/bid or will this be excluded from our contract?

The cost of the gas line work is to be included in the Contractor's scope/bid.

Confirm specific project documentation / submittal transfer software or protocol. Will RMS / QCS be used?

See notes above regarding submission guidelines and As-Built submissions.

See Submittals Register for specific required documentation/submittals.

Please clarify the set-aside for this contract (Total Small Business, HUBZone, SDVOSB, etc.)

Please refer to the Solicitation posted on FedBizOpps for this requirement.

We want to confirm that a Prime / Sub Team can submit a proposal.

If yes, will a Teaming Agreement be required in the proposal?

If yes, can the Teaming Agreement be placed in the Price Proposal outside of the 20-page limit?

Yes, a Prime/Sub Team can submit a proposal.

A Teaming Agreement is not required as part of the Price Proposal.

If you do decide to include a Teaming Agreement, it can be placed outside of the 20-page limit.

It shows that both Price and Technical proposals are required in an electronic file (.pdf, email).

Please clarify who this is to be emailed to and their email address and we want to confirm that no CD is required.

Submit proposals to: Robert Walz And RobertStaley

301st CONF/PK 301st CONF/PK 1776 Carswell Ave 1776 Carswell Ave NAS Fort Worth JRB, TX 76127 NAS Fort Worth JRB, TX 76127 robert.walz.1@us.af.mil robert.staley@us.af.mil

I need to have clarification on the receipt of the RFP. I am reading it as we are to submit a Hard

Copy via FEDEX, Hand Delivery etc. And also provide an Emailed copy as well of the RFP as well?

Submit one paper AND one electronic (Email attachment or CD in Word or .pdf format) Limit email file size to 3 MB. See solicitation for additional details.

Submit proposals to: Robert Walz And RobertStaley 301st CONF/PK 301st CONF/PK 1776 Carswell Ave 1776 Carswell Ave NAS Fort Worth JRB, TX 76127 NAS Fort Worth JRB, TX 76127 robert.walz.1@us.af.mil robert.staley@us.af.mil

Need to confirm that rooms 113, 114, 118, 120, 121, 122, & 123 are all polished concrete and the others are to be just cleaned and sealed?

Also it mentions the color black. Is that correct? Is there more information that color?

1. According to Sheets I-101 & A-601, Rooms 113, 114, 116, 120, 121, 122 and 123 will receive a polished concrete surface. This includes cleaning, prepping and sealing.

2. Rooms 101, 104-109, 111, 112, 116, 117 and 119 shall receive 24" x 24" Carpet Tile.

3. Rooms 101A, 102, 103 and 110 shall receive 12" x 12" Porcelain Tile.

4. Break Room 115 shall receive 18" x 18" Porcelain Tile.

5. There will not be any black flooring colors for this project.

Is the existing conduit from the transformer to the building to be replaced?

Yes. Demolish existing conduit in accordance with (ES101, DE1) and new conduit installed.

Please advise us if the existing physical fitness equipment near the existing packaged unit will be removed/reinstalled by others, or if the contractor will be responsible for removal and reinstallation? The physical equipment appears to be in conflict with new utilities and concrete sidewalks.

Fitness equipment will be removed by others and is not part of this contract.

What city does the permit get pulled , reviewed and approved by?

Has the AE submitted the design drawings for review?

Permits will be issued by NAS Fort Worth JRB. This design has been approved.

Large Landscape Stones note to be relocated; to where?

Stones relocation will be on the Installation, but exact location is yet to be determined.

Amendment 001 states that the copper voice backbone cable for building 1630 is no longer required. Please advise us if any changes will be made to sheets ED101 and ES101 under the Communication Line Relocation set addressing the copper telephone cable for buildings 1637, 163A, and 1628.

See Amendments for required to changes in Communication Lines. Sheets will not be revised to reflect the removal of the requirement for copper lines.

Amendment 001 states only data cables are required since now they are VOIP.

Please clarify if the same number of cables will be required per drop. For example: per the plans each drop received 2 voice and 2 data, so is the intent for these drops to receive 4 data cables instead per the amendment?

Amendment 001 removes the requirement for copper voice cable. It does not increase the number of data drops required.

Per the RFI Clarifications issued with the solicitation: Clarification of Division 01 Specifications (2) states the Contractor QC person can also take the role as the Site safety and health officer (SSHO) and that the project shall include a Project Manager, Site Superintendent and a Quality Control Representative. Please advise us if one qualified person can hold the position of Site Superintendent/SSHO/QC Manager for this project, or the Government is requiring two separate individuals for these positions.

The Quality Control (QC) can be the SSHO for this project; however, the QC CANNOT also be the superintendent.

Per the RFI Clarifications issued with the solicitation: Clarification of Division 01 Specifications (3) states the following specifications were added to the master specification book: 10 50 00, 10 78 23, and 01 91 00.00 37. Please advise us if these specifications will be provided, otherwise if these are to be provided after award, please advise us if the Contractor is required to hire a 3rd party Commissioning agent or if Commissioning will be required for this project.

See Amendment 002 for added specifications.