Additional Responses to Received RFIs

View the file

Other files for this federal contract opportunity

Other files attached to Building 1630 Renovation, newest first.
File Type Posted
Responses_To_Be_Posted-4.pdf PDF
Sheets_Referred_To_In_Responses_To_Be_Posted-4.pdf PDF
SUBMITTALS_REGISTER_-_Revised.pdf PDF
Table_of_Contents.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_COMM_Drawings.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Concrete_Joint_Spec_05_72_00.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Spec_03_35_43_Polished_Concrete.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_-_Specifications_(Revision__4).pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Demolition_Specification_02_41_00.pdf PDF
FA6675-18-R-0002_B1630_Amendment__2.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_EFIS_System_Spec_07_24_00_(Revised).pdf PDF
FA6675-18-R-0002_B1630_Amendment__3.pdf PDF
RFI_Responses_To_Be_Posted-3.pdf PDF
RFI_Responses_To_Be_Posted-2.pdf PDF
RFI_Responses_To_Be_Posted.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_EFIS_System_Spec_07_24_00_(Revised).pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_-_Specifications_(Revision__4).pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_COMM_Drawings.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Concrete_Joint_Spec_05_72_00.pdf PDF
Table_of_Contents.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Demolition_Specification_02_41_00.pdf PDF
FA6675-16-R-0007_LIFE_SUPPORT_Spec_03_35_43_Polished_Concrete.pdf PDF
SUBMITTALS_REGISTER_-_Revised.pdf PDF
FA6675-18-R-0002_B1630_Amendment__2.pdf PDF
RFI_-RFC_FORM.pdf PDF
Site_Visit_Sign-in_Sheet_-_20180327.pdf PDF
FA6675-18-R-0002_B1630_Amendment__1.pdf PDF
ATT12-1630_-_DDPM_120002_-_Concrete_Joint_-_Spec_05_72_00.pdf PDF
ATT7-Wage_Determinations_-_1-12-2018.pdf PDF
ATT4-B1630_Comm_Line_Relocate_Drawings.pdf PDF
ATT14-RFI_Form.pdf PDF
ATT15-SF24_Bid_Bond_Blank_Form.pdf PDF
ATT6-B1630__Basis_of_Design_-_Comm_Line_Relocate.pdf PDF
ATT8-Asbestos_Report_F5A6CE7363AW01_B1630_RENOVATE_LIFE_SUPPORT.pdf PDF
ATT5-B1630_Basis_of_Design_-_Addition_Renovation.pdf PDF
ATT10-95145107-Geotech_Report.pdf PDF
ATT2-B1630_A&E_Dev_Specs_-_Comm_Line_Relocation.pdf PDF
FA667518R0002_B1630_Solicitation.pdf PDF
ATT9-B1630_Lead_Based_Paint_Report.pdf PDF
ATT13-Spec_03_35_43_Polished_Concrete.pdf PDF
ATT3-B1630_Renovation_Drawings.pdf PDF
ATT1-B1630_A&E_Dev_Specs_-_Addition_Renovation.pdf PDF
ATT11-RFI_Clarifications.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

On Sht. AD201 it says to remove standing seam metal roof in its entirety. Does this include the metal decking that is supporting it?

Existing standing seam metal roof is supported directly over existing purlins. There is no metal decking supporting the existing roof. Contractor to remove existing standing seam metal roof with the purlins to remain as indicated in the structural drawings.

Provide metal deck to support new standing seam metal roof as well as fasten the new framing to the existing purlins as indicated in structural drawings (i.e. section C1/S-302).