SUBJECT: Project DDPM 130004/A - Building 1656 - Renovate/Construct Addition to the Fuels Maintenance Dock Attachment 1: Clarifications & Adds
1. For Project DDPM 130004/ A to Renovate/Construct Addition to the B 1656 Fuels Maintenance Dock, the following minor clarifications and adds were noted on the A&E Basis of Design, Specifications and Plans:
Correction to Sheet A202 note A 75 that indicates stainless steel sinks. The correct sink material is white vitreous china. Please follow the 22 00 00 specifications for the white vitreous china, self-rimming sinks. See paragraph 2.4.6. Counter-top Lavatories.
Clarification of Sheet AD 101, Demolition Keynote 4. The intention for Room 112 is to remove the sink only and the wall, floor and ceiling are to remain. The walls are to be painted.
Clarification of a polished floor specification. The actual specification for a Polished Concrete Floor System is Section 03 35 43. Please follow this specification for all polished floors indicated on the plans.
Clarification of Sheet AD 101, Demolition Keynote 4. Demolition in Room 112 should only include the sink. New wall paint will be provided over existing.
Clarification of Sheet CDlOl Construction Sequence No. 9. The Contractor shall plan to temporarily water the new sod until established. Once established, the Contractor shall remove the temporary sprinkler system. Permanent irrigation systems are not permitted here at NAS Fort Worth JRB, TX.
Clarification of Specification Section 01 45 00.10 20. The Quality Control (QC) can be the SSHO for the project; however, the QC cannot also be the superintendent. Strike out specification 01 45 00, Section 1.5.
a) Clarification of Sheet MD101, Keynote DMI I. The demolition of sidewall louvers is incorrect and shall be removed.
b) Clarification of Sheet A201, Keynote A 78. The existing louvers are to remain in place and repainted.
Basis of Design: Square footage adds for Basis of Design, page 3, paragraph 2. "The project consist!
of three main portions; a 1580 SF addition to the existing Building 1656, a major renovation of 900 SF of existing office/restrooms and minor interior renovations of the remaining 10,400 SF of the facility."
File details come from the government source that posted it.