CopperPlantUpgrade Site Visit QA -10 Aug 2020-C.docx

DOCX document 13 KB Posted

Attached to
Copper Plant Upgrade Federal contract opportunity
Solicitation number
FA667020B0001
Issued by
Department of the Air Force Reserve Command

About this file

This solicitation notice is for a copper plant upgrade project at Niagara Falls Air Reserve Station. The Department of the Air Force Reserve Command seeks a woman-owned small business contractor to furnish all labor, materials, equipment, and supervision required to replace aging copper cable with new fiber optic cable. The project scope includes directional boring, fiber optic pulling, splicing, testing, and open-pit trenching to install new conduit and fiber optic cable between buildings on base. The solicitation anticipates a single firm-fixed price contract with a period of performance of 180 days from notice to proceed. The estimated value is between $500,000 and $1,000,000. The solicitation documents are available electronically only on SAM.gov with responses due prior to a September 30, 2020 award subject to availability of funds. Electronic submissions and questions are not permitted, and attendance at an August 5th site visit is encouraged.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Section 2.1.1.6.1.8 indicates (10x) the size of the duct: 4” = 40”. 36” and 48” are the standard radiuses seen. Can you confirm if this was an error and 36” is allowable? The 48” 90 bend for the riser at the building will increase the depth at the building and are much more expensive then 36” radius.

0. Please adhere to industry standards

1. SOO page 26 states to provide the size of the laydown area required. Section L does not require any technical information within the proposal. Where in the proposal would you like for us to provide the size of the laydown area?

1. Please disregard this requirement, Contractors are NOT required to submit any technical information for the laydown area.

1. Are electronic submissions of the bid authorized for this project?

2. No, electronic submissions are NOT authorized.