Attachment 6 - SWPPP_template.pdf

PDF 84 KB Posted

Attached to
Copper Plant Upgrade Federal contract opportunity
Solicitation number
FA667020B0001
Issued by
Department of the Air Force Reserve Command

About this file

This solicitation notice seeks proposals for a firm fixed price contract to upgrade a copper plant to fiber optic cable at Niagara Falls Air Reserve Station. The project includes directional boring, fiber optic pulling, splicing and testing as well as open-pit trenching to install conduit for fiber optic cable installation. Work is to be completed within 180 days of notice to proceed. The contract value is estimated between $500,000 and $1,000,000. Responses are due through the System for Award Management and the solicitation is set aside 100% for woman-owned small businesses. The Department of the Air Force Reserve Command will evaluate proposals and anticipates awarding a single contract.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION SWPPP / E&S PLAN

Project Name

Contract Number Date

1.0 GENERAL INFORMATION:

Design/Layout of E&S control by: ADD Inspection/Monitoring by: ADD Installation of E&S Control by: ADD

2.0 PROJECT DESCRIPTION:

[This section is a description of the construction project: what is being built, what is the extent of excavation, etc. A location map showing the location of the project should also be presented.

Include any off-site soil storage or deposit locations. ]

3.0 SOILS:

[The types and percentages of soils present at the project site should be described and shown on a map.]

4.0 TOPOGRAPHY AND DRAINAGE:

[The bulk of this section is a topographic map of the project site that includes surface waters, project boundaries, roadways, etc. The scale of the map should be one inch equals 100 feet or less with two-foot contour intervals. This section must also show what the final alterations to the site will look like upon project completion. The topographic map is typically used as a starting point to show the new, post-construction contour lines.]

5.0 STAGING OF EARTH MOVING ACTIVITIES:

[A schedule and timeline of staging activities, as well as other E&S control measures, must be provided in this section.]

6.0 STORMWATER MANAGEMENT:

[The quantity of runoff from the project site must be determined in this section in order to properly design the correct E&S and stormwater management controls.]

7.0 POLLUTION PREVENTION:

[Provide a description of the measures to control litter, construction chemicals, and construction debris from becoming a pollutant source in the stormwater.]

8.0 TEMPORARY E&S CONTROL MEASURES:

[All temporary erosion control measures to be used at the site must be described and their locations shown on a map. Including any off-site soil storage or deposit locations.]

9.0 PERMANENT E&S CONTROL MEASURES:

[All permanent erosion control measures to be used at the site must be described and their locations shown on a map. Also, stabilization techniques to be used upon project completion must be presented. Including any off-site soil storage or deposit locations.]

10.0 INSPECTION AND MAINTENANCE PROGRAM FOR E&S CONTROL MEASURES

[An inspection and maintenance program for the project site must be identified in this section.

This section ensures that pollution prevention and E&S measures are operating correctly. The results from these inspections can result in modifications to the stormwater controls and changes to the Plan. Documentation of the inspections is required.]