Attachment 8 - Dewatering GW Discharge Log.pdf
PDF 129 KB Posted
- Attached to
- Copper Plant Upgrade Federal contract opportunity
- Solicitation number
- FA667020B0001
About this file
This notice solicits proposals for a firm fixed-price construction contract to upgrade the copper cable plant at Niagara Falls Air Reserve Station, New York. The project scope includes replacing degrading copper cable with new fiber optic cable through directional boring, pulling, splicing, testing, and trenching to install conduit. Work will be performed at the 914th Air Refueling Wing and is set aside exclusively for woman-owned small businesses. The performance period is 180 calendar days from notice to proceed with liquidated damages specified in the solicitation. Electronic submissions will not be accepted. The estimated budget is between $500,000 and $1,000,000. Payment and performance bonds are required. An organized site visit will take place on August 5, 2020 and the solicitation will be available on SAM. Proposals are due by September 30, 2020 or upon available funding.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419.pdf | ||
| Sol Amend FA667020B00010001.pdf | ||
| CopperPlantUpgrade Site Visit QA -10 Aug 2020-C.docx | DOCX document | |
| Attachment 3 - Davis Bacon_NY20200011_H and H.pdf | ||
| CopperPlantUpgrade Site Visit QA -10 Aug 2020.pdf | ||
| Copper Plant Upgrade Site Visit Sign In Sheet.pdf | ||
| Attachment 6 - SWPPP_template.pdf | ||
| Attachment 4 - Insurance Cert.pdf | ||
| Attachment 7 - Ltr for Disposal of Excess Soil.pdf | ||
| Attachment 2 - Enviro Management Protection.pdf | ||
| Solicitation - FA667020B0001.pdf | ||
| Attachment 3 - Davis Bacon_NY20200011_H and H.pdf | ||
| Attachment 5 - EAL - Ctr template.pdf | ||
| Attachment 1 SOO_Copper Plant Upgrade.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dewatering Groundwater Discharge Log, Niagara Falls ARS
DATE:____________________(month and year)
PROJECT:______________________________ (number and name)
COMPANY:_____________________________(name)
Groundater discharges to the ground surface at Niagara Falls ARS are regulated by NYSDEC SPDES Permit GP-0-12-001.
Groundwater contained in manholes/excavations can be discharged to the ground surface ONLY if uncontaminated.
Dewatering personnel shall visually inspect groundwater in manhole/excavation prior to discharge and follow instructions below.
Groundwater shall not be discharged directly to storm or sanitary sewer.
No
Yes
Date Location Street Closest Bldg
Sheen, Foam, Odor?
(Yes/No) Time of
Discharge Personnel Name Example:
1 Oct 10 MH-1 Kirkbridge Dr 800 No 0800-0815 John Smith
Comments:
***Submit a copy of this log to CEV on a monthly basis and at end of project Last Updated: March 2014
Is there a visible sheen, foam, odor, or other pollutant?
Mark Yes or No in box below
Release Uncontaminated Groundwater (to ground surface)
Contact CEV @ x 3123 or x 3124
Dewatering
File details come from the government source that posted it. Updated .