POL Price Sheet.pdf
PDF 144 KB Posted
- Attached to
- Pickle POL Lines
- Solicitation number
- FA6670-10-Q-0039
About this file
POL Price Sheet 13 July 2010
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
914th Airlift Wing Niagara Falls, Air Reserve Station
Niagara Falls, NY 14304
Price Sheet for Pickle POL Lines
Cost of project to incude the following without filling lines with nitrogen gas $_____________________
The work to be accomplished by the contractor shall include, but not be limited to, the following items:
- The emptying/removing of JP-8 from a hydrant system loop and a transfer line.
- Empty and gas free entire pipe lines. The Contractor is responsible for reclaiming all fuel contained within the pipe lines. All residual/waste product/sludge and wash water shall be properly disposed of by the Contractors qualified personnel or sub-contractors in accordance with all current state and federal requirements for proper manifesting, handling, transporting, and disposal of hazardous waste.
Contractor shall:
- Drain, clean (pig) and vapor free the fuel system piping. All fuel will be reclaimed by pushing fuel into the 107 th aboveground tanks directly from the piping or by offloading directly into the
Government’s fuel tanker trucks with the use of the Contractor’s own pumping equipment.
- Drain the 6” transfer line (approximately 1 mile in length) by pigging the line. Using pig launchers from the 914th end of the system, push fuel into one of the 107th aboveground fuel tanks.
- Drain the hydrant loop (approximately 0.5 miles in length) at a low point drain or remove a hydrant control valve at the lowest part of the system and install a 4” flange with 2” kamlock to remove all fuel using a contractor provided pump into a tanker truck. All fuel from the tanker shall be delivered to the 914 th POL and offloaded by the POL operator(s). At the 107 th end, disconnect transfer line in the pump-house; cap/blind flange each open end. The blind flanges shall be painted to match the existing piping color, within the 107 th POL pump house.
- At the 914 th end, the contractor shall disconnect the transfer line from the tee connection prior to the filter separator (located in the pump house) and place a blind flange at that tee connection point. Paint the blind flange to match the existing pipe color, within the 914 th POL pump house.
OPTIONAL ITEM
Cost of filling lines with nitrogen gas $_____________________
- Fill the entire transfer and hydrant fuel pipe lines with nitrogen gas once the fuel is evacuated from the fuel pipelines.
File details come from the government source that posted it. Updated .