R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The Purpose of This Amendment Is: The purpose of this amendment is to Clarify, Add-To, Delete- From, or Change the requirements of the previously issued specifications, drawings, and addendums.

This addendum supplements and amends the original bid documents and shall be taken into account in preparing proposals and shall become a part of the contract documents. Bidders shall update their Bidding Documents with the information contained in this Addendum.

1. The previous telecommunication drawings T-110 through T-512 are replaced with attached drawings T-110, T-111, T-510, T-511 and T-512.

2.The specification 27 05 00 is replaced with attached specification 27 05 00 -R.

3. Specification 28 24 10 is added per this addendum.

4. The electrical drawings Attached E - 210 and E - 241 are revised.

5. The UPS system for the Telecommunication rack in room 121 only will be provided by the owner, however contractor will install and ensure that Rack's operation with UPS back up power. The UPS for Telecom Training Room Rack in room 124 is included in the scope of work and has to be provided by the contractor.

6. The Contractor shall provide complete Audio Visual and CCTV systems that are in the scope of work as per plans and specifications. The owner will only provide monitors; however, the contractor shall mount/install monitors, provide power, HDMI connection and cables and connect them to Telecom Training Room Rack and test them for satisfactory operation.

7. The building has backbone Fiber service now; the owner will replace exiting fiber and bring new 12 strand single mode fiber under separate contract using existing path. However, the new fiber that owner brings will use cable tray provided by the contractor under this contract, the contractor shall coordinate with COTR (Contracting Officer's Technical Representative) and save the existing path and entrance during demolition.

See Addendum 01 for details.

Section B - Supplies or Services & Prices or Costs

Section J - List of Attachments

The following attachments were added:

ADDENDUM 01 - ZQEL 15-0005BC

FA665619BA0010002

STAR CONSULTANTS, INC

ARCHITECTS & ENGINEERS

d e s i g n | s t r a t e g y | v i s i o n

1910 Crown Park Court, Columbus, Ohio 43235 Phone: 614.538.8445 | Fax: 614-538.8446 star@starconsultants.org

CONTRACT NO: ZQEL 15-0005B/C

PROJECT: Renovate Combat Arms Training and Maintenance (CATM) B-530

ADDENDUM NUMBER ONE (1)

ISSUED: 5 March 2019

ADDENDUM TO PLANS and SPECIFICATIONS FOR:

PROJECT: ZQEL 15-000B/C RENOVATE CATM B-530 910th AIRLIFT WING 3976 King Graves Road, Youngstown Regional Airport Vienna, Ohio 44473-5931

Prepared by: Star Consultants, Inc.

1910 Crown Park Ct.

Columbus, Ohio 43235

(614) 538-8445 Fax (614) 538-8446

This Addendum is included in the work as noted in the Notice to Bidders and Form of Proposal.

Each item refers to drawing sheet numbers or specification page numbers, or general comments.

The following supplements Clarify, Add To, Delete From, or Change the requirements of the previously issued specifications, drawings, and addendums.

To All Bidders: This addendum supplements and amends the original bid documents and shall be taken into account in preparing proposals and shall become a part of the contract documents. Bidders shall update their Bidding Documents with the information contained in this Addendum.

1.0 The previous telecommunication drawings T-110 through T-512 are replaced with attached drawings T-110, T-111, T-510, T-511 and T-512.

2.0 The specification 27 05 00 is replaced with attached specification 27 05 00 -R.

3.0 Specification 28 24 10 is added per this addendum.

4.0 The electrical drawings Attached E - 210 and E - 241 are revised.

5.0 The UPS system for the Telecommunication rack in room 121 only will be provided by the owner, however contractor will install and ensure that Rack’s operation with UPS back up power. The UPS for Telecom Training Room Rack in room 124 is included in the scope of work and has to be provided by the contractor.

6.0 The Contractor shall provide complete Audio Visual and CCTV systems that are in the scope of work as per plans and specifications. The owner will only provide monitors;

however, the contractor shall mount/install monitors, provide power, HDMI connection and cables and connect them to Telecom Training Room Rack and test them for satisfactory operation.

7.0 The building has backbone Fiber service now; the owner will replace exiting fiber and bring new 12 strand single mode fiber under separate contract using existing path.

However, the new fiber that owner brings will use cable tray provided by the contractor under this contract, the contractor shall coordinate with COTR (Contracting Officer’s Technical Representative) and save the existing path and entrance during demolition.

Attachments:

1. E-210 Electrical Power Plan

2. E-241 Electrical Panel Schedules

3. T-110 Telecommunications Plan

4. T-111 Telecommunications Plan Training Area

5. T-510 Telecommunications Details

6. T-511 Telecommunications Details

7. T-512 Systems Details

8. Specification Section 270500-R Common Work Results for Communications

9. Specification Section 282410 Training Room Telecommunication System

END OF ADDENDUM (1)

WP/GF

E-210ELECTRICAL POWER PLAN

PJT #: ZQEL 16-0009B/C STAR: 17002-B/C

DRN. BY:

DGN. BY:

REV. BY:

SHEET

DATE REMARKS

REVISIONS

REV#

1910 Crown Park Ct.. Columbus, OH 43235 Tel: 614.538.8445 Fax: 614.538.8446 www.starconsultants.org

OF 92

DEPARTMENT OF THE AIR FORCE (ZQEL 16-0009B/C)

RENOVATE AND CONSTRUCT ADDITION TO MEDICAL FACILITY (B217)

910TH AIRLIFT WING, 3976 KINGS GRAVE ROAD

YOUNGSTOWN WARREN REGIONAL AIRPORT, VIENNA, OHIO 44473

DATE: 9/20/2017 FINAL 6/6/2017

3-5-191 ADDENDUM #1 TELECOMMUNICATIONS UPDATE

AutoCAD SHX Text

S

GF

J

BREAK

OFFICE

ROOM

COMPUTER TRAINING

OPEN

VESTIBULE

MECHANICAL

RISER

SPRINKLER

A/V

CORRIDOR

CLASSROOM

TRAINING ROOM

PHASE I

COPY RM

JANITOR

STORAGE

WOMEN

MEN

TELECOM

FIRE ALARM CONTROL PANEL

FT

FA

F

H

WP

WP

BSB

VRV-12

VRV-13

VRV-2

VRV-3

VRV-1

VRV-8

VRV-6

VRV-5

VRV-4

DOAS-1

DH-1

EF-1

VRV-11

VRV-7

EF-2

VRV-9

VRV-10

CUH-1

TF-1

EF-3 EXISTING TO REMAIN

UH-1 EXISTING TO REMAIN

ACCU-1

CU-1

B

E-210

SERVICE TRANSFORMER PAD MOUNTED, OIL FILLED, NEW.

M

PANEL A 208/120V-3 , 4W

PANEL C 208/120V- 3 , 4W

C-4

C-10,12

C-14

C-8

C-2

C-5

B-11

B-13

B-14

B-15

B-17

B-19

A-21

B-22

B-26

B-42

B-23

B-24

A-6,8

A-2,4

C-13,15

C-7,9

C-16

A-12

A-25,27,29

A-20,22,24

A-7,9,11

A-26

B-10

B-12

B-4

B-2

B-18

A-28

A-30

B-26

B-30

B-34

B-38

B-28

B-32

B-36

PANEL A 208/120V-3 , 4W

PANEL B 208/120V-3 , 4W

TYPICAL OF 4

WH-1

B-31

C

E-210

C-17

B-20

VRV-14

BSB2

V

D

C-19

C-17

C-18

C-20

C-24

C-22

C-28

C-26

EF-6

BREAK

VRV-10

C-5

C-13,15

C-18

C-20

C-24

C-22

C-28

C-26

EF-6

A

1/4" = 1'-0"

ELECTRICAL POWER PLAN

CRZ

DP

GENERAL NOTES 1. CONDUCTORS USED FOR GENERAL PURPOSE BRANCH CIRCUIT RECEPTACLES 0'-0" TO 68'-0" IN LENGTH CONDUCTORS USED FOR GENERAL PURPOSE BRANCH CIRCUIT RECEPTACLES 0'-0" TO 68'-0" IN LENGTH SHALL BE 2-#12 + #12 GRD-3/4" CONDUIT. CIRCUIT LENGTHS FOR GENERAL PURPOSE BRANCH CIRCUIT RECEPTACLES EXCEEDING 68'-0" SHALL BE 2-#10 + #10 GRD - 3/4" CONDUIT. 2. GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLES SHALL BE WIRED TO PROTECT ONLY THE DEVICE GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLES SHALL BE WIRED TO PROTECT ONLY THE DEVICE INDICATED. 3. ALL NEW FACEPLATES FOR NEW POWER WIRING DEVICES SHALL BE WHITE. ALL NEW FACEPLATES FOR NEW POWER WIRING DEVICES SHALL BE WHITE. 4. PROVIDE 20A/1P, 120V DISCONNECT SWITCHES FOR ALL EXHAUST FANS. PROVIDE 20A/1P, 120V DISCONNECT SWITCHES FOR ALL EXHAUST FANS. 5. PROVIDE 20A/2P, 208V DISCONNECT SWITCHES FOR ALL VRV'S. PROVIDE 20A/2P, 208V DISCONNECT SWITCHES FOR ALL VRV'S. 6. ALL CEILING MOUNTED AMBER STROBES AND ALL CEILING MOUNTED SPEAKERS ASSOCIATED WITH SIGCOM ALL CEILING MOUNTED AMBER STROBES AND ALL CEILING MOUNTED SPEAKERS ASSOCIATED WITH SIGCOM MASS NOTIFICATION SYSTEM SHOWN ON THIS PLAN ARE RELOCATED UNLESS INDICATED AS NEW. 7. ALL VOICE AND ALL DATA OUTLET LOCATIONS ARE SHOWN FOR REFERENCE. REFER TO SHEET E2.2 FOR ALL ALL VOICE AND ALL DATA OUTLET LOCATIONS ARE SHOWN FOR REFERENCE. REFER TO SHEET E2.2 FOR ALL VOICE AND DATA REQUIREMENTS. 8. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING. UNDERGROUND OBSTRUCTIONS, THE ELECTRICAL CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING. UNDERGROUND OBSTRUCTIONS, UTILITIES, DUCTS AND PIPING PRIOR TO DIGGING IN ANY AREA AND ORDINATE ALL NEW WORK WITH EXISTING ITEMS. 9. THE ELECTRICAL CONTRACTOR SHALL INCLUDE IN HIS COST FOR BID THE AID IN CONSTRUCTION COSTS FROM THE ELECTRICAL CONTRACTOR SHALL INCLUDE IN HIS COST FOR BID THE AID IN CONSTRUCTION COSTS FROM OHIO EDISON TO REPLACE THE EXISTING SERVICE TRANSFORMER. 10. COORDINATE ALL WORK ASSOCIATED WITH SERVICE TRANSFORMER WITH OHIO EDISON. OUTAGES WILL REQUIRE COORDINATE ALL WORK ASSOCIATED WITH SERVICE TRANSFORMER WITH OHIO EDISON. OUTAGES WILL REQUIRE COORDINATION AND APPROVAL FROM OHIO EDISON. THE ELECTRICAL CONTRACTOR SHALL VERIFY ALL REQUIREMENTS WITH OHIO EDISON PRIOR TO INSTALLATION AND MAKE ALL NECESSARY PROVISIONS FOR METERING AND UTILITY UTILITY UTILITY CONNECTIONS ON THE SECONDARY. THE ELECTRICAL CONTRACTOR SHALL PROVIDE METER BASE, SOCKET, AND TRIM IN ACCORDANCE WITH OHIO EDISON REQUIREMENTS. THE ELECTRICAL CONTRACTOR SHALL COORDINATE HIS WORK TO BE A MINIMUM DISRUPTION TO THE OWNER AND RECEIVE PRIOR WRITTEN APPROVAL BEFORE ANY OUTAGE.

SCALE: 1/4" = 1'-0"

TELECOMMUNICATIONS ROOM

NTS

KITCHEN ROOM

THESE RECEPTACLES SHALL BE #13-USB-20R-TR OR APPROVED SIMILAR FOR USB CHARGING FOR EMPLOYEE CONVENIENCE

CODED NOTES 1. MOUNT RECEPTACLE AT 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL ELEVATIONS FOR MOUNT RECEPTACLE AT 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL ELEVATIONS FOR BACKSPLASH/WORK SURFACE HEIGHT ABOVE FINISHED FLOOR. 2. WIRING DEVICES LOCATED BEHIND PLATFORM SHALL BE LOCATED 18" ABOVE PLATFORM. WIRING DEVICES LOCATED BEHIND PLATFORM SHALL BE LOCATED 18" ABOVE PLATFORM. 3. MOUNT RECEPTACLE AT 80" ABOVE FINISHED FLOOR FOR LCD FLAT SCREEN. MOUNT RECEPTACLE AT 80" ABOVE FINISHED FLOOR FOR LCD FLAT SCREEN. 4. PROVIDE A NEW WEATHER PROOF GFCI RECEPTACLE IN EXISTING BLACK BOX. PROVIDE A NEW WEATHER PROOF GFCI RECEPTACLE IN EXISTING BLACK BOX. 5. PROVIDE SEPARATE MANUAL MOTOR STARTERS WITH HOA SWITCHES FOR TF-1 AND EF-1. REFER TO CONTROL PROVIDE SEPARATE MANUAL MOTOR STARTERS WITH HOA SWITCHES FOR TF-1 AND EF-1. REFER TO CONTROL DIAGRAMS ON SHEET E-251. 6. PROVIDE A MANUAL MOTOR STARTER WITH AN HOA SWITCH FOR EF-3. REFER TO CONTROL DIAGRAM ON SHEET PROVIDE A MANUAL MOTOR STARTER WITH AN HOA SWITCH FOR EF-3. REFER TO CONTROL DIAGRAM ON SHEET E-251. 7. REFER TO ONELINE DIAGRAM ON SHEET E-240 FOR REQUIREMENTS. REFER TO ONELINE DIAGRAM ON SHEET E-240 FOR REQUIREMENTS. 8. PROVIDE PRE-WIRED WHIP AND FURNITURE SEVICE FITTING FOR PRE-WIRED SYSTEMS FURNITURE AND MAKE ALL PROVIDE PRE-WIRED WHIP AND FURNITURE SEVICE FITTING FOR PRE-WIRED SYSTEMS FURNITURE AND MAKE ALL FINAL CONNECTIONS TO 8 WIRE SYSTEM. NEUTRALS SHALL BE SHARED FOR EACH SEPARATE FURNITURE CONNECTION. MAXIMUM NUMBER OF OUTLETS PER CIRCUIT SHALL BE 3. 9. PROVIDE A MANUAL MOTOR STARTER WITH AN HOA SWITCH FOR EF-2. REFER TO CONTROL DIAGRAM ON SHEET PROVIDE A MANUAL MOTOR STARTER WITH AN HOA SWITCH FOR EF-2. REFER TO CONTROL DIAGRAM ON SHEET E-251. 10. NEW LOCATION FOR EXISTING FIRE ALARM CONTROL PANEL. PROVIDE CIRCUIT B-25 FOR FIRE ALARM CONTROL NEW LOCATION FOR EXISTING FIRE ALARM CONTROL PANEL. PROVIDE CIRCUIT B-25 FOR FIRE ALARM CONTROL PANEL. RUN 2-#12 + #12 GRD - 3/4 "C AND MAKE ALL FINAL CONNECTIONS. PROVIDE A RED BREAKER LOCK. 11. NEW LOCATION FOR EXISTING SIGCOM (MASS NOTIFICATION) CONTROL PANEL. PROVIDE CIRCUIT B-27, RUN 2-#12 NEW LOCATION FOR EXISTING SIGCOM (MASS NOTIFICATION) CONTROL PANEL. PROVIDE CIRCUIT B-27, RUN 2-#12 + #12 GRD - 3/4 "C AND MAKE ALL FINAL CONNECTIONS. 12. PROVIDE A 120V CIRCUIT FOR EMS INPUT TO BAS CONTROL PANEL, WIRE CIRCUIT THROUGH PUSH/PULL PROVIDE A 120V CIRCUIT FOR EMS INPUT TO BAS CONTROL PANEL, WIRE CIRCUIT THROUGH PUSH/PULL EMERGENCY POWER OFF PUSHBUTTON AND TO BAS CONTROL PANEL SWITCH SHALL BE A PUSH/PULL WITH RED MUSHROOM HEAD. 13. MOTORIZED DAMPERS FOR TF-1. REFER TO TF-1 WIRING DIAGRAM ON SHEET E-251 FOR CIRCUITRY MOTORIZED DAMPERS FOR TF-1. REFER TO TF-1 WIRING DIAGRAM ON SHEET E-251 FOR CIRCUITRY REQUIREMENTS AND SHEET M-110 FOR MECHANICAL INFORMATION. 14. NEW LOCATION FOR EXISTING SIGCOM (MASS NOTIFICATION) REMOTE ANNUNCIATOR. PROVIDE CIRCUIT B-29, RUN NEW LOCATION FOR EXISTING SIGCOM (MASS NOTIFICATION) REMOTE ANNUNCIATOR. PROVIDE CIRCUIT B-29, RUN 2-#12 + #12 GRD - 3/4 "C AND MAKE ALL FINAL CONNECTIONS. 15. APPROXIMATE ROUTE OF UNDERGROUND SERVICE SECONDARY TO BE INSTALLED. APPROXIMATE ROUTE OF UNDERGROUND SERVICE SECONDARY TO BE INSTALLED. 16. LOCATE BUILDING GROUND ARRAY IN THE GRASS IN THIS APPROXIMATE LOCATION. LOCATE BUILDING GROUND ARRAY IN THE GRASS IN THIS APPROXIMATE LOCATION. 17. NEW LOCATION FOR EXISTING FIRE ALARM REMOTE ANNUNCIATOR. PROVIDE CIRCUIT B-35, RUN 2-#12 + #12 GRD NEW LOCATION FOR EXISTING FIRE ALARM REMOTE ANNUNCIATOR. PROVIDE CIRCUIT B-35, RUN 2-#12 + #12 GRD - 3/4 "C AND MAKE ALL FINAL CONNECTIONS. 18. PROVIDE A 120V CIRCUIT FOR BMS CONTROL PANEL. PROVIDE CIRCUIT B-27, RUN 2-#12 + #12 GRD - 3/4 "C PROVIDE A 120V CIRCUIT FOR BMS CONTROL PANEL. PROVIDE CIRCUIT B-27, RUN 2-#12 + #12 GRD - 3/4 "C AND MAKE ALL FINAL CONNECTIONS. 19. PROVIDE A 120V CIRCUIT FOR BMS CONTROL PANEL. PROVIDE CIRCUIT B-29, RUN 2-#12 + #12 GRD - 3/4 "C PROVIDE A 120V CIRCUIT FOR BMS CONTROL PANEL. PROVIDE CIRCUIT B-29, RUN 2-#12 + #12 GRD - 3/4 "C AND MAKE ALL FINAL CONNECTIONS. 20. MOUNT DEVICES AT 60" ABOVE PLATFORM. MOUNT DEVICES AT 60" ABOVE PLATFORM. 21. RUN 2-#12 + #12 GRD - 3/4 "C AND MAKE ALL FINAL CONNECTIONS. RUN 2-#12 + #12 GRD - 3/4 "C AND MAKE ALL FINAL CONNECTIONS. 22. RUN 2-#12 + #12 GRD - 3/4 "C FOR VARIABLE REFRIGERENT VOLUME UNIT (VRV) AND MAKE ALL FINAL RUN 2-#12 + #12 GRD - 3/4 "C FOR VARIABLE REFRIGERENT VOLUME UNIT (VRV) AND MAKE ALL FINAL CONNECTIONS. 23. RUN 2-#12 + #12 GRD - 3/4 "C FOR BRANCH SELECTOR BOX (BSB) & BSB2 AND MAKE ALL FINAL RUN 2-#12 + #12 GRD - 3/4 "C FOR BRANCH SELECTOR BOX (BSB) & BSB2 AND MAKE ALL FINAL CONNECTIONS. 24. RUN 2-#10 + #10 GRD - 3/4 "C FOR ELECTRICAL HAND DRYER PROVIDED BY OTHERS AND INSTALLED BY E.C. RUN 2-#10 + #10 GRD - 3/4 "C FOR ELECTRICAL HAND DRYER PROVIDED BY OTHERS AND INSTALLED BY E.C. ELECTRICAL HAND DRYER PROVIDED BY OTHERS AND INSTALLED BY E.C. COORDINATE MOUNTING HEIGHT WITH ARCHITECT. CHECK WITH OTHERS PRIOR TO ROUGH-IN IF HAND DRYER IS PROVIDED WITH A RECESSED BACK BOX. 25. RUN 2 - #10 + #10 GRD - 3/4"C FOR THE MICROWAVE. PROVIDE A NEMA 5-20R GFCI RECEPTACLE MOUNTED RUN 2 - #10 + #10 GRD - 3/4"C FOR THE MICROWAVE. PROVIDE A NEMA 5-20R GFCI RECEPTACLE MOUNTED AT 4" TO CENTER ABOVE BACKSPLASH. 26. RUN 2 - #12 + #12 GRD - 3/4"C FOR THE COFFE MAKER. PROVIDE A NEMA 5-20R GFCI RECEPTACLE RUN 2 - #12 + #12 GRD - 3/4"C FOR THE COFFE MAKER. PROVIDE A NEMA 5-20R GFCI RECEPTACLE MOUNTED AT 4" TO CENTER ABOVE BACKSPLASH. 27. RUN 2 - #12 + #12 GRD - 3/4"C FOR THE REFRIGERATOR. PROVIDE A NEMA 5-20R GFCI RECEPTACLE RUN 2 - #12 + #12 GRD - 3/4"C FOR THE REFRIGERATOR. PROVIDE A NEMA 5-20R GFCI RECEPTACLE MOUNTED AT 48" A.F.F. 28. ROUTE 3/4”C, 2-#12, #12GRD AND PROVIDE A TOGGLE SWITCH ABOVE THE COUNTER SPLASH BOARD FOR ROUTE 3/4”C, 2-#12, #12GRD AND PROVIDE A TOGGLE SWITCH ABOVE THE COUNTER SPLASH BOARD FOR C, 2-#12, #12GRD AND PROVIDE A TOGGLE SWITCH ABOVE THE COUNTER SPLASH BOARD FOR DISPOSAL. 29. NEW APC SMART-UPS SMX300RMLV2U, 120V, 2.88 KVA, 60HZ. RUN (2)#10 & (1)#10 GRD IN 3/4" C. ROUTE NEW APC SMART-UPS SMX300RMLV2U, 120V, 2.88 KVA, 60HZ. RUN (2)#10 & (1)#10 GRD IN 3/4" C. ROUTE CONDUIT TO PANEL INDICATED. RECEPTACLE TO PLUG INI UPS IS TO BE NEMA L5-30P. 30. FOR FUTURE UPS, INSTALLATION SHALL BE SAME AS CODED NOTE #29.FOR FUTURE UPS, INSTALLATION SHALL BE SAME AS CODED NOTE #29.

E-241ELECTRICAL PANEL SCHEDULES

T-110TELECOMMUNICATIONS PLAN

TYP. OF 4

BREAK RM

COMPUTER TRAINING

OPEN

MECHANICAL

RISER

SPRINKLER

A/V

TRAINING ROOM

PHASE I

COPY RM

JANITOR

WOMEN

MEN

TELECOM

PROVIDE 12"W X 3"D WIRE MESH CABLE TRAY Y MOUNTED 8'-4 1/2" TO 8'-4 1/2" TO BOTTOM A.F.F.

TRANSITION TO 12" ALUMINUM LADDER TRAY WITH 3" SIDE 8'-4 1/2" TO BOTTOM A.F.F.

PROVIDE 6"W X 2"D WIRE MESH CABLE TRAY Y MOUNTED 8'-4 1/2" 8'-4 1/2" TO BOTTOM A.F.F.

PROVIDE 8"W X 2"D WIRE MESH CABLE TRAY Y MOUNTED 8'-4 1/2" 8'-4 1/2" TO BOTTOM A.F.F.

PROVIDE 8"W X 3"D WIRE MESH CABLE TRAY Y MOUNTED 8'-4 1/2" 8'-4 1/2" TO BOTTOM A.F.F.

FIBER

T-110

T-110

TURN CABLE TRAY OUT TO THIS LOCATION FOR FUTURE BUILDING EXPANSION. (PHASE 2)

NEW

SEE CONTINUATION ON SHEET T-111 IN ROOM 124

CC1

CC2

CC3

CC4

CC5

CC6

HDMI1

HDMI2

HDMI3

HDMI7

HDMI6

HDMI4

HDMI5

TYP.

HDMI8

CC8

CC7

G

T-510

SPACE FOR FUTURE RACK LOCATION (PHASE 2)

TMGB

FIBER OPTIC BACK BONE CABLE

PROVIDE 8"W X 2"D WIRE MESH CABLE TRAYY

3" TALL CONTINUOUS CABLE TRAY BARRIER

CATEGORY 6 VOICE AND DATA CABLING. 25 CABLES MAX PER BUNDLE. PROVIDE NYLON CABLE TIES TO BUNDLE HORIZONTAL CABLE. REFER TO DRAWINGS FOR EXACT QAUNTITIES

1" PLENUM RATED FIBER INNER DUCT

CATEGORY 6 VOICE AND DATA CABLING. 25 CABLES MAX PER BUNDLE. PROVIDE NYLON CABLE TIES TO BUNDLE HORIZONTAL CABLE. REFER TO DRAWINGS FOR EXACT QAUNTITIES

1" PLENUM RATED FIBER INNER DUCT FROM ROOM 113

RUN #6 AWG GROUNDING CONDUCTOR THROUGHOUT ENTIRE LENGTH OF CABLE TRAY. MAKE CONNECTIONS TO EACH INDIVIDUAL SECTION. DISTANCE BETWEEN CONNECTIONS SHALL NOT BE MORE THAN 50'-0".

PROVIDE 12"W X 3"D WIRE MESH CABLE TRAYY

RUN #6 AWG GROUNDING CONDUCTOR THROUGHOUT ENTIRE LENGTH OF CABLE TRAY. MAKE CONNECTIONS TO EACH INDIVIDUAL SECTION. DISTANCE BETWEEN CONNECTIONS SHALL NOT BE MORE THAN 50'-0".

1" PLENUM RATED FIBER INNER DUCT FROM ROOM 124

TELECOMMUNICATIONS PLAN

CRZ

GENERAL NOTES (APPLIES TO SHEET T-111) (APPLIES TO SHEET T-111) (APPLIES TO SHEET T-111) 1. ALL NEW FACEPLATES VOICE AND DATA WIRING DEVICES SHALL BE WHITE. ALL NEW FACEPLATES VOICE AND DATA WIRING DEVICES SHALL BE WHITE. 2. ALL NEW VOICE/DATA CABLING SHALL BE PROVIDED FOR TELECOMMUNICATIONS OUTLETS IN THE LOCATIONS AND ALL NEW VOICE/DATA CABLING SHALL BE PROVIDED FOR TELECOMMUNICATIONS OUTLETS IN THE LOCATIONS AND QUANTITIES AS INDICATED BY THE TELECOMMUNICATIONS SYMBOLS. VOICE/DATA CABLING SHALL BE CATEGORY 6, AND PLENUM RATED. RUN ALL CATEGORY 6 CABLING IN CABLE TRAY. RUN CABLE FROM CABLE TRAY TO INDIVIDUAL DROPS IN J-HOOKS. J-HOOKS SHALL BE INDEPENDENTLY SUPPORTED FROM THE STRUCTURE. LOCATE J-HOOKS IN COORDINATION WITH OTHER EXISTING AND NEW ITEMS INSTALLED ABOVE CEILING. MAXIMUM SPACING FOR J-HOOKS SHALL BE 6'-0" CENTER TO CENTER. 3. ALL POWER OUTLET LOCATIONS ARE SHOWN FOR REFERENCE. REFER TO SHEET E2.1 FOR ALL POWER REQUIREMENTS. ALL POWER OUTLET LOCATIONS ARE SHOWN FOR REFERENCE. REFER TO SHEET E2.1 FOR ALL POWER REQUIREMENTS. 4. SEE SHEET T-510 & T-511 FOR ALL TELECOMMUNICATIONS DETAILS. SEE SHEET T-510 & T-511 FOR ALL TELECOMMUNICATIONS DETAILS. 5. COORDINATE TELECOMMUNICATION DROPS WITH PROJECT MANAGER AFTER FFE (FURNITURE, FINISHES & EQUIPMENT) COORDINATE TELECOMMUNICATION DROPS WITH PROJECT MANAGER AFTER FFE (FURNITURE, FINISHES & EQUIPMENT) HAS BEEN COMPLETED AS THE PROJECT CONSTRUCTION PROGRESSES. 6. ROUTING ON THESE DRAWINGS SHOW ONLY CABLE TRAYS INTERCONNECTION BETWEEN THE TERMINATION POINTS AND ROUTING ON THESE DRAWINGS SHOW ONLY CABLE TRAYS INTERCONNECTION BETWEEN THE TERMINATION POINTS AND ROUTES TO BE SUBMITTED BY THE CONTRACTOR. THE SUBMITTAL SHALL BE STAMPED BY CONTRACTOR'S QUALIFIED RCDD. ALL WORK SHALL BE PERFORMED UNDER THE SUPERVISION OF RCDD AND VERIFIED BY HIM PRIOR TO ACCEPTANCE BY THE OWNER AS PER UFC-358-01. 7. ELECTRICAL FEEDS IN BUILDING ARE NOT TO RUN PARALLEL WITH VIDEO/AUDIO OR TELECOMMUNICATIONS CABLING ELECTRICAL FEEDS IN BUILDING ARE NOT TO RUN PARALLEL WITH VIDEO/AUDIO OR TELECOMMUNICATIONS CABLING SEGMENTS OR RACEWAYS. IF ELECTRICAL FEEDS MUST BE RUN PARALLEL, A MINIMUM OF 6" SEPARATION SHALL BE MAINTAINED. 8. IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE CABLE TRAY AND PATHWAYS. REFER TO DRAWINGS IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE CABLE TRAY AND PATHWAYS. REFER TO DRAWINGS FOR APPROXIMATE ROUTES. THE EXACT ROUTE TO BE DETERMINED AND VERIFIED BY THE CONTRACTOR AND FIELD CONDITIONS. 9. THE FINISHES FOR ALL TECHNOLOGY COMPONENTS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO THE FINISHES FOR ALL TECHNOLOGY COMPONENTS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO PROCUREMENT. SUBMITTAL SHALL BE STAMPED BY RCDD. 10. PRIOR TO DRILLING OR CORING IN TO EXISTING CONCRETE TO REMAIN, EXISTING REBAR AND PT TENDON SHALL BE PRIOR TO DRILLING OR CORING IN TO EXISTING CONCRETE TO REMAIN, EXISTING REBAR AND PT TENDON SHALL BE LOCATED BY SCANNING SHOP DRAWINGS SHOWING THE COORDINATED LOCATIONS OF OPENINGS AND ANCHORS TO AVOID DAMAGING EXISTING REBAR AND PT TENDONS SHALL BE SUBMITTED. CORING OF POST TENSION CONCRETE WILL NOT BE PERMITTED WITHOUT THE REVIEW OF THE ARCHITECT. 11. CABLING AND PATHWAYS SHALL COMPLY WITH CURRENT ADOPTED VERSION OF NFPA 72 AND AHJ REQUIREMENTS. CABLING AND PATHWAYS SHALL COMPLY WITH CURRENT ADOPTED VERSION OF NFPA 72 AND AHJ REQUIREMENTS.

CODED NOTES 1. PROVIDE A GROMMETED FACEPLATE WITH A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING PROVIDE A GROMMETED FACEPLATE WITH A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING A GROMMETED FACEPLATE WITH A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING A GROMMETED FACEPLATE WITH A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING GROMMETED FACEPLATE WITH A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING GROMMETED FACEPLATE WITH A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING FACEPLATE WITH A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING FACEPLATE WITH A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING WITH A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING WITH A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING A 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING 1-1/2" OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING OPENING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING FOR TELECOMMUNICATIONS CABLING. ROUTE CABLING TELECOMMUNICATIONS CABLING. ROUTE CABLING TELECOMMUNICATIONS CABLING. ROUTE CABLING CABLING. ROUTE CABLING CABLING. ROUTE CABLING ROUTE CABLING ROUTE CABLING CABLING CABLING IN TO THE PREMANUFACTURED CABLING TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL TO THE PREMANUFACTURED CABLING TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL TO THE PREMANUFACTURED CABLING TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL THE PREMANUFACTURED CABLING TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL THE PREMANUFACTURED CABLING TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL PREMANUFACTURED CABLING TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL PREMANUFACTURED CABLING TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL CABLING TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL CABLING TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL TROUGH INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL INTEGRAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL TO THE SYSTEMS FURNITURE AND MAKE ALL FINAL THE SYSTEMS FURNITURE AND MAKE ALL FINAL THE SYSTEMS FURNITURE AND MAKE ALL FINAL SYSTEMS FURNITURE AND MAKE ALL FINAL SYSTEMS FURNITURE AND MAKE ALL FINAL FURNITURE AND MAKE ALL FINAL FURNITURE AND MAKE ALL FINAL AND MAKE ALL FINAL AND MAKE ALL FINAL MAKE ALL FINAL MAKE ALL FINAL ALL FINAL ALL FINAL FINAL FINAL CONNECTIONS. 2. MOUNT TELECOMMUNICATIONS OUTLET AT 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL MOUNT TELECOMMUNICATIONS OUTLET AT 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL TELECOMMUNICATIONS OUTLET AT 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL TELECOMMUNICATIONS OUTLET AT 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL OUTLET AT 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL OUTLET AT 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL AT 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL AT 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL 4" TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL TO THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL THE CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL CENTER ABOVE BACKSPLASH. REFER TO ARCHITECTURAL ABOVE BACKSPLASH. REFER TO ARCHITECTURAL ABOVE BACKSPLASH. REFER TO ARCHITECTURAL BACKSPLASH. REFER TO ARCHITECTURAL BACKSPLASH. REFER TO ARCHITECTURAL REFER TO ARCHITECTURAL REFER TO ARCHITECTURAL TO ARCHITECTURAL TO ARCHITECTURAL ARCHITECTURAL ARCHITECTURAL ELEVATIONS FOR BACKSPLASH/WORK SURFACE HEIGHT ABOVE FINISHED FLOOR. 3. WIRING DEVICES LOCATED BEHIND PLATFORM SHALL BE LOCATED 18" ABOVE PLATFORM. WIRING DEVICES LOCATED BEHIND PLATFORM SHALL BE LOCATED 18" ABOVE PLATFORM. 4. MOUNT TELECOMMUNICATIONS OUTLET AT 80" ABOVE FINISHED FLOOR. MOUNT TELECOMMUNICATIONS OUTLET AT 80" ABOVE FINISHED FLOOR. 5. PROVIDE 3/4" FIRE RETARDANT STAMPED PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE PROVIDE 3/4" FIRE RETARDANT STAMPED PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE 3/4" FIRE RETARDANT STAMPED PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE 3/4" FIRE RETARDANT STAMPED PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE FIRE RETARDANT STAMPED PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE FIRE RETARDANT STAMPED PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE RETARDANT STAMPED PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE RETARDANT STAMPED PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE STAMPED PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE STAMPED PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE PLYWOOD ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE ON THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE THREE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE SIDES AS INDICATED. STAMP SHOULD BE VISIBLE AS INDICATED. STAMP SHOULD BE VISIBLE AS INDICATED. STAMP SHOULD BE VISIBLE INDICATED. STAMP SHOULD BE VISIBLE INDICATED. STAMP SHOULD BE VISIBLE STAMP SHOULD BE VISIBLE STAMP SHOULD BE VISIBLE SHOULD BE VISIBLE SHOULD BE VISIBLE BE VISIBLE BE VISIBLE VISIBLE VISIBLE EVEN WITH PAINT ON PLYWOOD. 6. BOND CABLE TRAY TO TELECOMMUNICATIONS MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING BOND CABLE TRAY TO TELECOMMUNICATIONS MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING CABLE TRAY TO TELECOMMUNICATIONS MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING CABLE TRAY TO TELECOMMUNICATIONS MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING TRAY TO TELECOMMUNICATIONS MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING TRAY TO TELECOMMUNICATIONS MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING TO TELECOMMUNICATIONS MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING TO TELECOMMUNICATIONS MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING TELECOMMUNICATIONS MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING TELECOMMUNICATIONS MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING MAIN GROUND BAR WITH AN INSULATED #6 AWG GROUNDING GROUND BAR WITH AN INSULATED #6 AWG GROUNDING GROUND BAR WITH AN INSULATED #6 AWG GROUNDING BAR WITH AN INSULATED #6 AWG GROUNDING BAR WITH AN INSULATED #6 AWG GROUNDING WITH AN INSULATED #6 AWG GROUNDING WITH AN INSULATED #6 AWG GROUNDING AN INSULATED #6 AWG GROUNDING AN INSULATED #6 AWG GROUNDING INSULATED #6 AWG GROUNDING INSULATED #6 AWG GROUNDING #6 AWG GROUNDING #6 AWG GROUNDING AWG GROUNDING AWG GROUNDING GROUNDING GROUNDING CONDUCTOR IN 3/4" CONDUIT. MAKE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE IN 3/4" CONDUIT. MAKE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE IN 3/4" CONDUIT. MAKE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE 3/4" CONDUIT. MAKE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE 3/4" CONDUIT. MAKE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE CONDUIT. MAKE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE CONDUIT. MAKE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE MAKE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE MAKE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE BONDING CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE CONNECTIONS WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE WITH TWO HOLE, LONG BARREL, COMPRESSION STYLE TWO HOLE, LONG BARREL, COMPRESSION STYLE TWO HOLE, LONG BARREL, COMPRESSION STYLE HOLE, LONG BARREL, COMPRESSION STYLE HOLE, LONG BARREL, COMPRESSION STYLE LONG BARREL, COMPRESSION STYLE LONG BARREL, COMPRESSION STYLE BARREL, COMPRESSION STYLE BARREL, COMPRESSION STYLE COMPRESSION STYLE COMPRESSION STYLE STYLE STYLE LUGS WITH INSPECTION WINDOW. LUGS SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND WITH INSPECTION WINDOW. LUGS SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND WITH INSPECTION WINDOW. LUGS SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND INSPECTION WINDOW. LUGS SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND INSPECTION WINDOW. LUGS SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND WINDOW. LUGS SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND WINDOW. LUGS SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND LUGS SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND LUGS SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND SHALL BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND BE TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND TIN PLATED COPPER. MAKE BOND TO LADDER TRAY, AND PLATED COPPER. MAKE BOND TO LADDER TRAY, AND PLATED COPPER. MAKE BOND TO LADDER TRAY, AND COPPER. MAKE BOND TO LADDER TRAY, AND COPPER. MAKE BOND TO LADDER TRAY, AND MAKE BOND TO LADDER TRAY, AND MAKE BOND TO LADDER TRAY, AND BOND TO LADDER TRAY, AND BOND TO LADDER TRAY, AND TO LADDER TRAY, AND TO LADDER TRAY, AND LADDER TRAY, AND LADDER TRAY, AND TRAY, AND TRAY, AND AND AND PROVIDE A #6 AWG BONDING JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR A #6 AWG BONDING JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR A #6 AWG BONDING JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR #6 AWG BONDING JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR #6 AWG BONDING JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR AWG BONDING JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR AWG BONDING JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR BONDING JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR BONDING JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR JUMPER TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR TO WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR WIRE BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR BASKET TRAY. RUN A #6 AWG GROUNDING CONDUCTOR TRAY. RUN A #6 AWG GROUNDING CONDUCTOR TRAY. RUN A #6 AWG GROUNDING CONDUCTOR RUN A #6 AWG GROUNDING CONDUCTOR RUN A #6 AWG GROUNDING CONDUCTOR A #6 AWG GROUNDING CONDUCTOR A #6 AWG GROUNDING CONDUCTOR #6 AWG GROUNDING CONDUCTOR #6 AWG GROUNDING CONDUCTOR AWG GROUNDING CONDUCTOR AWG GROUNDING CONDUCTOR GROUNDING CONDUCTOR GROUNDING CONDUCTOR CONDUCTOR CONDUCTOR THROUGHOUT THE ENTIRE LENGTH OF WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE THE ENTIRE LENGTH OF WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE THE ENTIRE LENGTH OF WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE ENTIRE LENGTH OF WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE ENTIRE LENGTH OF WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE LENGTH OF WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE LENGTH OF WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE OF WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE OF WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE WIRE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE BASKET TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE TRAY. EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE EACH INDIVIDUAL SECTION OF CABLE TRAY SHALL BE INDIVIDUAL SECTION OF CABLE TRAY SHALL BE INDIVIDUAL SECTION OF CABLE TRAY SHALL BE SECTION OF CABLE TRAY SHALL BE SECTION OF CABLE TRAY SHALL BE OF CABLE TRAY SHALL BE OF CABLE TRAY SHALL BE CABLE TRAY SHALL BE CABLE TRAY SHALL BE TRAY SHALL BE TRAY SHALL BE SHALL BE SHALL BE BE BE BONDED TO THE #6 AWG GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE TO THE #6 AWG GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE TO THE #6 AWG GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE THE #6 AWG GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE THE #6 AWG GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE #6 AWG GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE #6 AWG GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE AWG GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE AWG GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE GROUNDING CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE CONDUCTOR WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE WITH A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE A COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE COMPRESSION TYPE, COPPER CONNECTOR. DISTANCE TYPE, COPPER CONNECTOR. DISTANCE TYPE, COPPER CONNECTOR. DISTANCE COPPER CONNECTOR. DISTANCE COPPER CONNECTOR. DISTANCE CONNECTOR. DISTANCE CONNECTOR. DISTANCE DISTANCE DISTANCE BETWEEN CONNECTIONS SHALL NOT BE MORE THAN BE 50'-0". 7. NOT USED. NOT USED. 8. TELECOMMUNICATIONS MAIN GROUND BAR. SEE ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED TELECOMMUNICATIONS MAIN GROUND BAR. SEE ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED MAIN GROUND BAR. SEE ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED MAIN GROUND BAR. SEE ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED GROUND BAR. SEE ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED GROUND BAR. SEE ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED BAR. SEE ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED BAR. SEE ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED SEE ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED SEE ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED ONE LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED LINE DIAGRAM SHEET E-240. RUN A #1/0 INSULATED DIAGRAM SHEET E-240. RUN A #1/0 INSULATED DIAGRAM SHEET E-240. RUN A #1/0 INSULATED SHEET E-240. RUN A #1/0 INSULATED SHEET E-240. RUN A #1/0 INSULATED E-240. RUN A #1/0 INSULATED E-240. RUN A #1/0 INSULATED RUN A #1/0 INSULATED RUN A #1/0 INSULATED A #1/0 INSULATED A #1/0 INSULATED #1/0 INSULATED #1/0 INSULATED INSULATED INSULATED GROUNDING CONDUCTOR IN 3/4" CONDUIT TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED CONDUCTOR IN 3/4" CONDUIT TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED CONDUCTOR IN 3/4" CONDUIT TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED IN 3/4" CONDUIT TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED IN 3/4" CONDUIT TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED 3/4" CONDUIT TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED 3/4" CONDUIT TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED CONDUIT TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED CONDUIT TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED TO AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED AC SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED SYSTEMS MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED MAIN GROUND BAR. PROVIDE A #6 AWG INSULATED GROUND BAR. PROVIDE A #6 AWG INSULATED GROUND BAR. PROVIDE A #6 AWG INSULATED BAR. PROVIDE A #6 AWG INSULATED BAR. PROVIDE A #6 AWG INSULATED PROVIDE A #6 AWG INSULATED PROVIDE A #6 AWG INSULATED A #6 AWG INSULATED A #6 AWG INSULATED #6 AWG INSULATED #6 AWG INSULATED AWG INSULATED AWG INSULATED INSULATED INSULATED GROUNDING CONDUCTOR TO OPEN AIR EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE CONDUCTOR TO OPEN AIR EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE CONDUCTOR TO OPEN AIR EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE TO OPEN AIR EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE TO OPEN AIR EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE OPEN AIR EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE OPEN AIR EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE AIR EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE AIR EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE EQUIPMENT RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE RACK FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE FROM TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE TELECOMMUNICATIONS MAIN GROUND BAR. REMOVE MAIN GROUND BAR. REMOVE MAIN GROUND BAR. REMOVE GROUND BAR. REMOVE GROUND BAR. REMOVE BAR. REMOVE BAR. REMOVE REMOVE REMOVE ANY POWDER COATING AT BONDING LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR POWDER COATING AT BONDING LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR POWDER COATING AT BONDING LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR COATING AT BONDING LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR COATING AT BONDING LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR AT BONDING LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR AT BONDING LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR BONDING LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR BONDING LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR LOCATIONS AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR AND MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR MAKE DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR DIRECT CONTACT WITH METAL CHASSIS. GROUND BAR CONTACT WITH METAL CHASSIS. GROUND BAR CONTACT WITH METAL CHASSIS. GROUND BAR WITH METAL CHASSIS. GROUND BAR WITH METAL CHASSIS. GROUND BAR METAL CHASSIS. GROUND BAR METAL CHASSIS. GROUND BAR CHASSIS. GROUND BAR CHASSIS. GROUND BAR GROUND BAR GROUND BAR BAR BAR SHALL BE 10"L X 4"T X 1/4" THICK COPPER ON NEOPRENE STANDOFF ISOLATORS. 9. PROVIDE A 19" ALUMINUM OPEN AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. PROVIDE A 19" ALUMINUM OPEN AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. A 19" ALUMINUM OPEN AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. A 19" ALUMINUM OPEN AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. 19" ALUMINUM OPEN AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. 19" ALUMINUM OPEN AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. ALUMINUM OPEN AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. ALUMINUM OPEN AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. OPEN AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. OPEN AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. AIR RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. RACK WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. WITH ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. ONE VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. VERTICAL WIRE MANAGER AND BOLT RACK TO THE FLOOR. WIRE MANAGER AND BOLT RACK TO THE FLOOR. WIRE MANAGER AND BOLT RACK TO THE FLOOR. MANAGER AND BOLT RACK TO THE FLOOR. MANAGER AND BOLT RACK TO THE FLOOR. AND BOLT RACK TO THE FLOOR. AND BOLT RACK TO THE FLOOR. BOLT RACK TO THE FLOOR. BOLT RACK TO THE FLOOR. RACK TO THE FLOOR. RACK TO THE FLOOR. TO THE FLOOR. TO THE FLOOR. THE FLOOR. THE FLOOR. FLOOR. FLOOR. PROVIDE THE FOLLOWING WITHIN THE RACK. A. A 12 PORT OPTICAL FIBER PATCH PANEL AT THE TOP OF THE RACK. A 12 PORT OPTICAL FIBER PATCH PANEL AT THE TOP OF THE RACK. B. TWO (2) 48 PORT CATEGORY 6 PATCH PANELS. TWO (2) 48 PORT CATEGORY 6 PATCH PANELS. C. PROVIDE HORIZONTAL WIRE MANAGERS BETWEEN EACH PATCH PANEL. PROVIDE HORIZONTAL WIRE MANAGERS BETWEEN EACH PATCH PANEL. D. NETWORK ELECTRONICS AND RACK MOUNTED UPS PROVIDED BY THE OWNER. NETWORK ELECTRONICS AND RACK MOUNTED UPS PROVIDED BY THE OWNER. E. TWO (2) CISCO WS-C3850-48F-S PoE+ SWITCHES. TWO (2) CISCO WS-C3850-48F-S PoE+ SWITCHES. 10. PROVIDE AN INDOOR FIBER SPLICE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE PROVIDE AN INDOOR FIBER SPLICE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE AN INDOOR FIBER SPLICE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE AN INDOOR FIBER SPLICE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE INDOOR FIBER SPLICE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE INDOOR FIBER SPLICE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE FIBER SPLICE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE FIBER SPLICE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE SPLICE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE SPLICE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE CLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE FOR ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE ENTRANCE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE CABLE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE AND NEW OPTICAL FIBER. MOUNT ENCLOSURE NEW OPTICAL FIBER. MOUNT ENCLOSURE NEW OPTICAL FIBER. MOUNT ENCLOSURE OPTICAL FIBER. MOUNT ENCLOSURE OPTICAL FIBER. MOUNT ENCLOSURE FIBER. MOUNT ENCLOSURE FIBER. MOUNT ENCLOSURE MOUNT ENCLOSURE MOUNT ENCLOSURE ENCLOSURE ENCLOSURE TO WALL AND MAKE ALL FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE WALL AND MAKE ALL FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE WALL AND MAKE ALL FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE AND MAKE ALL FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE AND MAKE ALL FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE MAKE ALL FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE MAKE ALL FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE ALL FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE ALL FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE FINAL CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE CONNECTIONS. AFTER SPLICE HAS BEEN MADE, THE LINK AND ENTIRE RISER CABLE CONNECTIONS.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.