A15_Attachment_3_DRAWINGS_FINAL__ZQEL_15-0005C-_4_of_4.pdf

PDF 14 MB Posted

Attached to
Renovate/Repair Combat Arms Training and Maintenance (CATM) facility (Bldg. 530) and Construct addition to Bldg. 530
Solicitation number
FA665619BA001
Issued by

About this file

Attachment 3 - DRAWINGS for PROJECT: ZQEL 15-0005B/C 4 of 4

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E-111LIGHTING PLAN TRAINING AREA

OI

HOFOETATS

R E

E

NI

GNELANOISSE

F

O R

P

DERETSIGER

E-57345

ALGHOTHANI

ALI

PJT #: ZQEL 15-0005C

DATE: 9/20/2017 FINAL

DRN. BY:

DGN. BY:

REV. BY:

SHEET

DATE REMARKS

REVISIONS

REV#

1910 Crown Park Ct.. Columbus, OH 43235 Tel: 614.538.8445 Fax: 614.538.8446 www.starconsultants.org

DATE REMARKS

REVISIONS

REV#

OF 92

DEPARTMENT OF THE AIR FORCE (ZQEL 15-0005B/C)

RENOVATE COMBAT ARMS TRAINING AND MAINTENANCE (CATM), B530

910TH AIRLIFT WING, 3976 KINGS GRAVE ROAD

YOUNGSTOWN WARREN REGIONAL AIRPORT, VIENNA, OHIO 44473

A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 71
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 72
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 73
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 74
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 75
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 76
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 77
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 78
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 79
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 80
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 81
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 82
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 83
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 84
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 85
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 86
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 87
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 88
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 89
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 90
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 91
A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 92

File details come from the government source that posted it.