A15_Attachment_3_DRAWINGS_FINAL__ZQEL_15-0005C-_4_of_4.pdf
PDF 14 MB Posted
- Solicitation number
- FA665619BA001
About this file
Attachment 3 - DRAWINGS for PROJECT: ZQEL 15-0005B/C 4 of 4
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-111LIGHTING PLAN TRAINING AREA
OI
HOFOETATS
R E
E
NI
GNELANOISSE
F
O R
P
DERETSIGER
E-57345
ALGHOTHANI
ALI
PJT #: ZQEL 15-0005C
DATE: 9/20/2017 FINAL
DRN. BY:
DGN. BY:
REV. BY:
SHEET
DATE REMARKS
REVISIONS
REV#
1910 Crown Park Ct.. Columbus, OH 43235 Tel: 614.538.8445 Fax: 614.538.8446 www.starconsultants.org
DATE REMARKS
REVISIONS
REV#
OF 92
DEPARTMENT OF THE AIR FORCE (ZQEL 15-0005B/C)
RENOVATE COMBAT ARMS TRAINING AND MAINTENANCE (CATM), B530
910TH AIRLIFT WING, 3976 KINGS GRAVE ROAD
YOUNGSTOWN WARREN REGIONAL AIRPORT, VIENNA, OHIO 44473
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 71 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 72 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 73 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 74 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 75 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 76 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 77 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 78 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 79 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 80 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 81 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 82 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 83 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 84 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 85 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 86 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 87 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 88 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 89 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 90 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 91 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 92 |
File details come from the government source that posted it.