A15_Attachment_3_DRAWINGS_FINAL__ZQEL_15-0005C-_1_of_4.pdf
PDF 18 MB Posted
- Solicitation number
- FA665619BA001
About this file
Attachment 3 - DRAWINGS for PROJECT: ZQEL 15-0005B/C 1 of 4
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AD-111REFLECTED CEILING DEMOLITION PLAN
PJT #: ZQEL 15-0005C
DATE: 9/20/2017 FINAL
DRN. BY:
DGN. BY:
REV. BY:
SHEET
DATE REMARKS
REVISIONS
REV#
1910 Crown Park Ct.. Columbus, OH 43235 Tel: 614.538.8445 Fax: 614.538.8446 www.starconsultants.org
DATE REMARKS
REVISIONS
REV#
OF 92
DEPARTMENT OF THE AIR FORCE (ZQEL 15-0005B/C)
RENOVATE COMBAT ARMS TRAINING AND MAINTENANCE (CATM), B530
910TH AIRLIFT WING, 3976 KINGS GRAVE ROAD
YOUNGSTOWN WARREN REGIONAL AIRPORT, VIENNA, OHIO 44473
DATE: 9/20/2017 FINAL
DRN. BY:
DGN. BY:
REV. BY:
SHEET
DATE REMARKS
REVISIONS
REV#
1910 Crown Park Ct.. Columbus, OH 43235 Tel: 614.538.8445 Fax: 614.538.8446 www.starconsultants.org
DATE REMARKS
REVISIONS
REV#
OF 92
DEPARTMENT OF THE AIR FORCE (ZQEL 15-0005B/C)
RENOVATE COMBAT ARMS TRAINING AND MAINTENANCE (CATM), B530
910TH AIRLIFT WING, 3976 KINGS GRAVE ROAD
AD-112OVERALL ROOF DEMOLITION PLAN
A-111AREFLECTED CEILING PLAN
DATE: 9/20/2017 FINAL
DRN. BY:
DGN. BY:
REV. BY:
SHEET
DATE REMARKS
REVISIONS
REV#
1910 Crown Park Ct.. Columbus, OH 43235 Tel: 614.538.8445 Fax: 614.538.8446 www.starconsultants.org
DATE REMARKS
REVISIONS
REV#
OF 92
DEPARTMENT OF THE AIR FORCE (ZQEL 15-0005B/C)
RENOVATE COMBAT ARMS TRAINING AND MAINTENANCE (CATM), B530
910TH AIRLIFT WING, 3976 KINGS GRAVE ROAD
DATE: 9/20/2017 FINAL
DRN. BY:
DGN. BY:
REV. BY:
SHEET
DATE REMARKS
REVISIONS
REV#
1910 Crown Park Ct.. Columbus, OH 43235 Tel: 614.538.8445 Fax: 614.538.8446 www.starconsultants.org
DATE REMARKS
REVISIONS
REV#
OF 92
DEPARTMENT OF THE AIR FORCE (ZQEL 15-0005B/C)
RENOVATE COMBAT ARMS TRAINING AND MAINTENANCE (CATM), B530
910TH AIRLIFT WING, 3976 KINGS GRAVE ROAD
A-114ROOF PLAN
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 1 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 2 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 3 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 4 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 5 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 6 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 7 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 8 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 9 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 10 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 11 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 12 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 13 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 14 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 15 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 16 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 17 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 18 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 19 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 20 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 21 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 22 |
| A15 Attachment 3 DRAWINGS FINAL_ ZQEL 15-0005C-20170920 23 |
File details come from the government source that posted it.