B346_Project_Illustrated_Photos.docx

DOCX document 677 KB Posted

Attached to
Premise Wiring for Building 346 Federal contract opportunity
Solicitation number
FA6648-15-T-0003
Issued by
Department of the Air Force Reserve Command

About this file

B346 Project Illustrated Photos

View the file

Other files for this federal contract opportunity

Other files attached to Premise Wiring for Building 346, newest first.
File Type Posted
List_of_Materials_for_the_review.pdf PDF
CAT_6_Cabling.pdf PDF
B346_OSP_CVC_snap_shot.docx DOCX document
Education__Training_Comm_Layout.jpg JPG image
Bldg__346_First_Floor.pdf PDF
Q__A_Bldg__346_docx_(2).docx DOCX document
Copy_of_CAT6_Cable_Color_Code.xlsx XLSX spreadsheet
Example_of_Patch_Panel_layout.docx DOCX document
Bldg__346_Second_Floor.pdf PDF
TIA-EIA-569-A-7-Cable_Tray.pdf PDF
Existing_handholes_and_manholes_to_bldg_346.pdf PDF
Q__A_Bldg__346_docx_(2).docx DOCX document
CAT_6_Cabling.pdf PDF
List_of_Materials_for_the_review.pdf PDF
B346_OSP_CVC_snap_shot.docx DOCX document
Example_of_Patch_Panel_layout.docx DOCX document
Copy_of_CAT6_Cable_Color_Code.xlsx XLSX spreadsheet
TIA-EIA-569-A-7-Cable_Tray.pdf PDF
Existing_handholes_and_manholes_to_bldg_346.pdf PDF
B346_Project_Illustrated_Photos.docx DOCX document
Bldg__346_First_Floor.pdf PDF
SOW_Premise_Wiring_B346.doc DOC document
Education__Training_Comm_Layout.jpg JPG image
Bldg__346_Second_Floor.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 346 Project Illustrated Photos

Picture 1: An example of three conduits installed but Building 346 requires only two conduits Existing fiber to be re-pulled and re-routed

Picture 2: Existing 12 SM fiber that need to be re-routed thru new conduit as shown in Picture 1 Install ¾” back board plywood whole back

Picture 3: Main Comm Room on second floor, install ¾” back board plywood to cover the whole South wall Proposed two 4 inch conduits from Mech. Rm (1st Floor) to Comm. Rm (2nd Floor)

Picture 4: Bore two 4 inch conduits from Mech. Room (1st Floor) ceiling straight up to the Comm. Room (2nd Floor) Two conduits came from Mech. Rm 1st Floor

Picture 5: This is an approximate location where the two 4 inch conduits came from Mech. Room (1st Floor) Existing copper remains in 66 blocks Existing fiber P/P to be relocated to rack

Picture 6: all these existing equipment, 110 blocks, and old wiring need to be removed and clean up with an exception of existing fiber patch panel to be relocated and existing copper remains in 66 blocks image6.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg

File details come from the government source that posted it. Updated .