20260810 B752 Q-A.pdf
PDF 163 KB Posted
- Attached to
- B752 Repair Facade and Tuckpointing
- Solicitation number
- FA663326Q0007
About this file
This is a Questions and Answers document from a Request for Quote (RFQ) updated on August 10, 2026, addressing eleven clarifications from proposers regarding a construction project.
The government responses clarify several technical and administrative requirements. For design details, proposers should reference original construction documents: detail 7/A3 for window flashing, sections S2 and Mechanical detail 7 of M3 for A/C supply duct connections, and section 04 20 00 paragraph 2.1.2 of technical specifications for brick replacement specifications. The government authorizes replacement of the front door entryway concrete slab to eliminate trip hazards and improve slope connections. Regarding staffing, one qualified individual may perform Superintendent, SSHO (Supervisory Safety and Health Official), and QC (Quality Control) roles simultaneously throughout the project. No temporary fencing or traffic controls are required for the work area surrounding the building or storage/staging areas as proposed in site utilization plans. The lawn sprinkler system, totaling approximately 70 linear feet (60LF plus an additional 10LF head on the SE corner), must be permanently disconnected and disabled prior to Notice to Proceed; it should not be reinstalled or replaced. Quotes are due August 19, 2026, with questions due by August 14, 2026. The evaluation basis is Lowest Price Technically Acceptable (LPTA), with technical acceptability determined by capability statements including past performance. Valid quotes must be held for 60 days, and no bid hold period is required following solicitation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Updated 10 August 2026
Questions Government Response
1. May we have a flashing detail cut sheet for the windows.
Attached is the original detail (det 7/A3), indicating a flashing below each window sill.
2.Do the engineers have a flashing detail cut sheet for the A/C Supply Duct connected to the building
The original mechanical details (S2 and Mechanical det 7 of M3) are the only info provided.
3. Can we replace the concrete slab at the front doors to eliminate the trip hazard and slope to connected slab.
The contractor can replace the entryway slab with new
4. Is there a brick spec in the plans for brick replacement?
The brick specification in section 04 20 00 paragraph 2.1.2 of the technical specs as separate bid documents.
5. KTR requested existing conditions photo See attached Photos
6. Confirm that the Government will allow proposers a minimum of ten (10) business days to respond to the RFQ starting from the date that the Government responds to 100% of the inquiries received.
The quotes are due 19 Aug with questions due by 14 August. However, site visit were conducted on 29 July with no questions.
7. Please clarify that the Superintendent/SSHO/QC positions may be performed by one qualified individual that is present at the project site during ALL construction operations, AKA "Triple Hat"
One person present at the site during the course of the project can perform three roles during the course of the project.
8. Please clarify that the work area immediately surrounding the building (Limits of Disturbance or LOD) and storage/staging area (Lay down area) proposed in the KTRs site utilization plan during the submittal phase will not require temporary fencing and/or traffic controls during the construction phase.
No temporary fencing in required.
Updated 10 August 2026
9. Please clarify that the 60LF of lawn sprinkler assembly is permanantly disabled and "Made Safe" prior to NTP and that the lawn sprinkler assembly is not to be reinstalled nor replaced.
The lawn sprinkler system is permanently disconnected that includes the plumbing(cut just below the grade by the wall) and electrical connections to the actuator inside the handhole. Therefore, it is safe to remove it.
There is one more sprinkler head on the SE corner on the building closer to the A/C Unit Equipment pad that is part of the disabled spri system that was omitted.
This closed to another 10LF. It was later noted during the site visit.
10. Please confirm that the bid hold for this RFQ is 10 days.
Following solicitation does not require bid hold but valid quote required for 60 days. Following will be amended with other clerical error correction.
11. The Quote Preparation Instructions states, "This solicitation is conducted under the streamlined commercial procedures of RFO 12.203 to determine the Lowest Price Technically Acceptable (LPTA) quote." The Basis for Contract Award states, "This is a competitive Request for Quote conducted in accordance with the Simplified Acquisition procedure pursuant to FAR Part 12, as supplemented,in which competing quotations will be evaluated on a price or price related factor only basis." Please clarify if this is LPTA or a price only quote.
Per Section L and M, Technical acceptability will be evaluated on capability statement (with Past Performance) as LPTA