Attachment 4 Submittal Register.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
B752 Repair Facade and Tuckpointing
Solicitation number
FA663326Q0007
Issued by

About this file

This is a Submittal Register template for the Sustain Facade and Tuck-Pointing project (Contract No. B752) at Minneapolis Air Reserve Station. The document outlines the required submittals and documentation that the contractor must provide throughout the project lifecycle, organized by construction specification sections and submittal types.

The register identifies key preconstruction submittals including a baseline construction schedule, submittal register, construction site plan, and demolition plan. Product data and samples are required for materials such as clay or shale brick, cementitious materials, admixtures for masonry mortar, expansion joints, sealants, primers, bond breakers, backstops, and cleaning solvents. Additional submittals include certificates (monthly updates and notifications), test reports (accident reports, hot work permits, and field adhesion testing), manufacturer's instructions for masonry mortar admixtures, warranty management plans, operation and maintenance data (including a take-back program), and cold weather procedures. The register provides a structured tracking system with columns for activity numbers, specification sections, descriptions, submission deadlines, approval requirements, and action codes, enabling systematic management of all contractor submissions and government approvals throughout the facade and tuckpointing repair work.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
SUSTAIN FACADE-TUCK-POINTING,B752CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 32 16.00 20SD-01 Preconstruction Submittals
Baseline Construction Schedule1.2G
SD-07 Certificates
Monthly Updates1.4
01 33 00SD-01 Preconstruction Submittals
Submittal Register1.7G
01 35 26SD-06 Test Reports
Accident Reports1.11.2G
Hot Work Permit1.12
01 50 00SD-01 Preconstruction Submittals
Construction Site Plan1.2G
01 78 00SD-03 Product Data
Warranty Management Plan1.3.1
02 41 00SD-01 Preconstruction Submittals
Demolition Plan1.2.2G
Existing Conditions1.9
SD-07 Certificates
Notification1.7G
04 20 00SD-03 Product Data
Cold Weather Procedures1.5.1G
Clay or Shale Brick2.1.2G
Cementitious Materials2.3.1.1G
SD-04 Samples
Clay or Shale Brick2.1.2G
Admixtures for Masonry Mortar2.3.1.4G
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
SUSTAIN FACADE-TUCK-POINTING,B752CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
04 20 00Clay Masonry Expansion-Joint2.5.1G
Materials
Color2.3.1.3
SD-07 Certificates
Clay or Shale Brick2.1.2
Cementitious Materials2.3.1.1
Admixtures for Masonry Mortar2.3.1.4
SD-08 Manufacturer’s Instructions
Admixtures for Masonry Mortar2.3.1.4
SD-10 Operation and Maintenance
Data
Take-Back Program3.8
07 92 00SD-03 Product Data
Sealants2.1G
Primers2.2G
Bond Breakers2.3G
Backstops2.4G
Cleaning Solvents2.5G
SD-06 Test Reports
Field Adhesion3.1G