Technical_Specifications.pdf
PDF 2 MB Posted
- Attached to
- Repair Life Support Bldg 830 Federal contract opportunity
- Solicitation number
- FA6633-14-B0002
About this file
Technical Specifications (941 pgs)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Attendance_List_9-3-14.pdf | ||
| Site_Visit_Attendance_List_8-19-14.pdf | ||
| Map_to_Bldg_830_and_729.pdf | ||
| Site_Visit_Attendance_List_8-21-14.pdf | ||
| QUESTIONS-RESPONSES_001.pdf | ||
| 2002_E-E_LBP_XRF_Data_-_Bldg_830.pdf | ||
| Amendment_0001.doc | DOC document | |
| 2001_AES_Report_-_Bldg_830.pdf | ||
| Wage_Det_MN36_8-15-14.doc | DOC document | |
| 2002_E-E__Asbestos-LBP_Report_2002.pdf | ||
| 2011_830_Tile-Mastic_results.pdf | ||
| Technical_Drawings.pdf | ||
| Wage_Determination_MN36.doc | DOC document | |
| SF_24_Bid_Bond_Form.pdf | ||
| FA6633-14-B0002_IFB.doc | DOC document | |
| Financial_Responsibility_Sheet.doc | DOC document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Life Support Building 830 Minneapolis – Saint Paul Air Reserve Station, Minnesota
SPECIFICATIONS
16 JUNE 2014
HEADQUARTERS AIR FORCE
RESERVE COMMAND
Command-Wide Architect and Engineering Services
Repair Life Support, Building 830 10153K
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 40 01 30 00 01 33 00 01 35 26 01 42 00 01 45 00.00 10
01 62 35 01 74 19 01 78 00 01 78 23
SUMMARY OF WORK
ADMINISTRATIVE REQUIREMENTS
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
RECYCLED / RECOVERED MATERIALS
CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING **
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 42 13 METAL WALL PANELS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 36 13 SECTIONAL OVERHEAD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
PROJECT TABLE OF CONTENTS Page 1
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 16.00 40 PANELBOARDS
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 32 11 SOIL SURFACE EROSION CONTROL
PROJECT TABLE OF CONTENTS Page 2
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 24.00 10 PAVEMENT MARKINGS
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
PAGE INTENTIONALLY
LEFT BLANK
SECTION 01 11 00.00 40
SUMMARY OF WORK
06/06, Rev 12/07 (934 MSG/CEC)
PART 1 GENERAL
1.1 ATTACHMENTS
AF IMT 3064 (Construction Progress Schedule)
AF IMT 3065 (Progress Report)
1.2 DESCRIPTION OF WORK
This project renovates existing building 830. The renovation includes a new floor plan layout, new mechanical/plumbing systems, new electrical/lighting systems, new fire suppression/alarm systems and new communications systems.
The renovation includes selective demolition of existing non-load bearing walls, ceilings, interior finishes and existing systems.
The renovation also includes demolition and replacement of an existing load-bearing basement foundation wall, an existing loading dock and an existing exterior stair enclosure.
1.3 CONTRACT DRAWINGS AND SPECIFICATIONS
1.3.1 1.3.1 SETS FURNISHED
The Contractor shall be responsible for making copies of specifications including amendments. The bid drawings as amended shall be utilized in the performance of the work (i.e., bid drawings that have been posted with all amendment changes) as provided to the contractor. See the paragraph below for contract drawing and distribution requirements. The work shall conform to the contract drawings, set out in the drawing index, all of which form a part of these specifications. The work shall also conform to any standard details bound or referenced herein.
1.3.2 NOTIFICATIONS OF DISCREPANCIES
The Contractor shall check all drawing files furnished him immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. Dimensions marked on drawings shall be followed in lieu of scale measurements. Enlarged plans and details shall govern where the same work is shown at smaller scales. All scales shown are based on a standard drawing size of 24" x 36". If any other size drawings are furnished or plotted the contractor shall adjust the scales accordingly. The Contractor shall also advise sub-contractors of the above. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.
1.3.3 OMISSIONS
Omissions from the drawings or specifications or the mis-description of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or mis-described details of the work and will be responsible for any errors which might have been avoided thereby.
SECTION 01 11 00.00 40 Page 1
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Submit the following items to the Contracting Officer:
Construction Progress Schedule (AF IMT 3064); G Material Approval Schedule (AF IMT 3000); G
See Sub-section 1.7 SCHEDULING OF WORK.
SD-11 Closeout Submittals
Submit the following items to the Contracting Officer:
DD Form 1354 Checklist; G AF IMT 3065 (Progress Report); G
Contractor shall submit for approval within 10 days after NTP, a plan indicating the location and phasing of the temporary fencing and new security fencing to ensure security and emergency access are maintained to the Air Reserve Station throughout the life of the contract. Close coordination with Base Security personnel and the Contracting Officer's Representative is required. Proposed location for the fencing and proposed construction phasing plan are identified on the drawings.
1.5 SCHEDULING OF WORK
The Contractor shall, within five days after the work commences or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval, three (3) copies of a Construction Progress Schedule (AF IMT 3064) showing the order in which the Contractor proposes to perform the work. The schedule shall separate the work into phases developed in cooperation with the Government. The schedule shall include the dates on which the Contractor contemplates starting and completing the salient elements of the work. The Contractor shall also specifically identify on each progress report, any apparent, anticipated or proposed deviation form the previously approved schedule.
1.6 REGULATIONS
The Contractor shall comply with all standard and special safety and fire regulations, including those in the Corps of Engineers Safety Manual, the American General Contractors Safety Manual, OSHA, and certain base regulations. Prior to the start of the work, the Contractor may be required to meet with the Contracting Officer to review specific safety and fire regulations.
1.7 TESTING
The contractor shall furnish all material testing and certifications as
SECTION 01 11 00.00 40 Page 2 required by this contract. Any expense associated with the use of an independent testing agency, as may be required by this contract shall be provided by the contractor unless otherwise specified.
1.8 WARRANTIES AND OPERATING INSTRUCTIONS
Warranties and operating instructions are required to be submitted directly to the Contracting Officer at the completion of the contract work. Four copies of all warranties and operating instructions shall be provided unless otherwise specified.
1.9 GOVERNMENT OCCUPANCY
The Government will not occupy the work site during construction, however may need access to items stored in the building periodically. The Contractor shall cooperate with the Government when items need to be retrieved.
1.10 BASE HOURS
Base operation hours are 7:00 a.m. to 5:00 p.m. daily (Monday through Friday), excluding federal holidays. Access to the base during other times must be requested in writing from the Contracting Officer and will be granted only for extenuating circumstances.
1.11 BASE ACCESS
Access onto and across the grounds shall be as directed by the Government.
Employee parking shall be as directed by the Contracting Officer. Also, the Government may impose restrictions regarding methods and points of contractor access in order to maintain orderly operation of the facility during the construction period.
1.12 TEMPORARY BARRICADES AND FENCES
The Contractor shall furnish, install, and maintain barricades, fences, warning signs, steps, bridges, platforms and scaffolds required for execution of the Contractor's work and to secure hazardous areas and equipment from the general public or the building occupants.
Maintain all temporary facilities and controls as long as needed for the safe and proper completion of the work. Remove all such temporary facilities and controls as rapidly as progress of the work will permit or as directed by the Contracting Officer.
1.13 TEMPORARY CONSTRUCTION FACILITIES
1.13.1 Contractor Office
The Contractor may furnish an office trailer at the project site in a location approved by the Contracting Officer.
1.13.2 Sanitary Facilities
The Contractor is required to furnish and maintain a temporary water closet or privy. The water closet/privy type and location will be approved by the Contracting Officer. The Contractor shall allow every person associated with the project use of the water closet/privy.
SECTION 01 11 00.00 40 Page 3
1.14 AVAILABILITY OF UTILITY SERVICES
The Contractor may use Government utilities in the vicinity of the project area. The Contractor shall not be wasteful of the Government utilities and the Government reserves the right to assess the Contractor for utility use upon discovery of negligence with respect to utility usage. All temporary lines shall be maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner prior to final acceptance of the construction.
1.15 UTILITY SERVICE INTERRUPTIONS
The Contractor shall submit written notification not less than 15 calendar days in accordance of each interruption of each utility and communication service to or within existing buildings and facilities being used by others. No single outage will exceed 4 hours unless approved in writing.
The time and duration of all outages will be coordinated and approved with the using agency by the Contracting Officer.
1.16 PERMITS
1.16.1 Digging Permit
To ensure personnel safety and utility safety when work is to be done below grade, it is the responsibility of the Contractor to obtain an on-base (AF IMT 103) digging permit and a GOPHER ONE digging permit. For an on-base digging permit the Contractor shall provide the Government with not less than 10 calendar days written notice of the intent to perform digging or excavation work to allow the Government the opportunity to locate and mark its utilities which may interfere with the proposed work. For a GOPHER ONE digging permit, the Contractor shall follow standard Minnesota State procedures.
1.16.2 MAC Public Works Permit
If any of the work affects property (buildings, facilities, utilities, etc.) belonging to the Metropolitan Airports Commission (MAC), the Contractor is responsible for obtaining a MAC Public Works Permit prior to starting the work.
1.16.3 Aerospace Clearances
MAC Aerospace Evaluation Application: If any of the work requires a crane, boom truck or any other type of equipment that will affect local aerospace;
the Contractor is responsible for obtaining prior clearance from MAC.
FAA Form 7460-1, Notice of Proposed Construction or Alteration: In addition to obtaining clearance from MAC, the Contractor shall also be required to ensure the necessary coordination and/or clearance is obtained for an approved FAA Form 7460-1 from the Federal Aviation Administration.
1.16.4 Not Used
1.17 PROTECTION OF FACILITIES
The Contractor shall preserve and protect all structures, equipment, pavements and vegetation on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required
SECTION 01 11 00.00 40 Page 4 under this contract. The Contractor shall repair or replace any damage resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. Any repair or replacement shall be accomplished at the expense of the Contractor and to the satisfaction of the Contracting Officer.
1.18 DD FORM 1354 CHECKLIST
Contractor shall complete and provide a completed DD Form 1354 Checklist upon the completion of the project. A copy of the DD Form 1354 checklist will be provided to the Contractor by the Government.
1.19 Material Approval Schedule (AF IMT 3000)
Contractor shall complete and provide a completed AF IMT 3000 Schedule for approval of each material submittal.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 11 00.00 40 Page 5
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
02/10
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of contact personnel; G
SD-04 Samples
Color boards; G
1.2 NOTE USED
1.3 MINIMUM INSURANCE REQUIREMENTS
Procure and maintain during the entire period of performance under this contract the following minimum insurance coverage:
a. Comprehensive general liability: $500,000 per occurrence
b. Automobile liability: $200,000 per person, $500,000 per occurrence for bodily injury, $20,000 per occurrence for property damage
c. Workmen's compensation as required by Federal and State workers' compensation and occupational disease laws.
d. Employer's liability coverage of $100,000, except in States where workers compensation may not be written by private carriers,
e. Others as required by Minnesota law.
SECTION 01 30 00 Page 1
1.4 CONTRACTOR PERSONNEL REQUIREMENTS
1.4.1 Subcontractors and Personnel
Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.2 Identification Badges
Identification badges, if required, will be furnished without charge.
Application for and use of badges will be as directed. Immediately report instances of lost or stolen badges to the Contracting Officer.
1.4.3 Subcontractor Special Requirements
1.4.3.1 Asbestos Containing Material
All contract requirements of Asbestos Containing Materials assigned to the Contractor shall be accomplished directly by a Private Qualified Person (PQP) and first tier subcontractor.
1.4.4 Contractor Personnel Requirements
Failure to obtain entry approval will not affect the contract price or time of completion.
1.4.5 Personnel List
Submit for approval, at least 15 days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:
a. Full Name
b. Date of birth
c. Driver's License Number and State issued
1.4.6 NOT USED
1.4.7 NOT USED
a. NOT USED
b. NOT USED
c. NOT USED
d. NOT USED
e. NOT USED
SECTION 01 30 00 Page 2
f. NOT USED
g. NOT USED
h. NOT USED
i. NOT USED
j. NOT USED
k. NOT USED
l. NOT USED
m. NOT USED
n. NOT USED
o. NOT USED
p. NOT USED
q. NOT USED
r. NOT USED
1.4.8 Passes
Submit requests for personnel access to the Contract Administrator. Passes will normally be issued within 21 days.
1.4.9 Control
Maintain strict accountability over passes. Immediately report to the source of issue, passes missing or lost and the circumstances. If the Contractor has another active contract or one commencing immediately, employees' names may be transferred from one contract to the other. Final payment will not be affected until employees are transferred to another contract or the records are cleared. Furnish a signed letter, countersigned by the source of issue, stating that passes have been turned in.
1.5 SUPERVISION
In accordance with FAR Clause 52.236-7: Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.
1.6 PRECONSTRUCTION CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule prices, shop drawings, and other submittals, scheduling programming, prosecution of the work, and clear expections of the "Interim DD Form 1354" Submittal. Major subcontractors who will engage in the work shall also attend.
SECTION 01 30 00 Page 3
1.7 ELECTRONIC MAIL (E-MAIL) ADDRESS
The Contractor shall establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments in Microsoft, Adobe Acrobat, and other similar formats. Within 10 days after contract award, the Contractor shall provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes, terrorist threats, etc. Multiple email address will not allowed.
It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). The Contractor shall promptly notify the Contracting Officer, in writing, of any changes to this email address.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 30 00 Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 47 PAGES
Repair Life Support, Building 830
01 11 00.00 40 SD-01 Preconstruction Submittals
1.5 GConstruction Progress Schedule
(AF IMT 3064)
1.19 GMaterial Approval Schedule (AF
IMT 3000)
SD-11 Closeout Submittals
1.18 GDD Form 1354 Checklist
1.1 GAF IMT 3065 (Progress Report)
01 30 00 SD-01 Preconstruction Submittals
1.4.1 GList of contact personnel
SD-04 Samples
1.2 GColor boards
01 35 26 SD-01 Preconstruction Submittals
1.6 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.10 GReports
1.10.1 GAccident Reports
SD-07 Certificates 1.7Confined Space Entry Permit 1.7Hot work permit
01 74 19 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 47 PAGES
01 74 19 1.4 G CEVConstruction Waste Management Plan
SD-07 Certificates
1.7.1 G CEVReceipts of Recycled Materials
1.7.1 G CEVReceipts of Solid Waste
01 78 00 SD-03 Product Data
1.3.2 GAs-Built Record of Equipment
and Materials
1.7.1 GWarranty Management Plan
1.7.5Warranty Tags 1.9Final Cleaning 1.4Spare Parts Data
SD-08 Manufacturer’s Instructions 1.5Preventative Maintenance 1.5Condition Monitoring (Predictive
Testing) 1.5Inspection 1.7.1Instructions
SD-10 Operation and Maintenance Data
1.8Operation and Maintenance Manuals
SD-11 Closeout Submittals 1.3.1Record Drawings
02 41 00 SD-01 Preconstruction Submittals
1.11 GExisting Conditions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 47 PAGES
02 41 00 SD-07 Certificates
1.2.1 GDemolition Plan
SD-11 Closeout Submittals 3.2.4Receipts
03 30 00 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Column Forms 1.6.2.1Wall Forms 1.6.2.1Floor Forms
1.6.2.3 GReinforcing steel
SD-03 Product Data 2.4.1Cement 2.4.1.3Portland Cement 2.3.2Ready-Mix Concrete 2.5Reinforcement 2.4.9Epoxy bonding compound 2.2.1Waterstops 2.4.8.3Waterstops 3.14.2Waterstops
SD-05 Design Data
2.3.1 Gmix design
2.3.1.1Calculations
SD-06 Test Reports
1.6.4.1 GConcrete mix design
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 47 PAGES
03 30 00 1.6.4.2Aggregates 2.4.3Aggregates 3.12.2.3Compressive strength tests 3.12.2.5Ion concentration 3.12.2.4Air Content 2.7.4Slump 2.7.1Air Entrainment
SD-07 Certificates
1.6.3.1 GMaterial Safety Data Sheets
SD-08 Manufacturer’s Instructions 2.5.6Steel Bar
05 12 00 SD-02 Shop Drawings
1.4.2.1 GErection Plan
1.4.1 GFabrication drawings
SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.3.2Non-Shrink Grout
SD-06 Test Reports 2.2Bolts, nuts, and washers
SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 2.5Galvanizing 1.4.2.2Welding procedures and qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 47 PAGES
05 30 00 SD-02 Shop Drawings 1.3.3Fabrication Drawings
SD-03 Product Data 2.2Accessories 2.3.1Deck Units 2.1.3.1Galvanizing Repair Paint 2.1.4Galvanizing Repair Paint 2.2.10Mechanical Fasteners 1.3.2Powder-Actuated Tool Operator
SD-05 Design Data 2.3.1Deck Units
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data 2.1studs,joists
SD-07 Certificates 1.4Load-bearing cold-formed metal framing 3.1.1Welds
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars and
Strips
2.5 GMetal Stair System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 47 PAGES
05 51 00 2.2 GStructural Steel Plates, Shapes, and Bars
2.3 GHot-Rolled Carbon Steel Bars
2.6 GProtective Coating
2.7 GSteel Pan Stairs
2.7.4 GSteel Stairs
SD-07 Certificates
1.3 GWelding Procedures
1.3 GWelder Qualification
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
2.1 GIron and Steel Hardware
3.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars and
Strips
3.1 GSteel Shapes, Plates, Bars and
Strips SD-03 Product Data
1.2.1 GStructural Steel Plates, Shapes, and Bars
2.3 GStructural Steel Plates, Shapes, and Bars
1.2.1 GStructural Steel Tubing
2.4 GStructural Steel Tubing
1.2.1 GProtective Coating
2.7 GProtective Coating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 47 PAGES
05 52 00 1.2.1 GSteel Railings and Handrails
2.8 GSteel Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.1 GInstallation Instructions
06 41 16.00 10 SD-02 Shop Drawings 2.10Shop Drawings 3.1Installation
SD-03 Product Data 2.1Wood Materials 2.8Wood Finishes 2.10.7.3Finish Schedule 1.4.2Certification
SD-04 Samples 2.3Plastic Laminates 2.5Cabinet Hardware
SD-07 Certificates 1.4Quality Assurance 2.8Laminate Clad Casework 3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
3.1 GInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 47 PAGES
06 61 16 SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications 1.4.2Certification
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter and Vanity Tops
SD-06 Test Reports 2.1Solid polymer material
SD-07 Certificates 2.3Fabrications 1.4.1Qualifications
SD-10 Operation and Maintenance Data
3.2Clean-up 07 14 00 SD-03 Product Data
2.1Fluid-applied membrane 2.2Membrane primer 2.7Elastomeric sheet 2.9Flexible foam-backed elastomeric sheet 3.3Solvent 3.4.1Moisture meter 2.10Protection board 2.6Bond breaker
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 47 PAGES
07 14 00 SD-11 Closeout Submittals 1.6Warranty 3.6Information Card 3.5Instructions To Government
Personnel 07 21 13 SD-03 Product Data
2.1 GBlock or board insulation
2.2Pressure sensitive tape 2.3Accessories
SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.3.1Adhesive
07 21 16 SD-03 Product Data 2.1Blanket insulation 2.2Sill sealer insulation 2.4Vapor retarder 2.5Pressure sensitive tape 2.6Accessories
SD-08 Manufacturer’s Instructions 3.3.1Insulation
07 42 13 SD-01 Preconstruction Submittals
1.5.3 GQualification of Manufacturer
1.5.4 GQualification of Installation
Contractor
1.8 GWarranty
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 47 PAGES
07 42 13 1.5.1.1 GInstallation Drawings SD-03 Product Data
2.2.1 GWall Panels
2.2.2Factory Color Finish 1.5.5Closure Materials 2.5.4.4Pressure Sensitive Tape 2.5.4.1Sealants and Caulking 1.5.3.1Enamel Repair Paint 1.5.5Accessories 2.5Accessories
SD-04 Samples
2.2.1 GWall Panels
1.5.3.1 GFasteners
2.5.3 GMetal Closure Strips
2.2.2.5 GColor chart
SD-05 Design Data
1.5.1.2 GWind load design analysis
SD-06 Test Reports
3.7.2 GLeakage Tests
1.3.2 GWind Load Tests
2.2.2.6 GCoating
2.2.2.6 GChalking
SD-07 Certificates
1.5.3.1 GCoil Stock
1.5.3.1 GFasteners
1.5.3.1Galvanizing Repair Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 47 PAGES
07 42 13 1.5.3.1Enamel Repair Paint SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-09 Manufacturer’s Field Reports
3.8.1 GManufacturer's Field Reports
SD-11 Closeout Submittals
1.8 GWarranty
1.5.6 GMaintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material 07 60 00 SD-02 Shop Drawings
3.1.15 GGutters
3.1.16 GDownspouts
3.1.17 GExpansion joints
3.1.10 GBase flashing
3.1.11 GCounterflashing
3.1.12 GReglets
3.1.14 GDrip edge
SD-11 Closeout Submittals 3.5Quality Control Plan
07 61 14.00 20 SD-02 Shop Drawings
1.2.5 GRoofing
SD-03 Product Data
2.1 GRoofing panels
2.3Attachment clips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 47 PAGES
07 61 14.00 20 2.4.1Closures 2.4Accessories 2.4.2Fasteners 2.4.3Sealants 2.5Insulation
1.7 Gwarranty
SD-04 Samples 2.1panel 2.4Accessories 2.4.3Sealants 2.2Intermediate Support
SD-05 Design Data 1.5Design calculations
SD-06 Test Reports 3.6Field Inspection 1.3.3Structural performance 1.6.6Finish
SD-07 Certificates 1.6.3Manufacturer's Technical
Representative 1.6.4Installer's Qualifications
2.1 GCoil stock
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-11 Closeout Submittals
3.8 G CEInformation card
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 47 PAGES
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates 1.4.2Inspector Qualifications 2.1Firestopping Materials
1.4.1 GInstaller Qualifications
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.6 GFrames
2.6 GFrames
2.4Accessories 2.8Weatherstripping 2.9Weatherstripping
SD-03 Product Data
2.1 GDoors
2.6 GFrames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 47 PAGES
08 11 13 2.4Accessories 08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.2Accessories 1.5warranty 1.3Local/Regional Materials
SD-04 Samples 2.1Doors
2.3.6.4 GDoor finish colors
SD-06 Test Reports 2.4Cycle-slam 2.4Hinge loading resistance
08 36 13 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 GDoors
2.6 GElectric operators
SD-08 Manufacturer’s Instructions 2.2Doors
SD-10 Operation and Maintenance Data
2.2 GDoors
08 51 13 SD-02 Shop Drawings
2.1 GWindows
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 47 PAGES
08 51 13 1.10Fabrication Drawings SD-03 Product Data
2.1 GWindows
2.2.7.1 GHardware
2.2.3 GFasteners
1.11 GWindow performance
2.3 GThermal-Barrier Windows
2.4 GMullions
2.2.9 GScreens
2.2.2 GWeatherstripping
2.2.7 GAccessories
2.2.4Adhesives 1.11.4Thermal performance
SD-04 Samples 1.4.2.1Finish Sample
SD-05 Design Data
2.1 GStructural calculations for
deflection
1.4.3 GDesign Analysis
SD-06 Test Reports 1.4.4Minimum condensation resistance factor 1.4.4Resistance to forced entry 1.11.2.1Standard Airblast Test
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 47 PAGES
08 51 13 2.1 GWindows 1.7.2Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3 GHardware schedule
2.3.5Keying system
SD-03 Product Data
2.3 GHardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.3 GHardware Schedule
08 81 00 SD-02 Shop Drawings
1.4Installation 1.5Installation 2.3.9Installation 3.1Installation 3.2.2Installation 3.2.3Installation 3.4Installation
SD-03 Product Data 1.7.1Insulating Glass 1.3Glazing Accessories 1.4installation 1.5installation 2.3.9installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 47 PAGES
08 81 00 3.1installation 3.2.2installation 3.2.3installation 3.4installation
SD-04 Samples 1.7.1Insulating Glass 2.3.2Glazing Compound 2.3.6Tape 2.3.3.1Sealant
SD-07 Certificates 1.7.1Insulating Glass
SD-08 Manufacturer’s Instructions 2.3Setting and sealing materials 3.2Glass setting 1.4installation 1.5installation 2.3.9installation 3.1installation 3.2.2installation 3.2.3installation 3.4installation
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 47 PAGES
08 91 00 SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data 2.1.5Cementitious backer units 2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board 3.2.3Glass Mat Water-Resistant
Gypsum Tile Backing Board 2.1.2Water-Resistant Gypsum
Backing Board 2.1.4Glass Mat Covered or Reinforced
Gypsum Sheathing 2.1.4.1Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant 2.1.9Accessories 1.3Certification 2.1.1Gypsum Board 2.1.8Adhesives 2.1.6Joint Treatment Materials 1.6.1Local/Regional Materials
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 47 PAGES
09 29 00 2.1Material Safety Data Sheets SD-10 Operation and Maintenance Data
2.1Manufacturer maintenance instructions
3.8Waste Management 09 30 00 SD-02 Shop Drawings
1.4 GDetail Drawings
SD-03 Product Data
2.1 GTile
2.1 GTile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
2.2.6Reinforcing Wire Fabric 1.2.3Certification
SD-04 Samples
2.1 GTile
1.2.1 GAccessories
1.4 GAccessories
2.5 GMarble Thresholds
2.4 GGrout
SD-07 Certificates
2.1 GTile
2.4 GMortar, Grout, and Adhesive
SD-11 Closeout Submittals 1.2.2Local/Regional Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 47 PAGES
09 30 00 2.1Tile 2.2.6Reinforcing Wire Fabric 3.1Adhesives
09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings
SD-03 Product Data 1.2.5Acoustical Ceiling Systems
SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
SD-06 Test Reports 1.2.1Fire Resistive Ceilings 1.2.2Ceiling Attenuation Class and
Test SD-07 Certificates
2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
09 62 38 SD-03 Product Data
2.1 GStatic-Control Flooring
2.1Accessories 2.1.1.2Adhesives 2.3Adhesives 1.9Warranty
SD-04 Samples
2.1 GStatic-Control Flooring
2.1 GAccessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 47 PAGES
09 62 38 SD-06 Test Reports 1.4Fire Resistance 3.2Moisture, Alkalinity and Bond 3.6Testing
SD-07 Certificates 2.1Static-Control Flooring 2.1Accessories 2.1.1.2Adhesives 2.3Adhesives 1.6Qualifications of Applicator
SD-08 Manufacturer’s Instructions 2.1Static-Control Flooring 2.1Accessories
SD-10 Operation and Maintenance Data
2.1 GStatic-Control Flooring
2.1 GAccessories
09 65 00 SD-02 Shop Drawings
2.10 GResilient Flooring and
Accessories SD-03 Product Data
2.10 GResilient Flooring and
Accessories
2.6Adhesives 2.1Vinyl Composition Tile 2.2Rubber Tile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 47 PAGES
09 65 00 2.3Wall Base 2.4Stair Treads, Risers and
Stringers 1.2.1Local/Regional Materials 1.4Certification
SD-04 Samples
2.10 GResilient Flooring and
Accessories SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance Data
2.10 GResilient Flooring and
Accessories
SD-11 Closeout Submittals 1.2.1Local/Regional Materials 2.10Resilient Flooring and
Accessories 2.6Adhesives
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
2.5 GMoldings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 47 PAGES
09 68 00 SD-03 Product Data
2.1 GCarpet
2.3 GCarpet Cushion
2.5 GMoldings
2.1.1Physical Characteristics 1.2.1Local/Regional Materials 1.2.2Environmental Data
SD-04 Samples
2.1 GCarpet
2.5 GMoldings
2.3 GCarpet Cushion
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates 2.1Carpet 1.5Regulatory Requirements
SD-08 Manufacturer’s Instructions 3.1Surface Preparation 3.4Installation
SD-10 Operation and Maintenance Data
2.1 GCarpet
3.5 GCleaning and Protection
3.7.2Maintenance Service
SD-11 Closeout Submittals 1.2.1Local/Regional Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 47 PAGES
09 90 00 SD-02 Shop Drawings 3.10Piping identification 3.10stencil
SD-03 Product Data 1.4.2Certification 1.9.1Local/Regional Materials 2.1Materials
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets SD-04 Samples
1.11 GColor
SD-07 Certificates
1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions 3.3.1Application instructions 3.6.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1 GCoatings:
10 21 13 SD-02 Shop Drawings
1.2Fabrication Drawings
3.2 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 47 PAGES
10 21 13 SD-03 Product Data 1.2Cleaning and Maintenance
Instructions 2.6Colors And Finishes 2.1.1Galvanized Steel Sheet 2.1.2Sound-Deadening Cores 2.1.3Anchoring Devices and
Fasteners 2.1.5Hardware and Fittings 2.1.4Brackets 2.1.6Door Hardware 1.2.1.1Local/Regional Materials
Documentation 2.2.1Toilet Enclosures 2.2.2Urinal Screens
SD-04 Samples
2.6 GColors and Finishes
2.1.5Hardware and Fittings 2.1.3Anchoring Devices and
Fasteners SD-10 Operation and Maintenance Data
3.6Waste Management Plan 1.2.2Plastic Identification
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 47 PAGES
10 21 13 1.2.1.1Local/Regional Materials Documentation
2.2.1Toilet Enclosures 2.2.2Urinal Screens
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-04 Samples
2.1.2 GFinishes
2.2 GAccessory Items
SD-07 Certificates 2.2Accessory Items
10 44 16 SD-01 Preconstruction Submittals 2.1Manufacturer's Data
SD-02 Shop Drawings 2.1Fire Extinguishers Part 2Cabinets
SD-03 Product Data 2.1Fire Extinguishers Part 2Cabinets 3.2.1Replacement Parts
SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with
Inspection Tag 10 51 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 47 PAGES
10 51 13 2.1 GTypes
1.4 GLocation
3.1Installation 3.2Numbering system
SD-03 Product Data 2.2Material 2.3.3Handles 2.2.3Finish 2.3components 3.1Assembly
SD-04 Samples
1.5.1 GColor chips
12 21 00 SD-02 Shop Drawings 3.3Installation
SD-03 Product Data
2.1 GWindow Blinds
3.3Installation
SD-04 Samples
2.1 GWindow Blinds
SD-06 Test Reports 2.1Window Blinds
SD-08 Manufacturer’s Instructions
2.1 GWindow Blinds
SD-10 Operation and Maintenance Data
2.1 GWindow Blinds
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 47 PAGES
12 48 13 SD-02 Shop Drawings
3.2 GInstallation Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1 GEntrance Floor Mats and Frames
2.2Adhesives and Concrete Primers
SD-04 Samples
2.1 GEntrance Floor Mats and Frames
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Instructions
SD-10 Operation and Maintenance Data
3.2 GProtection, Maintenance, and
Re…
This is the start of the file's text. The full file is on GovTribe.