SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
DESCRIPTIVE CHANGE(S)
Reference Mechanical Drawing #M-602, “SEQUENCE OF OPERATION” note at top of page is hereby removed in it’s entirety.
SECTION I - CONTRACT CLAUSES
The following included by reference have been revised:
| 52.222-35 |
| Equal Opportunity for Veterans |
| SEP 2010 |
| 52.222-36 |
| Affirmative Action For Workers With Disabilities |
| OCT 2010 |
| 52.222-37 |
| Employment Reports on Veterans |
| SEP 2010 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| MAY 2014 |
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Attachment 1 |
| Technical Specifications |
| 941 |
| 16-JUN-2014 |
| Attachment 2 |
| Drawings |
| 94 |
| 16-JUN-2014 |
| Attachment 3 |
| Wage Determination MN36 |
| 8 |
| 25-JUL-2014 |
| Attachment 4 |
| SF Form 24 - Bid Bond |
| 2 |
| Attachment 5 |
| Financial Capability Reference |
| 1 |
to:
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Attachment 1 |
| Technical Specifications |
| 941 |
| 16-JUN-2014 |
| Attachment 2 |
| Drawings |
| 94 |
| 16-JUN-2014 |
| Attachment 3 |
| Revised Wage Determination |
| 8 |
| 15-AUG-2014 |
| Attachment 4 |
| SF Form 24 - Bid Bond |
| 2 |
| Attachment 5 |
| Financial Capability Reference |
| 1 |
| Attachment 6 |
| Asbestos Survey Reinspection Results |
| 7 |
| 14-AUG-2001 |
| Attachment 7 |
| Asbestos LBP Inspection Report |
| 16 |
| 09-SEP-2002 |
| Attachment 8 |
| ACM Analysis Bulk Report |
| 1 |
| 13-DEC-2011 |
| Attachment 9 |
| LBP XRF Data |
| 1 |
| 07-AUG-2002 |
(End of Summary of Changes)