Asbestos Survey Reinspection Results
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Attendance_List_9-3-14.pdf | ||
| Site_Visit_Attendance_List_8-19-14.pdf | ||
| Map_to_Bldg_830_and_729.pdf | ||
| Site_Visit_Attendance_List_8-21-14.pdf | ||
| QUESTIONS-RESPONSES_001.pdf | ||
| 2002_E-E_LBP_XRF_Data_-_Bldg_830.pdf | ||
| Wage_Det_MN36_8-15-14.doc | DOC document | |
| 2002_E-E__Asbestos-LBP_Report_2002.pdf | ||
| 2011_830_Tile-Mastic_results.pdf | ||
| Amendment_0001.doc | DOC document | |
| FA6633-14-B0002_IFB.doc | DOC document | |
| Technical_Drawings.pdf | ||
| Wage_Determination_MN36.doc | DOC document | |
| SF_24_Bid_Bond_Form.pdf | ||
| Financial_Responsibility_Sheet.doc | DOC document | |
| Technical_Specifications.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A.SBESTOS SURVEY REINSPECTION RESULTS
FOR
BUILDING 830
REQUESTED BY
DEPARTMENT OF THE AIR FORCE
AIR FORCE RESERVE COMMAND
934rn LOGISTICS GROUP/LGC
MINNEAPOLIS-ST. PAUL AIR FORCE RESERVE STATION
CONTRACT NUMBER O&S 005073
August 14, 2001
PREPARED FOR
Tom Tangeman Barr Engineering Company
4700 West 77ttt Street Minneapolis, Minnesota 55435
Performed By
Applied Environmental Sciences, Inc.
934t1t Logistics Support Squadron/LGC Building 830
OVll.:RVIEW/RECOMMENDATIONS
The asbestos inspection of Building 830 located on the Air Force Reserve Base, Minneapolis-St. Paul Air Reserve Station, Minnesota~ conducted on December 15, J 998, by Jerry Anderson and Jack Starcevich, certified asbestos building inspectors employed by Applied Environmental Sciences, Inc. (AES). Braun lntertec Corporation performed a 1995 inspection for this building and formulated an Operations and Maintenance Plan. Limited bulk sampling was conducted by AES in September 1999.
AES' sampling results are included in Appendix. I.
The following suspect asbestos-containing building .materials (ACBM) were found in this building and assumed to contain asbestos:
* 12"x 12" floor tile and mastic - 5 types
Materials which were sampled and found to be nonasbestos-containing were not included in the "Asbestos Reinspection Report Results" table. They include:
Gypswn board and joint compound Ceiling tile, 2'x 2'
The previous inspection found no visible ACBM during the survey.
Asbestos abatement projects may have been conducted in this building. These actions have been documented by the Air Force Reserve Civil Engineering department and such documentation is located at the Minneapolis-St. Paul Air Force Reserve Station Civil Engineering building.
Thermal system insulation (TSI) has been discovered inside plaster waJls, above ceilings and under sidewalks during renovation and construction activities. During any renovation or construction activity, it should be assumed that the possibility exists that TSI may be present in these locations. TSI may also be present in locations underground ·where buildings previously existed. These locations are in an entombed existence posing minimal exposure to personnel unless excavated.
All ACBM is in a "not damaged'' condition requiring no remedial action.
As per the 934th Airlift Wing Civil Engine~ring Department, floor tile and suspended ceiling panels installed since the 1988 survey were installed under the Federal Acquisition Regulations which specified the use of nonasbestos-containing materials.
For purposes of this reinspection.. these materials are asswned to be nonasbestos containing and were not included in the reinspection. If the installation date of materials could not be determined the materials are assumed to contain asbestos until testing can show otherwise.
REPORT FOR.~T
The follo\\'ing information explains the sections of Table I found in this report.
TABLE I SECTIONS HEADINGS
*Location
*Homogeneous Material Description of.ACBM
* Initial Assessment:
The origin of the data found in that space is listed.
* ACBM confirmed:
Yes = tested and confirmed to be asbestos-containing No = assumed to contain asbestos
* Quantity of ACBM
* ACBM condition:
ND = Not Damaged D = Damaged SD = Significantly Damaged
* AHERA Assessment Category:
1. Damaged or significantly damaged friable thermal system asbestos containing insulation.
2. Damaged friable asbestos-containing surfacing material.
3. Significantly damaged friable asbestos-containing surfacing material.
4. Dam.aged or significantly damaged friable asbestos-containing miscellaneous material.
5. ACBM with potential for significant damage.
6. ACBM with potential for damage.
7. Any remaining friable ACBM or friable suspect ACBM.
NF = non-friable
ASBESTOS REINSPECTION REPORT RESULTS
Chent: 934th Logistics Support Squadron/LGC ...A.)cation: BUILDING 830 )ate of Reinspection: 12-15-98 Project Number: F98-482
Location Homogeneous Material Floor Tile 12"x 1r
Initial ACBM 1
Assessment Confinned
AES Report NO t es: 1 - A response of "NO" indicates the marerial bas been assumed "ACBM".
Quantity of ACM
No. of Linear Square Fittings Feet Feet
2 - For ACBM Condition: ND = No Damage D = Damage SD= Significant Damage 3 - For AHERA Category: NF = Nonfriable 4 - Location was inaccessible at the time of the survey.
*Materials not found during original survey or the previous reinspections
ACBM2 AHERA3
Condition Category
ND NF
L =--= =---w Ll ...J ........ I- I- (/) a:: :L
~ D z D i=i ...J z w Li... <[
L:l w 1
I _J 1
~ I I I 1 I
611~1
HOMOGENEOUS
MATERIAL($)
830-1 A
830-1 B
830-1 c
830-2 A
830-2 B
830-2 c
MINNEAPOLIS • ST. PAl> FORCE RESERVE STATION BUILDING 930 • SHOP SlJAVIVAL EQUIPMENT/SQ OPS
BULK SAMPLING DATABASE
PERCENT & TYPE OF ASBESTOS
LOCATION DESCRIPTION Material Peroont of total Percent & Type
MEN'S RESTROOM
MEN'S RESTROOM
MEN'S RESTROOM
MEN'S RESTROOM
MEN'S RESTROOM
WOMEN'S RESTROOM
"<"DENOTES LESS THAN
CEILING TILE
2'X2'
WHITE WITH FISSURES AND HOLES
CEILING TILE
2'X2'
WHITE WITH FISSURES AND HOLES
CEILING TILE
2'X2'
WHITE WITH FISSURES AND HOLES
WALLBOARD
GYPSUM BOARD WITH JOINT
COMPOUND
WALLBOARD
GYPSUM BOARD WITH JOINT
COMPOUND
WALLBOARD
GYPSUM BOARD WITH JOINT
COMPOUND
~--. :-:~'.;~~~W~:,'.~: ·;,~:·,.~:.; .;· N9NIH)~~C:ttri~J.'Y·f.{ ~~.~:.':<~<:1:~5J~~~;'
~~~:!·~ ~;>~~,i:: ;~;<;.:{ ~~~1,{;::~J~~m:~~llP ;~:~~r'~<~ .. ·~~:?.:~$~~t~~·~:>~ .:.:~~:.::f\~
... ::·-:·;~i~;;f:~:;~Y~~:·:~::~·~:rr.:.:~h.;~~~~~~~~q.f:::~;~~::.·:~.nf~:~~~~:~~~g?~~::~~
~:~;{:11~1::~?.&r~zr· =: -~- K, ~~, ~~-~~~~·r:>;:··t .. ::~r:~=-~r~~::1·;;>:~;~~·~~}
'-' -;>$<<"'"''''"''"'·"·"' •v· '". •'..ii:jnr;y::i'\~· '"f'i:l'\.' . ,, _.,.,,. '·~. ·~<>'>.'. · . · .,-.:• ~~-,~~<x~~:&':..:;~~::t~:.~~$1~;:>·:*i~.·~~~~!t'>~~q,, . ..,~· ~·~~·; .. ~~~~:~-c:*t~~~'-~{~~f:~~~·(~
File details come from the government source that posted it. Updated .