RFI 02_Repair Boilers_2025.07.16_signed.pdf

PDF 200 KB Posted

Attached to
Repair Boilers, Bldg. 7000
Solicitation number
FA660625B0002
Issued by

About this file

This Request for Information (RFI) document for Solicitation No. FA660625B0002 addresses a boiler repair project for Building 7000 at an Air Force Reserve Command facility. The RFI contains three key questions and responses from the government, including confirmation that the construction project is a first-time requirement with a budget magnitude between $250,000 and $500,000, as specified in accordance with FAR 36.204. The document serves as a preliminary information exchange mechanism for potential contractors, with a note emphasizing that the RFI does not authorize additional work and that contractors must notify the Contracting Officer's Representative if they consider the response a changed condition.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION REPORT (RFI)

RFI NO. PAGE NO.

SOLICITATION TITLE

Contractor's Request for Information

REQUESTED BY: DATE REQUESTED: Potential Cost Impact

[No] Potential Schedule

Impact [No]SUBCONTRACTOR

RFI

SUBJECT:

DRAWINGS

INFORMATION REQUESTED:

ATTACHMENTS FROM CONTRACTOR: (1 attachment)

NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR

INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS

THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE

IN ACCORDANCE WITH CONTRACT PROVISIONS.

QA REVIEWER'S SIGNATURE DATE

RFI FORM

SOLICITATION NO.

FA660625B0002 REPAIR BOILERS, BLDG. 7000

QUESTION 01: Is there an established budget for this requirement?

WARB RESPONSE 01: As stated in Block 10 of the Solicitation and in accordance with FAR 36.204, the Magnitude of Construction is between $250,000.00 and $500,000.00.

QUESTION 02: Has this requirement been contracted out previously, or is this a brand-new contract?

WARB RESPONSE 02:This is a first time requirement.

QUESTION 03: - If awarded before, would it be possible to know the previous contract value?

WARB RESPONSE 03: N/A - this is a first time requirement.

RFI 01_Repair Boilers_2025.07.14
RFI 01_Repair Boilers_2025.07.14P2
RFI 01_Repair Boilers_2025.07.14P3
2025-07-18T12:21:44-0400
DUMAIS.AMY.FURGAL.1515394334

File details come from the government source that posted it. Updated .