05 Repair Boilers Bldg 7000_Addtl Drawings_2025.07.18.pdf
PDF 6 MB Posted
- Attached to
- Repair Boilers, Bldg. 7000
- Solicitation number
- FA660625B0002
About this file
These technical documents are mechanical engineering drawings for an HVAC system upgrade at Hangar B-7000, Westover Air Reserve Base, Massachusetts. The detailed schematic and schedule drawings include comprehensive plans for new mechanical systems, specifically focusing on HVAC, piping, heating, ventilation, and related equipment installations. Key components include air-cooled condensing units, variable refrigerant fan coil units, make-up air units, natural gas pressure regulators, unit heaters, and extensive ductwork and piping configurations for the center and east towers of the facility. The drawings (prepared by GMI and dated July 2023) provide intricate technical specifications for each system component, including equipment schedules detailing manufacturer, model, capacity, electrical requirements, and installation notes.
The drawings are part of a larger project (GMI Project No. 30588.00.01) titled "Install IR Heat B7000" and are specifically labeled as mechanical system upgrade plans for Building 7000. The documents include multiple sheets covering HVAC plans, piping plans, mechanical schedules, fan schedules, air handling unit details, and steam/water schematic diagrams. Each sheet contains precise technical annotations, grid references, and notes about existing conditions and new work requirements, indicating a comprehensive retrofit and expansion of the building's mechanical infrastructure.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALL IR HEAT B7000
YTPM 09-2002
20 7
INSTALL IR HEAT B7000
YTPM 09-2002
20 10
| 1H18 Fuel Cell Wing Tank Ventilation |
| 1H20 Fuel Cell Tank Ventilation Plan |
| M-2.4 Mezzanine East Tower Plan |
| M-4.1 East Tower Schedule |
| M-6 Original Piping Plan |
| M-09 Fuel Cell Area Ventilation |
| M-12 Fuel Cell Area Schedule |
| M-15 Original Heating Flow Diagram |
| M-21 Original Mecahanical Scedules |
File details come from the government source that posted it. Updated .