Hangar Roof Structural Drawings 2.pdf
PDF 4 MB Posted
- Attached to
- Repair Roofs, Hangar 1 & 3 WARB Federal contract opportunity
- Solicitation number
- FA660620R0003
About this file
This federal contract opportunity notice is for repair work on the roofs of Hangar 1 and Hangar 3 at Westover Air Reserve Base in Chicopee, Massachusetts. The project includes seam repair of existing thermoplastic polyolefin roofing membranes and installation of a new permanent fall protection system with anchoring points. The contract will be a firm fixed price award with an estimated period of performance of 300 calendar days from notice to proceed. The solicitation is anticipated in mid-to-late July 2020 as a request for proposal with a thirty-day response period. The opportunity is set aside for total small businesses with a NAICS code of 238160 for roofing contractors and size standard of $16.5 million. Interested offerors must register in the System for Award Management and check the website periodically for amendments as the solicitation and supporting documents will only be distributed electronically. Funds are not presently available and no award will be made until funding is in place.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA660620R00030003.pdf | ||
| Hangar Roof Structural Drawings 1.pdf | ||
| Solicitation Amendment FA660620R00030002.pdf | ||
| Solicitation Amendment FA660620R00030001.pdf | ||
| Wage Determination MA20200003 08.07.2020.pdf | ||
| RFI 1 Repair Barrel Roofs Response.pdf | ||
| Site Visit Sign In Sheet - Repair Roofs.pdf | ||
| TMS 01 Hangar 1 and 3 Cut Edge Sealant Dwg.pdf | ||
| HANGAR 1 ROOF PLAN Dwg.pdf | ||
| HANGAR 3 ROOF PLAN 11-21-19 dwg.pdf | ||
| Hangar 1 SUBMITTAL REGISTER(original).xlsx | XLSX spreadsheet | |
| TMS 07 Hangar 1 and 3 Memmbrane side lap sealant Dwg.pdf | ||
| Solicitation - FA660620R0003.pdf | ||
| Hangar3 SUBMITTAL REGISTER.xlsx | XLSX spreadsheet | |
| TMS 06 Hangar 1 and 3 Continuous strip fastening method Dwg.pdf | ||
| Wage Determinations 3.13.20.pdf | ||
| Hangar 1 SOW package 24 Apr 2020.docx | DOCX document | |
| Hangar 3 SOW package 24 Apr 2020.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .