Hangar 1 SUBMITTAL REGISTER(original).xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Repair Roofs, Hangar 1 & 3 WARB
- Solicitation number
- FA660620R0003
About this file
This document contains a submittal register and solicitation details for a federal contract opportunity to repair roofs at Hangar 1 and 3 at Westover Air Reserve Base. The submittal register outlines required submissions from the contractor, including drawings, specifications, daily reports, inspection reports, warranties, and closeout documents. It also lists the relevant sections of the specifications for each submission. The solicitation will be issued in July 2020 as a firm fixed price contract for roof repairs and a new permanent fall protection system. The work includes seam repair of an existing TPO roof membrane and design and installation of anchoring points for the fall protection system. The estimated value is between $500,000 and $1 million. The solicitation will be a total small business set-aside under NAICS code 238160. Interested parties must register in the SAM database and check the website for amendments. Award is contingent upon available funds, and the government may cancel the solicitation before or after closing.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SUBMITTAL REGISTER | CONTRACT NO | ||||||||||||||||
| YTPM 18-0006 | |||||||||||||||||
| TITLE AND LOCATION | CONTRACTOR | ||||||||||||||||
| REPAIR BARELL ROOF H1 | CONTRACTOR SCHEDULES DATES | CONTRATOR ACTION | APPROVING AUTHORITY | ||||||||||||||
| ACTIVITY NO | TRANSMITTAL NO | Refence section | DESCRIPTION ITEM SUBMITTED | P A R A G R A P H # | CLASSIFICATION GOVT OR A/E REVIER | SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD AUTH/ DATE RCD FROM CNTR | DATE FWD TO OTHER REVIEWER | DATE FWD FROM OTHER REVIEWER | ACTION CODE | DATE OF ACTION | MAILED TO CONTR/ DATE RCD FRM APR AUTH | REMARKS |
| (a) | (b) | c | (d) | "(e)" | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | |
| SOW | |||||||||||||||||
| Prime Contractor Experience Information, Key Players | 2.7.1.1 | G | |||||||||||||||
| Installer Qualifications | 2.7.1.2 | G | |||||||||||||||
| RRC Information | 2.7.1.3 | G | |||||||||||||||
| RRO Qualifications | 2.7.1.4 | G | |||||||||||||||
| Licensed Structural Engineer Info | 2.7.1.5 | G | |||||||||||||||
| Field Investigation Report | 3.30 | G | |||||||||||||||
| Drawings (TPO Repair) | 3.4.2 | G | |||||||||||||||
| As-built Drawings (TPO) | 3.4.3 | G | |||||||||||||||
| Specifications (TPO) | 3.5.1 | G | |||||||||||||||
| Plan analysis (FP) | 3.6.1.1 | G | |||||||||||||||
| Drawings (FP) | 3.6.1.2 | G | |||||||||||||||
| Specifications (FP) | 3.6.1.4 | G | |||||||||||||||
| Catalog Cuts (FP) | 3.6.1.5 | G | |||||||||||||||
| Contractor Review and Approval by PE | 3.6.1.6 | G | |||||||||||||||
| Project Disks | 3.6.1.7 | G | |||||||||||||||
| Register Roof Observer (RRO) Daily Reports | 4.2.4.1 | G | |||||||||||||||
| Register Roof Observer (RRO) Photographs | 4.2.4.2 | G | |||||||||||||||
| Roof Signs | 4.3.1 | G | |||||||||||||||
| Pre-final Inspection | G | ||||||||||||||||
| TPO Membrane Pre-Final Inspection Report | 6.3.1 | G | |||||||||||||||
| Final Inspection | 7.10 | G | |||||||||||||||
| Certificate of inspection by Permanent Fall Protection Manufacturer | 7.2.1 | G | |||||||||||||||
| Close-Out Submittals | 7.3.1 | G | |||||||||||||||
| Warranty (FP) | 12.30 | G | |||||||||||||||
| General Conditions | |||||||||||||||||
| Badge Requests (439 AW Form 1) | 1.2.B | G | |||||||||||||||
| Dig Safe (if required) | 1.30 | G | |||||||||||||||
| Notification Prior to Construction or Demolition (BWP AQ 06) | 1.80 | G | |||||||||||||||
| Scheduling | 1.10 | G | |||||||||||||||
| Hazardous Material Reporting (439 AW Form 20) | 1.15 | G | |||||||||||||||
| Construction/Demolition Waste Management Plan and Reporting | 1.19 | G | |||||||||||||||
| C/D/W Report | 1.19 | G | |||||||||||||||
| Daily Report | 1.21 | G | |||||||||||||||
| Specifications Attachment B | |||||||||||||||||
| SD-02 Shop Drawings | 1.5.2 | G | |||||||||||||||
| SD-03 Product Data | 1.5.2 | G | |||||||||||||||
| SD-04 Samples | 1.5.2 | G | |||||||||||||||
| SD-06 Test Reports | 1.5.2 | G | |||||||||||||||
| SD-07 Certificates | 1.5.2 | G | |||||||||||||||
| SD-08 MFR's Instructions | 1.5.2 | G | |||||||||||||||
| SD-09 MFR's Field Report | 1.5.2 | G | |||||||||||||||
| SD-10 O&M Data | 1.5.2 | G | |||||||||||||||
| SD-11 Closeout Documents | 1.5.2 | G |