QUESTIONS AND ANSWERS RF SITE SURVEY 14 January 26.docx
DOCX document 17 KB Posted
- Attached to
- RF Site Survey / Deadzone Analysis
- Solicitation number
- FA570226Q0008
About this file
This document is a Questions and Answers (Q&A) file for an RF Site Survey and Dead Zone Analysis solicitation issued by the Department of the Air Force Air Combat Command. The solicitation (FA570226Q0008) is a Request for Quotation (RFQ) for commercial items under NAICS code 541990, with a small business size standard of $16.5M. Key technical details include the current radio communication infrastructure using a Motorola P25 ELMR system with 99 active base stations operating on VHF frequencies. The site survey will utilize a 1/4 mile square grid tile for coverage testing, with specific reliability requirements of 95% reliability, 2% bit error rate, and a DAQ (Delivered Audio Quality) of 3.4. The solicitation has been amended multiple times, with the most recent amendment extending the submission deadline to 23 January 2026 at 10:00 AM local time. All potential offerors must be registered in the System for Award Management (SAM) to be eligible for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QUESTIONS AND ANSWERS RF SITE SURVEY 9 January 26.docx | DOCX document | |
| Combo Solicitation RF Site Survey 2.0.docx | DOCX document | |
| QUESTIONS AND ANSWERS RF SITE SURVEY.docx | DOCX document | |
| Combo Solicitation RF Site Survey 1.0.pdf | ||
| RF Site Survey Provisions and Clauses.pdf | ||
| Performance Work Statement_RF Site Survey.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS RF SITE SURVEY / DEAD ZONE ANALYSIS
8 January 2026
· Can you share any report template, if available? None available
· Which frequencies will be used, so we can confirm mobile compatibility? The radio shop issues the handheld radios and designates a frequency channel which is already being implemented.
· Is a RAN scanner required to be connected with the mobiles? No
· Is there an existing system the contractors need to know about? Currently what’s being ran is a P25 ELMR system which the radio shop monitors.
· What is the Number of base stations? Radio shop is currently tracking 99 base stations active on the network.
9 January 2026
· What Manufacturer / model of system is used? Manufacture is Motorola and the models we use are 6500 and 7500. The system we use is the P25 trucking system.
· What is the Number of base stations? Radio shop is currently tracking 99 base stations active on the network.
· What is the approximate size of the coverage test or can you provide a grid size estimate? TBD still waiting on answer 14 January 2026
· What is the approximate size of the coverage test or can you provide a grid size estimate? The test grid tile size is based on statistical analysis using the required reliability, wavelength for operational frequency, and other factors. For our requirements during Army site rollout (95% reliability, 2% BER, DAQ 3.4, etc.) at VHF frequencies, we would end up with a grid tile of 1/4 mile sq.