ASHE22 1012 ADD1 Tech Specs.pdf

PDF 327 KB Posted

Attached to
ASHE 22-1012 DEMO MILITARY WORKING DOG KENNEL, FAC. 620 AND 625, AVIANO AB, ITALY.
Solicitation number
FA568224R0003
Issued by

About this file

This document is a technical specification addendum for the ASHE 22-1012 demolition project of a military working dog kennel at Aviano Air Base in Italy. The addendum outlines the scope of work for relocating electrical and water lines that connect to an existing building. The key details include excavating a trench, installing new HDPE water piping and electrical conduit, as well as installing new circuit breakers. The work is valued between $100,000 and $250,000 and requires the contractor to have a current Statement of Availability (SOA) certification for the relevant work category. A site visit is scheduled for April 10, 2024 and the government reserves the right to cancel the solicitation. Interested firms should use the "add me to the watch list" feature on the solicitation to receive updates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT ASHE 22-1012 Add#1 DATE: Apr 24

31CES/CENM

Technical Specifications

TECHNICAL SPECIFICATIONS FOR

ASHE 22-1012

DEMO MILITARY WORKING DOG KENNEL,

Fac#620&625 area E Addendum#1

Date: Apr 2024

U.S. AIR FORCE

31ST FIGHTER WING

31ST CES/CENM

AVIANO AIR BASE, ITALY

31CES/CENM

1. SCOPE OF ADDENDUM #1:

The purpose of this addendum is to re-connect the Electrical power line and Water line to existing bldg. 621.

2. WORK LOCATION: See below maps.

SITE MAP.

Note: The attached map is indicative, not updated. The location of the underground utilities is uncertain. Contractor shall dig carefully and if necessary, to dig by hand.

31CES/CENM

3. LIST OF WORKS.

3.1 Civil works.

a. Trench excavation 50 cm wide, at the max deep of Mt 1.20 to relocate underground utilities

(Elect. And Water lines). Work includes dig searching to localize the existing utilities.

Restoration to the original conditions.

Lin.Mt.. 35.

b. Concrete manhole, heavy traffic type, cm 50x50 complete with cast iron cover Class B 125.

EA 4.

3.2 Waterline works.

a. Intercept existing waterline; furnish and install pipeline HDPE, PN10, 32mm ID, about length 20

Lin.Mt..; 2ea Concrete manhole already included in item 3.1.b.

work includes;

• Proper welded “T” connection.

• 2ea Intercepting Ball-Valves.

Lin.Mt 20.

3.3 Electrical works.

a. Intercept exiting cable duct coming from bldg. 600 Main Distr. Panel; furnish and install plastic orange pipeline, 100mm Dia; 2ea Concrete manhole already included in item 3.1.b.

Lin. Mt 15.

b. Run a new cable 4x 6 Sqmm from bldg 600 MDP to bldg. 621. Second Distr.Panel Lin. Mt 50

c. New Circuit breaker 4P 32 Amp with Ground Fault protection in bldg. 600 MDP and Connection to bldg. 621 Sec. Distr.Panel.

LS

1. SCOPE OF ADDENDUM #1: