FA568218R00160001.pdf

PDF 217 KB Posted

Attached to
ASHE 18-1058 Repair Fac. 940A for 57RQS Beddown
Solicitation number
FA568218R0016
Issued by

View the file

Other files

File Type Posted
RFI_Q&A.pdf PDF
ASHE_18-1058_Drawings_REV1.pdf PDF
ASHE_18-1058_Technical_Specifications_REV1.pdf PDF
ASHE_18_1058_REV.1_CCEB_Blank.xlsx XLSX spreadsheet
FA568218R0016.pdf PDF
ASHE_18_1058_CCEB_Blank.xlsx XLSX spreadsheet
ASHE_18-1058_Drawings.pdf PDF
ASHE_18-1058_Schedule_of_Material_Submittals.pdf PDF
ASHE_18-1058_Technical_Specifications,_Jan_2018.pdf PDF
Additional_Requirements,_January_2018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1F3A28009A001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

-Replace Technical Specif ications for ASHE 18-1058 Repair Fac.940A for 57RQS w ith Revision 1.

-Replace Technical Specif ication draw ings w ith revised draw ings.

-Extend the closing date for submission of offers.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568218R0016

X 9B. DATED (SEE ITEM 11)

31-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Feb-2018

CODE

31 CONS LGC - F1F3L1

UNIT 6102

APO AE 09604-6102

F1F3L1 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA568218R0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-Feb-2018 04:00 PM to 21-Feb-2018 04:00 PM.

The offeror acceptance period has decreased by 1 from 221 to 220.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 18-1058 REPAIR FAC. 940A FOR

57RQS AREA F, AVIANO AB, AVIANO, ITALY, DATED JAN 2018 - PARAGRAPH 3 OF THE TECHNICAL

SPECIFICATIONS

To:

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 18-1058 REPAIR FAC. 940A FOR

57RQS REVISION 1, AREA F, AVIANO AB, AVIANO, ITALY, DATED FEB 2018 - PARAGRAPH 3 OF

THE TECHNICAL SPECIFICATIONS

CLIN 0002

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 18-1058 REPAIR FAC. 940A FOR

57RQS AREA F, AVIANO AB, AVIANO, ITALY, DATED JAN 2018 - PARAGRAPH 6 OF THE TECHNICAL

SPECIFICATIONS

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 18-1058 REPAIR FAC. 940A FOR

57RQS REVISION 1, AREA F, AVIANO AB, AVIANO, ITALY, DATED FEB 2018 - PARAGRAPH 6 OF THE

TECHNICAL SPECIFICATIONS

CLIN 0003

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 18-1058 REPAIR FAC. 940A FOR

57RQS AREA F, AVIANO AB, AVIANO, ITALY, DATED JAN 2018 - PARTAGRAPHS 4 AND 5 OF THE

TECHNICAL SPECIFICATIONS

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 18-1058 REPAIR FAC. 940A FOR

57RQS REVISION 1, AREA F, AVIANO AB, AVIANO, ITALY, DATED FEB 2018 - PARAGRAPHS 4 AND 5

OF THE TECHNICAL SPECIFICATIONS, AND ALL OTHER ITEMS.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are an integral part of this contract:

a. Attachment 1:

Technical Specifications for ASHE 18-1058 Repair Fac.940A for 57RQS Revision 1, Area F, Aviano AB, Aviano, Italy, dated Feb 2018

- 30 pages including cover page, revised drawings and material submittals form

b. Attachment 2:

Additional Requirements, dated Jan 2018

- 5 pages

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

L-01. OFFER PREPARATION INSTRUCTIONS

To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.

The following documents constitute the offer, failure to submit any of the below documents may be cause for rejection of the offer:

1. PRICE OFFER

(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442.

In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through

K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown forms. The extended amount must equal the whole Euro unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J, Attachment 2, "Additional Requirements”.

(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate Breakdown

Revision 1 shall be returned in their entirety.

2. QUALIFICATION CERTIFICATION

Submit current SOA certification for category OG01 and classification adequate to cover offeror’s amount for projects performance.

3. EXPERIENCE

Submit offeror’s experience with the same work/trades and complexity as the instant requirements. The offeror must submit evidence of two (2) similar projects, in terms of magnitude and works typology, performed within the past 5 years.

(End of Summary of Changes)

File details come from the government source that posted it.