ASHE_18-1058_Schedule_of_Material_Submittals.pdf
PDF 190 KB Posted
- Attached to
- ASHE 18-1058 Repair Fac. 940A for 57RQS Beddown
- Solicitation number
- FA568218R0016
About this file
ASHE 18-1058 Schedule of Material Submittals
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_Q&A.pdf | ||
| ASHE_18-1058_Drawings_REV1.pdf | ||
| FA568218R00160001.pdf | ||
| ASHE_18-1058_Technical_Specifications_REV1.pdf | ||
| ASHE_18_1058_REV.1_CCEB_Blank.xlsx | XLSX spreadsheet | |
| FA568218R0016.pdf | ||
| ASHE_18_1058_CCEB_Blank.xlsx | XLSX spreadsheet | |
| ASHE_18-1058_Drawings.pdf | ||
| ASHE_18-1058_Technical_Specifications,_Jan_2018.pdf | ||
| Additional_Requirements,_January_2018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ASHE 18-1058
PROJECT TITLE
Repair fac#940A for 57RQS - Area F, Aviano AB
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENCE
DATE
SUBMITTAL
NUMBERS CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE
OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M
P
LI
A N
S H
O P
D R
A W
IN
G
A
M P
LE
LO
R
S E
LE
C
T
IO
M
N U
F A
C T
U R
E
’S
C O
M M
E N
D A
T
IO
N
U F
A C
T U
R E
W
R R
A N
T Y
T A
LO
G
D A
P
E R
A T
IN
G
IN
S
T R
U C
T
IO
D S
Q
U A
N T
IT
IE
LC
U
LA
T
IO
DATE CONTRACTOR
NOTIFIED
REMARKS
APPROVED DIS-
APPROVED
3. CIVIL WORKS
3.2 Asbestos disposal report 2
3.8 Vinyl floor 1 1 1
3.10 PVC baseboard 1 1 1
3.13 New doors 1 1
3.18 External paint 1 1 1
4. ELECTRICAL
WORKS
4.4 Thermal-magnetic breaker
250A
4.5 Main elect. panel 1 1
4.7
Secondary elect.panel 1 1
4.9 Exterior light fixture 1
4.11 Elect. Feeding lines 1
4.12 Equipotential copper plates 1 1
SCHEDULE OF MATERIAL SUBMITTALS SUBMISSIONS FORM
PROJECT NUMBER
ASHE 18-1058
PROJECT TITLE
Repair fac#940A for 57RQS - Area F, Aviano AB
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENCE
DATE
SUBMITTAL
NUMBERS CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
LI
E N
U M
B
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE
OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
F
M P
LI
A
N
H
O P
D R
A W
IN
G
M P
LE
LO
R
S E
LE
C
T
IO
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N
U F
A C
T U
R E
W
R R
A N
Y
T A
LO
G
D A
P
E R
A T
IN
G
IN
S
T R
U C
T
IO
D S
Q
U A
N T
IT
IE
LC
U
LA
T
IO
DATE CONTRACTOR
NOTIFIED
REMARKS
APPROVED DIS-
APPROVED
5. MECHANICAL
WORKS
5.4 Stainless steel pipes 1
5.5 Water storage tank 800Lt 1 1
5.6 Twin pumps 1
5.6 Inverter & digit. pressure gage
5.7 Butterfly valves & ball valves 1
5.10 Chillers check-up report 2
6. COMM WORKS
6.1 Wall mount. Splice Box with
splice organizer tray, 12FO
1 1
6.1 F.O. cable 12 str.SM9/125 1 1
6.2 Corning CCH Cassette
Splicing
6.2 CCH panel type SC SM 12
adapters OS2
6. COMM WORKS
(continues)
6.2 Fiber Optic test with power
meter two bands both ends.
1 1
6.3 zip FO cord with SC SM Connectors for Armag trailer
1 1
6.5 24ports patch panel & cable management.
6.6 Wire mesh Cable tray 1
6.7 CAT6 dual outlets. 2
6.7 Cable UTP CAT 6 T568A