Appendix_E_-_57th_HMU_Concept_Furniture_Plans.pdf

PDF 65 KB Posted

Attached to
57th RQS/HMU TEMPORARY FACILITIES LEASE AT MIKE LOOP, AREA F, AVIANO AIR BASE, ITALY
Solicitation number
FA568218R0002
Issued by

About this file

APPENDIX E 57th HMU CONCEPT FURNITURE PLAN

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix F - 57th_HMU Concept Communications Plan.pdf

CVC OSP FOC Path Overview-56_57 HMU v4
Slide Number 1
Slide Number 2
Slide Number 3
Comm req. for 57 RQS Buildings-CSIB-v4
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 6
Slide Number 7
Slide Number 8
Outside Plant Requirements
Outside Plant Requirements
Closures for Cable Splicing in Maintenance Holes.
Splice Connectors.
Labeling.
Shield Bonding Connectors.
Grounding.
Cable Tags.
Cable Terminations.
FOC Maintenance Loop.
New Handholes.
Cable Racks and Cable Rack Supports.
Grounding.
Underground Conduit System.
Composition.
Installation.
Bends and Sealing.
Utility Separation.
Spacers and Tracer Wire.
Entrance Conduits into Existing Maintenance Holes.
Excavation/Building Penetrations.
Conduit Bends or Sweeps.
Mule Tape.
Drawing Records.
As-Built Drawings.
Butterfly Drawings.
Geospatial Deliverables.

Applicable Standards

File details come from the government source that posted it. Updated .