CONSTRUCTION COST ESTIMATE BREAKDOWN REVISION 1

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UUUY 17-1043

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
SUSTAIN EXTERIOR WALLS AND ROOF, MULTI, Revision # 1
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
UUUY 17-1043SAN VITO DEI NORMANNI, ITALY
MATERIAL COSTSLABOR COSTS
LINE ITEM NO.ITEM (1)UNIT OF MEASURE (2)QUANTITY (3)UNIT (4)TOTAL (5)MANHOUR MANDAYS (6)AVERAGE RATE (7)TOTAL (8)OTHER DIRECT COSTS (9)LINE TOTAL (10)
0Bldg. 308
1Paint metal surfacesIT. No.5.1.aS.m.
2Furnish and installation of steel door, dim 90x215 cmIT. No.5.1.b.IEach
3Furnish and installation of steel door, dim. 180x215 cmIT. No.5.1.b.IIEach
Bldg. 30801
4Removal of waterproofing materials, removal and re-installation of lightning protection systemIT. No.5.2.aS.m.
5New roof packageIT. No.5.2.bS.m.
6New metal flashing, 45 cmIT. No.5.2.cL.M.
7New metal gutters, 65 cmIT. No.5.2.dL.M.
8Furnish and installation of new downspoutsIT. No.5.5.eLM
9Paint exterior concrete wallsIT. No.5.2.fS.m.
10Paint external metal surfacesIT. No.5.2.gL.S.
11Furnish and installation of aluminum door, dim. 180x220 cmIT. No.5.2.hEach
12Furnish and installation of new vertical steel ladder with cageIT. No.5.2.iL.S.
13Furnish and installation of new JOINT covers and replacment of existing metal door size 45x45 cmIT. No.5.2.iL.S.
Bldg. 30901
14Removal of waterproofing materialsIT. No.5.3.aS.m.
15New roof packageIT. No.5.3.bS.m.
16New metal flashing 45 cmIT. No.5.3.cLM
17Application of fiber-reinforced smoothingIT. No.5.3.dS.m.
18Furnish and installation of steel doorIT. No.5.3.eEach
Bldg. 30802
19Removal of waterproofing materialsIT. No.5.4.aS.m.
20New roof packageIT. No.5.4.bS.m.
21New metal flashing 45 cmIT. No.5.4.cLM
22Application of fiber-reinforced smoothingIT. No.5.4.dS.m.
23Furnish and installation of steel door, dim. 180x220 cmIT. No.5.4.eEach
Bldg. 309
24Removal of waterproofing materialsIT. No.5.5.aS.m.
25Removal of existing metal grilles on roof; supply and installtion of three metal steps, relocation of wind sensor.IT. No.5.5.bL.S.
26New roof packageIT. No.5.5.cS.m.
27New copper gutters and flashing 100 cmIT. No.5.5.dLM
28Painting and smoothing external surfacesIT. No.5.5.eS.m.
29Painting and repair external concrete columns, beams, lintelIT. No.5.5.fS.m.
30Furnish and installation of new downspoutsIT. No.5.5.gLM
31Paint metal surfacesIT. No.5.5.hS.m.
32Remove and re-install 4 external split units and replace 8 aluminum louversIT. No.5.5.iL.S.
33Furnish and installation of steel door, dim. 90x215 cmIT. No.5.5.L.IEach
34Furnish and installation of steel door, dim. 90x215 cmIT. No.5.5.L.IIEach
Bldg. 44203
35Removal of waterproofing materialsIT. No.5.6.aS.m.
36New roof packageIT. No.5.6.bS.m.
37New metal flashing 35 cmIT. No.5.6.cLM
38Application of fiber-reinforced smoothingIT. No.5.6.dS.m.
39Furnish and installation of steel door, dim. 200x240 cmIT. No.5.6.eEach
Bldg. 81244
40Removal of waterproofing materialsIT. No.5.7.aS.m.
41New roof packageIT. No.5.7.bS.m.
42Paint exterior concrete wallsIT. No.5.7.cS.m.
43Furnish and installation of steel door, dim. 200x250 cmIT. No.5.7.dEach
44New metal flashing 35 cm, 2 louvers dim. 80x60 cm , replacemnt of existing 8/10 thick corrugated sheet metalIT. No.5.7.eLS
TOTAL