F1F3A27116A001 UUUY 17-1043

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make changes as indicated below and in the follow ing pages:

Section A/SF1442 Block 13A: change closing date for receipt of offers;

Section A/SF1442 Block 13D: change the number of days for Government acceptance of offers;

Section B/extended description of Item 0001 and Section J/Attachment 1: replace Technical Specif ications w ith Technical Specif ications Rev 1 dated June 2017 and replace Photos Album and Submitalls w ith Photo Album Rev 1 and Submittals Rev 1;

Section F Clause 52.211-10: change period of performance Section L, provision L-01 Proposal Preparation Instructions, paragraph (b) and (d): replace Construction Cost Estimate Breakdow n w ith Rev 1

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568217R0035

X 9B. DATED (SEE ITEM 11)

29-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jun-2017

CODE

31 CONS LGC - FA5682

VIA PORDENONE 89/B, AREA "E" EDIF. 600

BASE AEREA DI AVIANO

AVIANO (PN) 33081

FA5682 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA568217R0035

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 28-Jun-2017 04:00 PM to 29-Jun-2017 04:00 PM.

The offeror acceptance period has decreased by 1 from 97 to 96.

The contractor period of performance end date has increased by 30 days from 90 days to 120 days.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN: A. TECHNICAL SPECIFICATIONS FOR UUUY 17-1043 SUSTAIN EXTERIOR

WALLS AND ROOFS, MULTI, SAN VITO DEI NORMANNI, BRINDISI, ITALYB. ADDITIONAL

REQUIREMENTS DATED MAY 2017

To:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN: A. TECHNICAL SPECIFICATIONS FOR UUUY 17-1043 SUSTAIN EXTERIOR WALLS AND ROOFS, MULTI, SAN VITO DEI NORMANNI, BRINDISI, ITALY REVISION#1 DATED JUNE

2017B. ADDITIONAL REQUIREMENTS DATED MAY 2017

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

90 dys. ANP 1 31 CES ENGINEER - F1F3A2

PIZZINATO CASSANDRA

UNIT 6110

APO AE 09601-6110

632-7560 FOB: Destination

F1F3A2

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

120 dys. ANP 1 31 CES ENGINEER - F1F3A2

PIZZINATO CASSANDRA

UNIT 6110

APO AE 09601-6110

632-7560 FOB: Destination

F1F3A2

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.232-39 52.233-1 Alt I 52.233-3 252.204-7015 252.232-7008 252.232-7010

The following have been deleted:

252.204-7014 252.229-7008 252.229-7010

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are an integral part of this contract:

a. Attachment 1:

Technical Specifications for Project UUUY 17-1043 SUSTAIN EXTERIOR WALLS AND ROOFS, MULTI, SAN VITO DEI NORMANNI, BRINDISI, ITALY REVISION#1

− 53 pages including cover page, Schedule of Material Submittals Rev 1 and applicable sections of the Master Technical Specifications

b. Attachment 2:

Seon Drawings − 8 sheets

c. Attachment 3:

UUUY 17-1043 Photos Album REV 1 − 9 pages

d. Attachment 4:

Additional Requirements, dated May 2017

- 2 pages

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

L-01. OFFER PREPARATION INSTRUCTIONS

To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.

The following documents constitute the offer, failure to submit any of the below documents may be cause for rejection of the offer:

1. QUALIFICATION CERTIFICATION

Submit current Societa’ Organismi di Attestazione (SOA) certification for category OG01 and/or OS07 and classification adequate to cover offeror’s proposed amount for project performance.

2. EXPERIENCE

Submit offeror’s experience with the same work/trades and complexity as the instant requirement. The offeror shall submit evidence of two (2) contracts for roof and/or paint projects performed within the last five (5) years from the date of proposal that involved substantially the same work/trades and complexity as the instant requirement.

3. PRICE OFFER

(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442.

In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown REV 1 form. The extended amount must equal the whole Euro unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J Attachment 4 “Additional Requirements”.

(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate Breakdown REV 1 shall be returned in their entirety.

L-03 OFFER DOCUMENTATION

All proposal documentation in response to this solicitation must be submitted in the English language, to include summary translations of all documents (SOA, etc).

(End of Summary of Changes)

File details come from the government source that posted it. Updated .