Section 01100 1

SECTION 01100

GENERAL CONDITIONS

PART 1 – APPLICABLE NORMS

1.1 The Italian norms for building works and the instructions of materials suppliers shall be strictly observed for the execution of the works. In addition the general safety regulations for construction and the Base regulation for traffic, accidents and fire fighting shall be observed as follows:

a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system and electrical system.

b. C.N.R.; ASTM; AASHTO norms – Aggregates, bitumen, bituminous mixtures and road works in general.

c. Legislative Decree No. 494 dated 14 August 1996.

d. Legislative Decree No. 528 dated 19 November 1999.

e. CEI norms in force at tender date.

f. UNEL norms in force at tender date.

g. ENPI norms in force at tender date.

h. NEC norms in force at tender date.

i. AFPM 91-210 Contract Safety.

j. AFI 91-202 Safety Program Management.

The manuals and regulations relative to paragraphs i and j, will be available for review at the Engineering Office, Bldg 407 of Aviano Air

Base, during normal working hours, from Monday to Friday, from 0800 to

1700 hrs. Further clarifications regarding the type of materials and the work specified in the Schedule to Work items or indicated in the drawings, will be provided during the site survey scheduled prior to the submittal of proposal.

1.2 CERTIFICATION OF COMPLIANCE WITH ITALIAN LAWS

1.2.1 Static Load Testing

The Contractor shall comply with the pertinent articles of Italian Law

1086 dated 5 November 1971, and all subsequent revisions. The Contractor shall be fully responsible for construction, supervision, static load tests, final testing, and for all costs associated with this procedure.

Article 2 of Law 1086, as amended, requires the static load tests to be performed under the supervision of an engineer or architect registered on the National Professional Rolls of Italy for at least ten years (10).

Prior to performing the tests, submit to the Contracting Officer the names and certified credentials of proposed testing personnel, engineer(s) or architect(s) they propose to perform the static load testing.

2 Section 01100

1.2.2 Mechanical and Electrical Work Certifications

As a condition of final acceptance of the work, the Contractor shall submit to the Contracting Officer a certificate of compliance for all contract work certifying that all electrical and mechanical work complies with Law No. 46 dated 5 March 1990, and that the provided work is adequate and safe for the designated use.

1.2.3 Other Certifications

In addition to the certifications listed above, the Contractor shall provide all other certifications and testing required by Italian Law.

Such certifications may include but are not limited to the following:

a. Certificate of compliance for electrical systems in accordance with CEI regulations and with D.P.R. No.547 dated 27 April 1955 on accident prevention.

b. Certificate of compliance for heating systems above 100,000 kcal/hr in accordance with Italian Law No. 373 dated 30 April

1976.

c. Certificate of compliance for fire prevention systems in accordance with Ministerial Decrees dated 16 February 1982 and 8

March 1985.

d. Certificate for elevator systems test in accordance with Italian

Law No. 1415 dated 24 October 1942.

PART 2 – MATERIALS

2.1 All materials shown on drawings and listed in the Schedule of Work

Item or anyhow necessary for the accomplishment of project will be furnished and installed by the Contractor except those shown on drawings which will be furnished and installed by the U.S.A. Government and installed by the Contractor.

2.2 DEMOLITION AND INTERVENTION WORK ON EXISTING STRUCTURES

During possible partial demolition or intervention operation of bearing structures the Contractor shall provide for the shoring of existing structures, for the safety of personnel and building, being responsible for any accident and/or damage. Shoring will be performed in a way to assure the integral conservation of structures not to be demolished or modified. Shoring shall be inspected by Contracting Officer’s Technical

Representative prior to proceeding with any demolition work of structural elements.

2.3 REMOVED MATERIALS

The materials to be removed, (specified on drawings and/or on the

Schedule of Work Items) shall be handled as follows:

2.3.1 Unsalvageable materials

Shall be transported to public dump in accordance with Italian communal norms in force. The Contracting Officer’s Technical Representative shall determine which materials are unusable. Under no circumstances will the

Contractor attempt to sell or otherwise use such material unless and until he first obtains, the necessary permits, licenses etc. from the

Section 01100 3

Italian Government Officials and will hold the U.S. Government free and harmless from his failure to do so.

2.3.2 Salvageable materials

Shall be loaded, unloaded and stacked at a warehouse of Aviano Air Base.

The Contracting Officer’s Technical Representative shall determine which material is salvageable and the storage location. Maximum distance will be 15 km.

2.3.3 Materials to be reused in the project

Shall be removed with care and stored by the Contractor on site, after inspection of operating state of such fixtures which will be done jointly with the Contracting Officer’s Technical Representative. The Contractor shall be fully responsible for preservation of such fixtures and before their installation, in the location he shall provide for cleaning and rehabilitation work.

2.4 SELECTION OF EQUIPMENT, MATERIALS AND COLORS

The Contracting Officer’s Technical Representative will select equipment, materials and colors from among the charts and factory samples which will be submitted by the Contractor and approved by the Government in accordance with the indications of the project documents. It will be the

Contracting Officer’s Technical Representative’s option to request all samples and catalogues of materials to be incorporated in the project to ensure the satisfactory and proper completion of the work. All samples shall be returned to Contractor.

2.5 SUBMITTALS

This paragraph applies only to those items not subject to the “brand name or equal” provision of the contract and listed in AF Form 3052. Within

15 days from the date of notice to proceed, or in accordance with the prescriptions given by the Contracting Officer, the Contractor shall submit Contracting Officer’s Technical Representative’s approval the data requested by the project documents and listed in the paragraph entitled

“Material Approval” in order to ascertain that the material corresponds to the technical characteristics of the project. The submittals consisting of AF Form 3000, and catalog contracts (4 copies), beside the samples, will be in English or Italian with the English translation attached. The list preparation shall be coordinated with the work schedule keeping in mind that the Government needs at least 15 days for the approval. Every disapproved item shall be resubmitted following the same procedure. A copy of the AF Form 3000 and relative attachments will be returned to the Contractor. No work will be started prior to obtaining the approval for the proposed material and equipment. The approval of submittals does not relieve the Contractor of responsibility for proper application and installation of the items, of other evident or hidden defects. Shop drawings, for electric equipment shall include construction drawings, diagrams and schematics for power circuits and control circuits, and component reference list.

2.6 USE OF BRAND NAMES IN SPECIFICATIONS

Unless otherwise specifically provided on this contract, reference to any equipment, material article or patented process by trade name, make or cat number shall be regarded as establishing a standard of quality and

4 Section 01100 shall not be construed as limiting competition, and the Contractor may, at his option use any equipment, material, article, or process which, in the judgment of the Contracting Officer’s Technical Representative, is equal to that named. The Contractor shall furnish to the Contracting

Officer’s Technical Representative all required data and samples as may be called for the these technical provisions or which the Contracting

Officer’s Technical Representative determines necessary for approval prior to use of the items during work performance.

2.7 “EQUIVALENT” ITEMS PROPOSED BY CONTRACTOR

If the Contractor intends to propose “brand names” different than the ones specified by U.S. Government, he will clearly indicate the

“equivalent” proposed item, the manufacturer, type, catalog No., etc. in the List of Equivalent Proposed Items attached to AF Form 3052 which shall be returned to the Government together with the proposal. Each equivalent item listed shall be supported by the relative technical documentation (catalog cuts, certificates, technical descriptions, calculations, etc.) in order to prove the equivalency of the technical characteristics of the product listed in the project document. Such documentation shall also be attached to the proposal.

2.8 INFORMATION DATA

Prior to work completion date and if expressly requested by project documents will submit the following information data in English and

Italian:

2.8.1 Manufacturer’s literature

Catalog extracts for all items (materials and equipment) furnished, in accordance with project documents.

2.8.2 Parts List

List of furnished items, in accordance with project documents:

a. Item description

b. Current unit price

c. Reference to manufacturing Firm

2.8.3 Manufacturer’s Address

List of materials and equipment suppliers, in accordance with project documents.

a. Firm Name

b. Complete address and telephone number

c. Reference to parts list

2.8.4 Operation and Maintenance Manuals

At work completion date, the Contractor shall submit three (3) copies of operation and maintenance manuals of all equipment installed.

Section 01100 5

2.8.5 Operation Test Reports

In accordance with project documents, prior to work completion date, the

Contractor shall perform balancing and testing of each system installed and will submit three (3) copies of testing report containing recorded data of readings performed during tests.

PART 3 – SITE CONDITIONS

3.1 WORKING HOURS

Normal working hours authorized on base, are from 0800 to 1700 hrs., Monday through Friday. Any working hours different from the authorized hours must be previously approved by the Contracting Officer.

3.2 UTILITY CUT-OFF

When interruption of existing utilities is deemed necessary for the installation of the lines or equipment, the Contractor shall submit a written request, to the Contracting Officer of his authorized representative for approval ten (10) days prior to his scheduled starting of work. For the electrical cut-off the request shall be submitted (10) ten days prior the scheduled starting of work. Such interruption shall not be started before receipt of the approved request, nor shall interruptions request be submitted at the end of the week (from Friday through Sunday). The request shall state the duration of interruptions and the description of work to be done.

3.3 STORAGE SHED

It will be Contractor’s option to provide one or more storage sheds to store materials and work tools. The available area, for the assembly of such shed, shall be indicated by the designated representative of the

Contracting Officer’s Technical Representative. At work completion the shed shall be disassembled and the area shall be restored to its original condition.

3.4 AIRFIELD SAFETY TRAINING

The Contractor shall contact Airfield Management to receive flightline driver and airfield safety training prior to start of any work beginning on the flightline.

3.5 TRANSPORTATION OF PERSONNEL AND MATERIALS

It will be the Contractor’s responsibility to transport the personnel to and from the job site and to load, transport, unload and place all supplies, materials and equipment involved in this contract.

3.6 UTILITIES

Electric power, existing grounding system and water available in the area, will be made available to the Contractor by the U.S. Government.

Connections and disconnections will be at Contractor’s expense and utilities are to be restored to their original condition at no extra cost to the Government. All damages caused, if any, to the existing utilities will be repaired immediately at Contractor’s expenses, also in case that such repairs are made by Government’s personnel and as directed by the

6 Section 01100

Contracting Officer’s Technical Representative. Before starting the works, the Contracting Officer will indicate the point wherefrom water and electric power will be taken. The Contractor will be entitled to provide for himself, if desired, a generating set, and his own expense.

The electrical characteristics of available power will be indicated in project documents.

3.7 TOILET FACILITY

The toilet facilities available in the vicinity of site of work may be used by Contractor’s personnel provided there are no instructions to the contrary in the project documents.

3.8 EXCAVATIONS

The Contractor shall initiate no excavation work prior to receiving an approved AF Form 103. This form will be prepared by U.S. Government personnel.

PART 4 - LABOR

All installation and construction operations, calibrations and tests during service, etc, shall be performed in a workmanlike manner by skilled tradesmen being qualified to perform the most difficult operations pertaining to their respective craft. The use of common labor for operations normally assigned to skilled tradesmen will not be accepted.

PART 5 – DEFINITIONS

As used throughout this master specification set the terminologies used such as: project, drawings, project documents and documents mean the additional specifications. Schedule of Work Items, Drawings and other documents which compose the specific individual project to be performed and for which a proposal is solicited separately.

PART 6 - ORDER OF PRECEDENCE

In case of conflict between this master specification set and the individual project documents, the difference shall be resolved by giving precedence to the individual project documents.

-- End of Section --

ASHE 10-1102

SECTION 01101/R

SECTION 01101/R

PROJECT SIGN

On page 2 change the name of Project on the sign as follows:

“ End of Section”

ASHE 10-1102

CNS VISITOR CENTER AT GATE 9, FAC. 14647

AREA F, AVIANO AIR BASE, AVIANO, ITALY

Section 07220 1

SECTION 07220

ROOF INSULATION

PART 1 - GENERAL

1.1 APPLICABLE PUBLICATIONS

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ITALIAN NATIONAL INSTITUTE FOR THE UNIFICATION OF STANDARDS (UNI)

PUBLICATION

UNI 4157 (1987) Building. Bitumen for roofing.

Sampling and acceptance limits.

UNI 6541 (1969) Glass fiber materials for thermal and acoustical insulation. Resin bonded slabs. Determination of the Compressive

Requirements.

UNI 7891 (1978) Insulating materials.

Determination of thermal conductivity by means of the heat flow meter method.

UNI EN 13165 (2003) Thermal insulation products for buildings - Factory made rigid polyurethane foam (PUR) products –

Specification.

UNI EN 12086 (1999) Thermal insulating products for building applications - Determination of water vapor transmission properties.

UNI EN 1604 (1999) Thermal insulating products for dimensional stability under specified temperature and humidity conditions.

UNI EN 826 (1998) Thermal insulating products for compression behavior.

UNI EN ISO 845 (1997) Cellular plastics and rubbers.

Determination of apparent (bulk) density.

Ministerial Decree 26.06.1984 Fire behavior of the board coating.

1.2 Insulation system over concrete slab shall be composed of:

a. Vapor barrier fastened to concrete slab

b. Insulated rigid combined board and clay tile anchoring.

1.3 SUBMITTALS

2 Section 07220

1.3.1 Samples

Submit one sample of each type of proposed insulating material. Also submit two samples each of nails and mechanical fasteners, when used to apply insulation.

1.3.2 Test Reports

Submit certified copies of test reports for test determining:

a. Flame spread and smoke developed ratings for insulation.

b. Resistance to the steam vapor diffusion.

c. Thermal conductivity.

1.3.3 Manufacturer’s Certificates of Conformance or Compliance

Submit certificates for the following:

a. Roof insulation

b. Steep asphalt

c. Adhesive

1.3.4 Manufacturer’s recommendations

Submit two current copies of insulation manufacturer’s recommendations for the following:

a. Spacing of fasteners for portion of vapor barrier in contact with concrete slab.

b. Application of adhesive for insulation

c. Minimum thickness of insulation for steel decks

1.4 DELIVERY AND STORAGE

1.4.1 Delivery

Deliver materials to the site in original sealed containers or packages bearing manufacturer's name and brand designation. Where materials are covered by a referenced specification, containers or packages shall bear specification number, type and class as applicable. Each container of asphalt shall bear flash point (FP), equiviscous temperature (EVT) and finished blowing temperature (FBT) or this information shall be shown on the accompanying bills of lading. Deliver materials in sufficient quantity to allow continuity of work.

1.4.2 Storage

Store, handle, and install materials in a manner to protect them from damage and from wetting and moisture absorption during entire construction period. For 24 hours immediately before laying, store felt rolls on ends in an area maintained at a temperature no lower than 10 degrees Centigrade. Replace damaged material with new material.

1.5 ENVIRONMENTAL CONDITIONS

Do not install roof insulation during inclement weather or when air temperature is below 4 degrees Centigrade or is expected to go below 4 degrees Centigrade, within 24 hours after installation, or when there is ice, frost, or dampness visible on the roof deck.

Section 07220 3

1.6 PROTECTION OF PROPERTY

1.6.1 Flame-Heated Equipment

Locate and use flame-heated equipment so as not to endanger the structure or other materials on the site or adjacent property. Do not place flame-heating equipment on roof. Provide and maintain fire extinguishers.

1.6.2 Protective Coverings

Install protective coverings at paving and building walls adjacent to hoist and kettles prior to starting the work. Lap protective coverings at least 15 centimeters, secure against wind, and vent to prevent collection of moisture on covered surfaces. Maintain protective coverings in place for the duration of roofing work.

1.6.3 Special Protection

Provide approved special protection, or avoid heavy traffic, on completed work when ambient temperature is above 26 degrees Centigrade.

1.6.4 Drippage of Bitumen

Seal joints in deck as necessary, to prevent drippage of bitumen into building or down exterior walls.

1.6.5 Damaged Work and Materials

Restore work and materials damaged during the handling of bitumen and the installation of materials to original condition or replace with new materials.

1.7 FIELD TEST

The following tests shall be performed prior to performing any roofing work. Perform one test per 100 square meters of roof.

1.7.1 Tests for Surface Dryness, Concrete Deck.

a. Foaming: When poured on the surface to which insulation is to be applied, one pint of the bitumen, when heated in the range of 260 to 290 degrees Centigrade, shall not foam upon contact.

b. Strippability: After the bitumen used in the foaming test application has cooled to ambient temperatures, the coating shall be tested for adherence. Should any portion of the sample be readily stripped clean from the surface, the surface shall not be considered dry and application shall not be started. Should rain occur during application, the work shall be stopped and shall not be resumed until the surface has been tested by the method above and found dry.

PART 2 - PRODUCTS

2.1 MATERIALS

4 Section 07220

Materials shall conform to the respective specifications and standards and to requirements specified herein.

2.1.1 Roof Insulation

2.1.1.1 Roof insulation shall be the following materials:

a. Foamed extruded polystyrene board:

Density 33-35 kg/cm

Thermal conductivity at 20°C 0.025 W/mK

Compressive strength 3 kg/sq.cm

Fire behavior Class 1

Water absorption 0.1%

Resistance to the steam migration 100-225

b. Rigid insulated combined board for clay tile installation.

Board shall have the following characteristics:

Clay tile holder profile

- Galvanized steel profile 0.65 mm thick

- Zinc coating 275 gr/sq.m

- Breaking load 41 kg/mm

Insulated board characteristics

- Closed cell foamed polyurethane

- Thermal conductivity = 0,028 W/m.K.

- K Value 0.36 kcal/sq.m °Ch

- Density 35 kg/cm

- Compressive strength 1 kg/sq.cm

- Resistance to bending stress 2.5 kg/sq.m

- Resistance to the steam spreading = 50

- Fire reaction Class 1

2.1.1.2 Cants and Tapered Edge Strips

Preformed cants and tapered edge strips shall be of the same material as the roof insulation, unless unavailable. If cants or edge strips of the same material as the roof insulation are unavailable, provide preservative treated wood or rigid perlite board cants and edge strips.

2.1.2 Asphalt Primer: UNI 4157.

2.1.3 Steep Asphalt

Shall meet the following requirements:

Minimum Maximum

Softening point, deg. C 85 96

Flash point, deg. C 225 -- --

Penetration, units:

at 0 deg. C 6 --at 25 deg. C 15 35 at 46 deg. C -- 90

Ductility at 25 deg. C, cm. 2.5 --

Solubility in trichloroethylene, 6% 99 --

2.1.4 Asphalt Roof Cement

Section 07220 5

Shall be asbestos-free and suitable for trowel application to roofing materials and flashings.

2.1.5 Asphalt-saturated Felts

Desaturated moisture free felts weighing 250 grams per square meter shall have perforated 1.5 millimeter diameter holes 25 millimeters on center in each row and 12 millimeters between rows. Felts shall be saturated with

350 grams per square meter. Asphalts shall be self-healing, adhesive, and ductile type. Asphalt roof cement shall conform to the following composition limits:

Minimum Maximum

Moisture % -- 3.0

Nonvolatile Matter, % 70.0 --

Mineral and/or other 15.0 40.5 stabilizers, %

Asphalt % 35.0 65.0

Asphalt roof cement shall meet the following physical requirements:

a. Uniformity: A thoroughly stirred sample shall show no separation of solvent or settling that cannot be overcome by moderate stirring after standing for 72 hours at room temperature in a closed container.

b. Workability: The cement shall be of a consistency that will spread readily and permit trowel smooth coatings, 2 to 3 mm thick, on prepared roofing, saturated felt, and metal surfaces at ambient temperatures above 10 degrees C.

c. Behavior at 60 Degrees C: The cement shall show no evidence of blistering, and sag or slide shall be no greater than 6 mm.

d. Pliability at 0 Degrees C: There shall be no cracking or separation of the cement from the metal.

2.1.6 Nails and Fasteners

Nails and fasteners shall be flush-driven through flat metal discs of not less than 35 millimeter diameter. Metal discs may be omitted when one-piece composite nails or fasteners with heads not less than 25 millimeter diameter are used. Minimum withdrawal resistance of nails or approved fasteners shall be 20 kilograms each in the specific decks, when driven, except for fasteners specified herein for steel decks. Furthermore nails and fasteners shall be in compliance with the selected insulated materials manufacturer’s specifications.

2.1.6.1 Fasteners for Concrete

Use approved special self-clinching fasteners.

2.1.6.2 Fasteners for Steel Decks

6 Section 07220

Use approved hardened penetrating type fasteners for securing insulation to steel decks. Fasteners shall be designed to be driven through roof deck. Length of fasteners shall be governed by thickness of insulation.

Holding power shall not be less than 55 kg per fasteners; or shall withstand an uplift pressure of 270 kg per square meters when tested in accordance with an Uplift Pressure Test. Furthermore fasteners shall be in compliance with the selected insulated materials manufacturer’s specifications.

2.1.7 Metal Discs

Flat discs or caps of zinc coated steel not lighter than 5/10 millimeter and not less than 35 millimeters diameter. Disc shall be formed to prevent disking. Bell or cup-shaped caps are not acceptable.

PART 3 - EXECUTION

3.1 CONDITION OF SURFACES

3.1.1 Inspection of Surfaces

Surfaces on which vapor barrier and insulation are to be installed shall be clean, smooth and dry. Surfaces receiving vapor barrier shall also be free of projections which might puncture the vapor barrier. Condition of surfaces shall be inspected and approved by the Contracting Officer’s

Technical Representative immediately before installation is started.

3.1.2 Preparation of Surfaces

Check roof deck surfaces, including surfaces sloped to roof drains and outlets, for defects before work is started; correct defects and inaccuracies in roof deck surface to eliminate hollow and low spots.

Examine steel decks to assure that panels are properly secured to structural members and to each other and that surfaces of top flanges are flat or slightly convex, and are without stiffening grooves.

3.2 APPLICATION

Keep roof insulating materials dry before, during and after installation.

Keep insulation 12 millimeters clear of vertical surfaces penetrating and projecting from the roof surface.

3.2.1 Vapor Barrier

Install vapor barrier in direct contact with concrete deck surface.

Vapor barrier shall consist of one ply of asphalt-saturated felt weighing

700 grams per square meter. Prime concrete deck with asphalt primer and solid mop the asphalt base sheet, lap each sheet 100 millimeters over the preceding sheet. Provide end laps not less than 100 millimeters and stagger laps a minimum of 300 millimeters. Cement together side and end laps with a solid mopping of steep asphalt. Extend 200 millimeters up roof curbs and strip flash at metal flashing flanges.

3.2.2 Temperature of Steep Asphalt

When installing insulation, apply asphalt when temperature of asphalt is within 5 degrees Centigrade of equiviscous temperature (EVT). Do not heat asphalt to or above flash point (FP). Do not heat asphalt above the

Section 07220 7 finish blowing temperature (FBT) for longer than 4 consecutive hours. Use thermometers to check temperatures during heating and application. Have kettlemen in attendance at all times during the heating process to insure that maximum temperature specified are not exceeded.

3.2.3 Wood Nailers

Verify prior to installation of insulation that nailers the same thickness as insulation have been provided at eaves, edges, curbs, walls, and roof openings for securing cant strips, gravel stops, gutters and flashing flanges.

3.2.4 Insulation

3.2.4.1 Insulation Installation

Install insulation directly over the vapor barrier. Lay insulation so that end joints of each course break with those of adjoining courses.

When using multiple layers insulation, joints of each succeeding layer shall be parallel and broken in both directions with respect to the layer below. Firmly embed each layer in a solid steep asphalt mopping; mop only sufficient area to provide complete embedment of one board at a time.

Use not less than 1 kilograms of asphalt per square meter of roof slab for mopping of insulation in place, except for the layer of insulation in contact with steel deck which shall be ribbon or strip-mopped.

Furthermore the installation of the insulating system shall be in compliance with the instructions of the selected roof metal covering manufacturer.

3.2.4.2 Insulation on Poured Concrete Decks

Solidly apply asphalt primer at the rate of one half liter per square meter of roof surface.

3.2.4.3 Insulation on Steel Deck

Strip-mop supporting surface of steel deck at the rate of one half liter of steep asphalt per square meter of roof surface. Apply steep asphalt in ribbons parallel to the ribs on every flange of steel deck for 150 mm rib spacing. On decks with 200 mm rib spacing, apply two ribbons on each flange. Do not permit steep asphalt to flow into ribs of decking. Place insulation while the asphalt is still hot and fluid. Insulation joints shall occur on solid bearing surfaces only, not over open ribs. When multiple layers of insulation are used, mop in the second layer and all succeeding layers as specified herein for mopping layers of insulation in place.

3.2.4.4 Fastening of Insulation on Steel Decks

Provide penetrating-type fasteners in addition to applying steep asphalt for one meter wide strip around perimeter of steel decks regardless of roof slope. Unless approved otherwise, install fasteners in two rows spaced 500 mm apart, staggered and spaced in each row not to exceed 300 mm on centers. Engage fasteners by driving them into top flange of steel deck. If multiple layers of insulation are provided to meet the conductance value or other requirements specified herein, secure first layer with fasteners in addition to mopping, and mop subsequent layers securely in place. Fastening shall conform to the selected insulating system manufacturer’s instructions.

8 Section 07220

3.2.4.5 Cant strips

Where indicated, provide cant strips at intersections of the roof with walls, parapets and curbs extending above the roof. The face of cant strips shall have an incline of 45 degrees. Cant strips shall bear on the wood nailers and fit flush against vertical surfaces. Where possible, nail cant strips to adjoining surfaces. Where cant strips are installed against non-nailable materials, install cant strips in a heavy mopping of steep asphalt or set in asphalt roof cement.

3.2.4.6 Tapered Edge Strips

Where indicated, provide edge strips in the right-angle formed by the junction of the roof and wood nailing strips that extend above the level of the roof. Edge strips shall be tapered from top of wood nailing strips to approximately 3 mm at a slope of 80 mm per meter. Install edge strips flush against vertical surfaces of wood nailing strips. Where possible, nail edge strips to adjoining surfaces. Where installed against non-nailable materials, install edge strips in a heavy mopping of steep asphalt or set in asphalt roof cement.

3.3 PROTECTION OF APPLIED INSULATION

Completely cover each day's installation of insulation with finished roofing specified in Section 07321, "Clay Roofing Tiles." Protect open ends of each day's work with temporary water cut-offs then remove when work is resumed. Protect open spaces at curbs, scuttles, and expansion joints, until permanent roofing and flashing is applied. Storing, walking, wheeling, or trucking will not be permitted directly on insulation or on roofed surfaces. Provide smooth, clean board or plank walkways, runways and platforms near supports, as necessary, to distribute weight to conform to indicated live load limits of roof construction.

Section 08110 1

SECTION 08110

STEEL DOORS AND FRAMES

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

COMMITTEE FOR THE STANDARDIZATION OF EUROPE (CEN)

EN 9774 (1990) Thermal Insulation Materials -

Application Categories and Basic

Requirements - Guidelines for the

Harmonization of International Standards and Other Specifications.

INTERNATIONAL STANDARDS ORGANIZATION (ISO)

ISO 834 (1975); Fire Resistance Tests – Elements of Building Construction; Amendment 1:

1979; Amendment 2: 1980.

ISO 3008 (1976) Fire-Resistance Tests - Door and

Shutter Assemblies.

ISO 3009 (1976) Fire Resistance Tests - Glazed

Elements.

ISO 4898 (1984) Cellular Plastics - Specification for Rigid Materials Used in the Thermal

Insulation of Buildings

ISO 8272 (1985) Doorsets - Air Permeability Test.

ISO 5925/1 (1981) Fire Tests - Evaluation of

Performance of Smoke Control Door

Assemblies - Part 1: Ambient Temperature

Test.

PUBLICATIONS:

UNI 7961 (1987) Buildings, Doors, Criteria for

Classification.

UNI 7962 Buildings, Doors, Terminology and

Symbology.

ITALIAN/EUROPEAN HARMONIZATION STANDARDS (UNI EN)(UNI ENV)(UNI EN ISO)

UNI EN 951 (2000) Door Leaves - Method for

Measurement of Height, Width, Thickness and Squareness.

2 Section 08110

UNI EN 952 (2000) Door Leaves - General and Local

Flatness Measurement Method.

UNI EN 948 (2000) Hinged or Pivoted Doors, Determination of the Resistance to Static

Torsion.

UNI EN 10142 (2002) Continuously Hot Dip Zinc Coated

Low Carbon Steel Sheet and Strip for Cold

Forming - Technical Delivery Conditions, Including Amendment 1, (1995).

UNI EN 1634-1 (2001) Fire Resistance of Doors and

Locking Devices - Tests Fire Rated Doors and Locking Devices.

ITALIAN LAWS

D.M. 14 December 1993 Technical Procedure Norms for the Fire

Resistance Rating and Door and Other

Closing Elements Homologation. Subsequent

Modifications and Integrations.

1.2 SUBMITTALS

Submit the following:

1.2.1 Shop Drawings

Doors

Frames

Accessories

Show elevations, construction details, metal gages, hardware provisions, and installation details.

Doors Schedules

Frames Schedules

Submit door and frame locations, architectural door number, blast resistant fire-rating, and indication of the construction details referring to the submitted shop drawings.

1.2.2 Product Data

Accessories

Submit manufacturer's descriptive literature for doors, frames, and accessories. Include data and details on door construction, panel(internal) reinforcement, insulation, and door edge construction.

1.2.3 Samples

Section 08110 3

Factory-applied enamel finish

Where colors are not indicated, submit manufacturer's standard colors and patterns to the Contracting Officer’s Technical Representative for selection.

1.2.4 Design Data

Structural calculations for blast loads

1.2.5 Test Reports

Resistance to blast loads

1.2.6 Certificates

Submit copies of certificates from recognized testing agencies indicating compliance with requirements.

1.3 QUALITY ASSURANCE

1.3.1 Reinforcing Coordination

Contractor shall coordinate between the hardware and door manufacturers to

Ensure required reinforcing of door assemblies is provided at time of fabrication for required hardware including, but not limited to, locksets, hinges, fastening devices and closers.

1.3.2 Rated Assembly Coordination

Contractor shall coordinate selection of steel door and frame materials and products specified herein with door hardware to ensure that fire rated and/or blast resistant assemblies meet all U. S. and Italian related requirements.

1.3.3 Manufacturer Qualifications

Obtain steel doors and frames through one source from a single manufacturer

1.4 PERFORMANCE REQUIREMENTS

1.4.1 Blast Resistance Criteria

Design and fabricate exterior blast resistant, frames, doors and hardware to resist the dynamic blast load indicated. Refer to Section 08120

“Aluminum Doors, Frames and Sidelights” for the loads to be applied.

1.4.2 Fire Resistance Criteria

4 Section 08110

Doors and frames shall be designed and constructed in compliance with REI classification as shown on drawings.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver doors, frames, and accessories undamaged and with protective wrappings or packaging. Strap knock-down frames in bundles. Provide temporary steel spreaders securely fastened to the bottom of each welded frame. Store doors and frames on platforms under cover in clean, dry, ventilated, and accessible locations, with 6 mm airspace between doors.

Remove damp or wet packaging immediately and wipe affected surfaces dry.

Replace damaged materials with new.

2.1 STEEL DOORS

UNI 7961 and UNI 7962 except as specified otherwise. Prepare doors to receive hardware as specified on contract drawings. Undercut where indicated. Exterior doors shall have top edge closed flush and sealed to prevent water intrusion or connection. Doors shall be 45 millimeters thick, unless otherwise indicated. REI rated doors shall be 65 millimeters thick, unless otherwise indicated by the selected door manufacturer.

2.1.1 Door Construction

Doors shall be composite flush type, constructed of two outer sheets with edges continuously welded and finished flush, fully welded seamless construction with no visible seams or joints on faces. All welds shall be ground, filled and dressed smooth and flush with the surface. The outer face sheets shall be reinforced with interlocking vertical channels of "Z" members. Tops and bottoms of exterior doors shall have continuous channel closures 1.5 mm thick welded to the face sheets.

Close the tops and bottom of interior doors with a recessed channel end closure or a flush end closure treatment, 1.5 mm thick minimum.

Resistance stiffen and sound deaden all doors.

2.1.1.1 Internal Door Construction

At time of fabrication (at the factory) weld additional metal reinforcing into the interior of door for mounting of mortised and surface-applied hardware. Provide frame reinforcement for hinges, door closers, and for locksets. Provide one of the following:

a. Continuous vertical stiffeners of not lighter than one mm steel spaced not more than 150 mm apart and spot welded to both face sheets (or face panels) at intervals not greater than 150 mm.

b. An inner grid system of vertical and horizontal members with rectangular/square cross-sections of not lighter than one mm steel, welded or interlocked for maximum strength, spaced not to exceed and average of 300 mm in either direction, and spot weld to both face sheets at intervals not greater than 150 mm.

c. Continuous horizontal stiffeners of not lighter than one mm steel spot welded to both face sheets (or face panels) at intervals greater than 150 mm.

Section 08110 5

d. A continuous, formed sheet steel truss core, full height and width, spot welded to face sheets at intervals not greater than

150 mm in both directions.

2.1.2 Door Construction Duty

2.1.2.1 Heavy Duty Doors (HD)

Steel sheet face panels thickness shall be as shown on drawings, seamless, with vertical steel stiffeners, of 2 mm thick spaces 150 mm o.c.

with the space between the stiffeners filled with insulation core as specified in paragraph "INSULATION CORES". Provide heavy duty interior and exterior metal doors unless indicated otherwise.

2.1.2.2 Extra Heavy Duty Doors (EHD)

Face panels of 2.0 mm thick sheet steel, seamless with 2.75 mm thick vertical steel stiffeners with the space between the stiffeners filled with insulation core as specified in paragraph "INSULATION CORES."

2.1.3 Door Construction Tolerances

Provide doors with the following minimum tolerances:

a. Flatness: UNI EN 952. Measurement repeated on both sides of door, tolerances below worded with door standing up in final hung position.

(1) Horizontal Centerline: Measure from a 1830 mm straight edge placed on the vertical center line of the door. Distance cannot be more than plus 4.76 mm minus 0 mm.

(2) Horizontal Edges: Measure from a 1830 mm straight edge when placed 25 mm in from and parallel to the lock and hinge edge. Dimension can not vary more than plus or minus 1.58 mm.

(3) Vertical Centerline: Measure from a straight edge 50 mm less than the width of the door on the horizontal centerline. Dimension shall have not variance from flat.

b. Squareness: UNI EN 951. Measured diagonally from corner to corner across the face of the door, the two dimensions shall not vary more than plus or minus 1.58 mm.

c. Door Thickness: Thickness for a 45 mm to 60 mm door shall not vary more than plus or minus 1.58 mm.

d. Door width or Height: Door width or door height shall not vary more than plus or minus 1.19 mm.

e. Torsion Deformation: UNI EN 948.

2.1.4 Blast Resistance Fabrication

Fabricate exterior blast resistant doors and frames similar to requirements specified in "Extra Heavy Duty Doors" except provide additional reinforcing and heavier thickness metal as required to meet

6 Section 08110 requirements specified in paragraph entitled "Blast" Resistance Criteria:

herein.

2.2 AVAILABLE MANUFACTURERS

Products manufactured by the following generally meet the requirements of this specification:

a. Standard Metal Doors, Fire Doors and Frames

NINZ FIREDOORS DI K. NINZ & CO. s.a.s.

Via Negrelli, 17

39100 Bolzano

Tel: 0471/92-1668

Fax: 0471/93-4570

DIERRE S.p.A.

Strada per Statale per Chieri, 66/15

14019 Villanova d'Asti (AT)

Tel: 0141/94-9411

Fax: 0141/94-6427

FAEL

Via Ettore Majorana

Zona Industriale, Brindisi

Tel: 0831/54-6563

NUOVA METALSUD (Drago) via Appia SS 7 Km 634

74016 Massafra (TA)

Tel: 099/880-1697

Fax: 099/880-0597

b. Blast Resistant Doors and Frames

NORMANT SECURITY GROUP

3224 Mobile Hwy

Montgomery, AL 36108

ATTN: Steve Scoggin

Tel: (334) 286-4246

Fax: (334) 286-4399

Email: steve-scoggin@normentind.com

SALZER GMBH

Dietrich-Bonhoeffer-Str.1-3

D-35037 Marburg

ATTN: Frank Rummler

Tel: 49 (0) 6421/938-100

Fax: 49 (0) 6421/938-190

Email: rummler@saelzer.de or suelzer@saelzer.de

PENSHER SKYTECH Ltd

Felling Works, William Street, Felling, Gateshead

Tyne & Wear NE 100JP – U.K.

Tel: 0044(0)1914380455

Fax: 0044(0)1914302328

Section 08110 7

Not all manufacturers produce all items specified. Products by other manufacturers meeting the specification requirements are also acceptable.

2.3 VARIOUS ITEMS

2.3.1 Louvers

2.3.1.1 Exterior Louvers

Louvers shall be inverted "Z" type with minimum of 55 percent net-free opening. Weld or tenon louver blades to continuous channel frame. Form louvers of hot-dip galvanized steel of same gage as shown for the door.

Louvers shall have steel-framed bird screens secured to room side and readily removable.

Provide galvanized steel, 13 by 13 mm mesh hardware cloth, for bird screens. Net-free louver area to be 55 percent before screening.

2.3.2 Astragals

For pairs of exterior steel doors which will not have aluminum astragals or removable mullions, provide overlapping steel astragals with the doors.

For interior pairs of fire rated doors, provide stainless steel astragals complying with UNI EN 1634-1 for fire rated assemblies.

2.4 INSULATION CORES

EN 9774. Insulated cores shall be of type specified, shall provide maximum assembly U-value of .48 and shall conform to:

a. Rigid Polyurethane Foam: ISO 4898 Type RC/PUR, foamed-in-place or in board form, with oxygen index of not less than 22 percent; or,

b. Rigid Polystyrene Foam Board: ISO 4898, Type RC/PS; or,

c. Mineral Fiber: Rock wool or glass fiber.

2.5 STANDARD STEEL FRAMES

Form frames to sizes and shapes indicated, with welded corners for masonry walls and knock-down field-assembled corners for metal stud walls.

Provide steel frames for doors, transoms, unless otherwise indicated.

2.5.1 Frame Tolerances

a. Frame Depth (Jamb Width or Depth Perpendicular to the Door Plane):

The width dimension of the frame shall not vary more than plus or minus 1.58 mm. The width dimension of the preparation side of of frame to receive door shall not vary more than 0.39 mm.

b. Frame Throat Opening: The throat opening dimension shall not vary more than plus or minus 2.38 mm in width.

c. Frame Face (Frame Face Parallel to Door Plane): The frame face dimension shall not vary more than plus or minus 0.79 mm.

d. Frame Opening Width: The frame opening width to receive the door shall not vary more than 1.58 mm larger and .79 mm less than the fabrication dimension.

8 Section 08110

e. Hinge Preparation Recess: The recess cut out to receive the hinges shall not be less than the size of the hinge or more than

0.39 mm larger than the hinge.

2.5.2 Welded Frames

Continuously weld frame faces at corner joints. Mechanically interlock or continuously weld stops and rabbets. Grind welds smooth.

2.5.3 Knock-Down Frames

Design corners for simple field assembly by concealed tenons, splice plates, or interlocking joints that produce square, rigid corners and a tight fit and maintain the alignment of adjoining members. Provide locknuts for bolted connections.

2.5.4 Transom Bars

Mullions and transom bars shall be closed or tubular construction and shall member with heads and jambs butt-welded thereto. Bottom of door mullions shall have adjustable floor anchors and spreader connections.

2.5.5 Anchors

Provide anchors to secure the frame to adjoining construction. Provide steel anchors, zinc-coated or painted with rust-inhibitive paint, not lighter than 2.0 mm gage.

2.5.5.1 Wall Anchors

Provide at least three anchors for each jamb. For frames which are more than 2285 mm in height, provide one additional anchor for each jamb for each additional 760 mm or fraction thereof.

a. Masonry: Provide anchors of corrugated or perforated steel straps or 5 mm diameter steel wire, adjustable or T-shaped;

b. Stud partitions: Weld or otherwise securely fasten anchors to backs of frames. Design anchors to be fastened to closed steel studs with sheet metal screws, and to open steel studs by wiring or welding;

c. Completed openings: Secure frames to previously placed concrete or masonry with expansion bolts and

2.5.5.2 Floor Anchors

Provide floor anchors drilled for 10 mm anchor bolts at bottom of each jamb member. Where floor fill occurs, terminate bottom of frames at the indicated finished floor levels and support by adjustable extension clips resting on and anchored to the structural slabs.

2.6 FIRE RATED DOORS AND FRAMES

UNI EN 1634-1. The construction and materials of door and frames shall be such to achieve the required fire-resistance rating in hours indicated on the door schedule. Fire-rated doors, frames and hardware shall be in accordance with Italian Norms. Fire-rated doors and frames shall have a certification from the "Centro Studi ed Esperienze Antincendi" at the

Section 08110 9

Italian Ministry of the Interior (Ministero dell" Interno) attesting the fire resistance rating.

2.6.1 Labels

Fire doors and frames shall bear a label indicating the name of the manufacturer, year of fabrication, name of certifying agency, certificate number and class of fire resistance and serial number with year of fabrication. Testing shall be in accordance with ISO 834 or ISO 3008 and

ISO 3009 or ISO 5925/1. Labels shall be metal with raised letters. Labels shall be permanently affixed at the factory to frames and to the hinge edge of the door. Door labels shall not be painted. REI requirements shall be as indicated.

2.6.2 Oversized Doors

For fire doors and frames which exceed the size allowed by UNI EN 1634-1, furnish certificates stating that the doors and frames are identical in design, materials, and construction to a door which has been tested and meets the requirements for the class indicated.

2.6.3 Astragal on Fire Doors

On pairs of rated fire doors, conform to UNI EN 1634-1.

2.7 WEATHERSTRIPPING

2.7.1 Integral Gasket

Black synthetic rubber gasket with tabs for factory fitting into factory slotted frames, or extruded neoprene foam gasket made to fit into a continuous groove formed in the frame, may be provided in lieu of head and jamb seals specified. Insert gasket in groove after frame is finish painted. Air leakage of weatherstripped doors shall not exceed 2.19 by

10-5 cubic meters per second of air per square meter of door area per ISO

8272.

2.8 HARDWARE PREPARATION

Space reinforce, drill, and tap doors and frames to receive finish hardware. Prepare doors and frames for hardware as indicated. Drill and tap for surface-applied hardware at the project site. Build additional reinforcing for surface-applied hardware into the door at the factory.

Locate hardware as indicated. Punch door frames , with the exception of frames that will have weatherstripping gasketing, to receive a minimum of two rubber or vinyl door silencers on lock side of single doors and one silencer for each leaf at heads of double doors. Set lock strikes out to provide clearance for silencers.

2.8.1 Provisions for Hardware

Fabricate doors and frames to receive hardware. Doors shall be capable of accepting U. S. fabricated hardware or equal approved to comply with fire rating requirements. Doors in which manufacturers provide their own lockset assembly and hinges and other hardware as part of the door assembly shall be rejected (and shall not be installed on this project).

Doors and frames with welded hinges are not acceptable. The hardware shall be as specified and shall be incorporated by the door manufacturer.

Frames shall be prepared at the factory for installation of hardware.

10 Section 08110

Frames shall be mortised, reinforced, drilled and tapped to templates to receive mortised template hinges, lock strikes flush bolts, and overhead door closer where required. Reinforcing plates shall be required for hardware. Cover boxes in back of hardware cut-uts shall be provided.

Minimum reinforcement of doors and frames for hardware shall be as follows:

HARDWARE MINIMUM THICKNESS MINIMUM SIZE

Hinges Door 3 mm 200 x 40 mm

Frame 3 mm 200 x 40 mm

Mortise Locksets Door 1.5 mm 250 x 100 mm and Deadbolts Frame 1.5 mm 160 x 40 mm

Surface Applied Closers Door 2 mm 320 x 100 mm

Frame 2 mm 350 mm x width of face, jamb or stop as required

2.9 FINISHES

2.9.1 Factory-Primed Finish

Unless specified otherwise, phosphate treat and factory prime metal doors and frames , or paintable galvannealed steel without primer. Where coating is removed by welding, apply touchup of factory primer.

2.9.2 Hot-Dip Zinc-Coated and Factory-Primed Finish

Fabricate exterior scheduled doors, frames and louvers from galvanized steel, UNI EN 10142. Repair damaged zinc-coated surfaces by the application of zinc dust paint. Phosphate treat and factory prime zinc-coated surfaces.

2.9.3 Factory-Applied Enamel Finish

After factory priming, apply two coats of medium-gloss enamel to exposed surfaces. Separately bake or oven dry each coat. Drying time and temperature requirements shall be in accordance with the coating manufacturer's recommendations. Color(s) of finish coat shall be as indicated and shall match approved color sample(s).

2.10 FABRICATION AND WORKMANSHIP

Finished doors and frames shall be strong and rigid, neat in appearance, and free from defects, waves, scratches, cuts, dents, ridges, holes, warp, and buckle. Molded members shall be clean cut, straight, and true, with joints coped or mitered, well formed, and in true alignment. Dress exposed welded and soldered joints smooth. Design door frame sections for use with the wall construction indicated. Corner joints shall be well formed and in true alignment. Conceal fastenings where practicable.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .