UUUY 17-1043 CONSTRUCTION COST ESTIMATE BREAKDOWN

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UUUY 17-1043

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
SUSTAIN EXTERIOR WALLS AND ROOF, MULTI
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
UUUY 17-1043SAN VITO DEI NORMANNI, ITALY
MATERIAL COSTSLABOR COSTS
LINE ITEM NO.ITEM (1)UNIT OF MEASURE (2)QUANTITY (3)UNIT (4)TOTAL (5)MANHOUR MANDAYS (6)AVERAGE RATE (7)TOTAL (8)OTHER DIRECT COSTS (9)LINE TOTAL (10)
0Bldg. 308
1Paint metal surfacesIT. No.5.1.a
2Furnish and installation of steel door, dim 90x215 cmIT. No.5.1.b.I
3Furnish and installation of steel door, dim. 180x215 cmIT. No.5.1.b.II
Bldg. 30801
4Removal of waterproofing materialsIT. No.5.2.a
5New roof packageIT. No.5.2.b
6New metal flashing 45 cmIT. No.5.2.c
7Paint exterior concrete wallsIT. No.5.2.d
8Furnish and installation of aluminum door, dim. 170x220 cmIT. No.5.2.e
Bldg. 30901
9Removal of waterproofing materialsIT. No.5.3.a
10New roof packageIT. No.5.3.b
11New metal flashing 45 cmIT. No.5.3.c
12Application of fiber-reinforced smoothingIT. No.5.3.d
Bldg. 30802
13Removal of waterproofing materialsIT. No.5.4.a
14New roof packageIT. No.5.4.b
15New metal flashing 45 cmIT. No.5.4.c
16Application of fiber-reinforced smoothingIT. No.5.4.d
17Furnish and installation of steel door, dim. 160x220 cmIT. No.5.4.e
Bldg. 309
18Removal of waterproofing materialsIT. No.5.5.a
19Removal of existing metal grilles on roof; supply and installtion of three metal stepsIT. No.5.5.b
20New roof packageIT. No.5.5.c
21New copper gutters and flashing 100 cmIT. No.5.5.d
22Painting and smoothing external surfacesIT. No.5.5.e
23Furnish and installation of new downspoutIT. No.5.5.f
24Paint metal surfacesIT. No.5.5.g
25Furnish and installation of steel door, dim. 90x215 cmIT. No.5.5.h.I
26Furnish and installation of steel door, dim. 90x215 cmIT. No.5.5.h.II
Bldg. 44203
27Removal of waterproofing materialsIT. No.5.6.a
28New roof packageIT. No.5.6.b
29New metal flashing 35 cmIT. No.5.6.c
30Application of fiber-reinforced smoothingIT. No.5.6.d
Bldg. 81244
31Removal of waterproofing materialsIT. No.5.7.a
32New roof packageIT. No.5.7.b
33Paint exterior concrete wallsIT. No.5.7.c
34Furnish and installation of steel door, dim. 200x250 cmIT. No.5.7.d

35 New metal flashing 35 cm IT. No. 5.7.e LS

TOTAL 0.00 0.00 0.00 0.00