1405_100__TechSpecs_ENG.pdf
PDF 3 MB Posted
- Solicitation number
- FA5682-15-R-0002
About this file
ASHE 09-1031 TECHNICAL SPECIFICATIONS
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. AIR FORCE
31ST FIGHTER WING
AVIANO AIR BASE, ITALY
Prepared and Submitted by:
Via di Sacco Pastore n. 4 - Rome, Italy Tel. +39.06.97848041 fax +39.06.97848175
E-mail: design@soinci.it
SO.IN.CI. S.r.l.
Architecture, Engineering & Consulting Services
PROJECT ASHE 09-1031
RESTORE HANGAR 1 BLDG. 921, AREA “F”,
AVIANO AIR BASE, AVIANO, ITALY
TECHNICAL SPECIFICATIONS
FINAL SUBMITTAL (100%)
Date: November 2014
A/E CONTRACT No.: FA5682-13-D-0004 D.O.: 0004
U.S. AIR FORCE
31ST FIGHTER WING
AVIANO AIR BASE, ITALY
Prepared and Submitted by:
Via di Sacco Pastore n. 4 - Rome, Italy Tel. +39.06.97848041 fax +39.06.97848175
E-mail: design@soinci.it
SO.IN.CI. S.r.l.
Architecture, Engineering & Consulting Services
PROJECT ASHE 09-1031
RESTORE HANGAR 1 BLDG. 921, AREA “F”,
AVIANO AIR BASE, AVIANO, ITALY
TECHNICAL SPECIFICATIONS
HAVING REVIEWED THE DEFINITIVE AND DETAILED PROJECT, I DECLARE THAT I HAVE
ASCERTAINED THAT THE STRUCTURES AND THE TECHNOLOGICAL SYSTEMS INCLUDED THEREIN
COMPLY WITH THE APPLICABLE ITALIAN NORMS.
SIGNATURE
DATE: NOVEMBER 10, 2014
SIGNATURE
ASHE 09-1031 AC1
INDEX
SECTION PAGE No.
AC1 - SCOPE OF PROJECT AND APPLICABLE CONDITIONS 1-13
AF FORM 66 - SCHEDULE OF MATERIAL SUBMITTALS 14-22
REVISED MASTER SPECIFICATIONS 23-77
ADDITIONAL SPECIFICATIONS 78-130
SCHEDULE OF WORK ITEMS 131
A. REPAIR WORK 132-156
B. SUSTAIN WORK 157-189
ASHE 09-1031 AC1 1
SECTION AC1
SCOPE OF PROJECT AND APPLICABLE CONDITIONS
AC1-01 SCOPE OF PROJECT: The Scope of this project is “RESTORE HANGAR
1, BLDG 921”, located in Area "F" of the Aviano Air Base. The architectural ensemble includes a main hangar bay with sloped roof and an annexes spaces around the bay with different slopes, heights, shapes and finishes as result of works probably performed in different periods to satisfy the
Users' needs during the years. The facility will be used for aircrafts maintenance by 31ST MAINTENANCE GROUP.
The project includes architectural, civil, mechanical, and electrical works.
Work to be performed includes but is not limited to the following items:
a. Architectural Work
- Replacement of aged plaster and paint finishes on interior and exterior walls.
- Replacement of annexes spaces flat roof waterproofing bituminous membrane and thermal insulation.
- Replacement of exterior doors and windows as indicated on drawings. Aluminum glazed doors with panic bars where necessary.
Aluminum windows, with thermal barrier frame, insulated double glass, complete with insect screens and vertical blinds.
- Partial replacement of existing suspended ceiling with new 60x60 cm panels and metal structure as indicated on drawings, except in toilets
- Replacement of existing interior doors with new aluminum doors with plastic laminate finish, except in toilets, complete with door frames, hardware, and panic bars where necessary. Steel fire rated doors with panic bars where necessary.
- Replacing of glazing panels on existing external door to be left in place.
- Replacement of existing gres ceramic tiles, vinyl and rubber floor tiles, except in toilets, with new 30x30 cm ceramic floor tiles as indicated on drawings. Provision of a recessed cocco mat in the main entrance area.
- Removal of asbestos cement downspout elbows and installation on new elbows.
- Provision of monocomponent epoxy resin paint on hangar bay cement floor surface and other annexes spaces cement floor areas as indicated on drawings, including hangar bay floor markings.
- Provision of two pass thru service doors and installation on hangar bay access sliding doors as indicated on drawings.
- Construction of a new Communication room.
- Installation of safety railing and access ladders over flat roof.
ASHE 09-1031 AC1 2
- Provision of electromagnetic holder system on existing doors to be left in place
Mechanical Work
- Removal of HVAC systems within the “Annex Area” at ground and roof floors as necessary and dispose to public dump, as indicated on the project drawings.
- Furnishing and installation of a Reversible Heat Pump RHP-1 with partial heat recovery kit, pumps & tank kit, low temperature kit, valves, sensors, anti vibration supports and fittings.
- Furnishing and installation of No.2 AHUs (AHU-1 and AHU-2) for fresh air treatment and exhaust air heat recovery, including ductworks, pipe works, valves, air diffusers and grilles, mechanical constant volume regulators (MC), control system, sensors and actuators, fire rated damper, thermal insulation, jacket and fittings.
- Furnishing and installation of HVAC system for Room 6 “Lox Room” including AHU-3 and EF-a, ductworks, pipe works, valves, air diffusers and grilles, control system, sensors and actuators, thermal insulation, jacket and fittings.
- Furnishing and installation of HVAC system for Room 9 “Battery
Room” including AHU-4 and EF-b, ductworks, pipe works, valves, air diffusers and grilles, control system, sensors and actuators, thermal insulation, jacket and fittings.
- Furnishing and installation of No.3 AHUs (AHU-5, AHU-6 and AHU-7) for thermal treatment of the larger maintenance room, including ductworks, pipe works, valves, air diffusers and grilles, control system, sensors and actuators, thermal insulation, jacket and fittings.
- Furnishing and installation of No.29 ducted fancoil units 2-pipe type, including ductworks, pipe works, valves, motorized 2-way valve (modulating or on/off as indicated in the design drawings), air diffusers and grilles, control system, sensor and actuators, thermal insulation and fittings.
- Provide for the realization of the new mechanical room complete of
N° 6 circulating pumps, pipeworks, supports and hangers, valves, thermal insulation, sensors, motorized valves and fittings. The works include the connection of the new hvac systems to the existing hot water line coming from external main boiler room. The pumps are resumed below
- CP-1: hot/chilled water circuit, seasonal changeover, for fancoils and main AHUs coils;
- CP-2: AHUs post heating coils circuit;
- CP-3: Radiators circuit;
- CP-4: Hangar Bay process heat exchanger;
- CP-5: heat recovery circuit from RHP-1
- CP-6: POT chemical feeder and dirt separator The works includes the installation of the intertial tank IT-1, the manifolds, control system etc.
ASHE 09-1031 AC1 3
- New treatment system for hvac make-up water complete of filter, softener WS1, the dosing pump DP1 and the inline chemical feeders and dirt separator.
- Furnishing and installation of No.1 direct expansion unit ADX, mono split type, for Comm Room 33 including pipe works, valves, control panel, thermal insulation and fittings.
- Provide new hot and chilled main water pipeworks, supports and hangers, valves, thermal insulation, jackets and fittings.
- Provide new radiators circuit including pipeworks, supports and hangers, valves, thermal insulation, thermostatic valves for the existing radiators and fittings.
- Provide new hangar bay heat exchanger circuit including pipework, valves, thermal insulation, and fittings.
- Provide new condensate drain pipework for AHU ad FC cooling coils.
- Provide new HVAC central control system including DDC units, bus, controllers, gateways, sensors and actuators, a workstation (touch panel), software and electronic graphic pages. The system includes the energy monitoring equipments. Use BACnet protocol.
- Testing Adjusting and Balancing TABs of the HVAC systems.
- Provide for the relocation of several existing potable water connection in the annex area and installation of new eyewash;
- Provide for the relocation of several existing compressed air connection in the annex area and the installation of several new in the annex area and in the bay area;
- Provide for the relocation in a specific area of the hangar bay of the existing air compressor and the relevant equipments currently installed in a nearby building. Works include the connection of the air compressor to the existing air compressed pipework.
- Provide for the relocation of the foam concentrate bladder tank in the fire room in order to facilitate maintenance and replace the membrane according to the instructions of the use and maintenance manual;
- Provide for the repair of one of the foam generators in the bay area through the replacement of the distribution ring to the nozzles and the adjustment of the supply pipe and the anchor brackets of the generator.
Electrical Work
- Removal of existing electrical systems within the “Annex Area” as necessary and dispose to public dump, as indicated on the project drawings;
ASHE 09-1031 AC1 4
- Furnishing and installation of a digital meter on MDP with connections to the existing telemonitoring system. Item also includes the software upgrading;
- Furnishing and installation of new distribution panels, ground fault circuit breaker equipped indicated as Panel A, B, C and D, A/C Panel, Hangar Bay Outlet Panel (HNOP) on the project drawings;
- Furnishing and installation of outlets (Italian and USA type) in the offices, exposed floor base mounted;
- Furnishing and installation of interlocked outlet in the shops, exposed wall mounted;
- Furnishing and installation of new wiring system, TN-S type in accordance with CEI 64-8, feeding distribution panels from MDP, with fire proof cables FG7(O)M1 type;
- Furnishing and installation of new wiring system feeding interlocked outlets, with fire proof cables FG7(O)M1 type;
- Furnishing and installation of new wiring system feeding existing an new lighting fixtures, with fire proof cables N07G9-K type;
- Furnishing and installation of new wiring system feeding new outlets in the Offices and Back-Shop areas, with fire proof cables
N07G9-K type;
- Furnishing and installation of new telecomm system, including Main telecomm rack located in the upgraded telecomm room, 2 telecomm racks located as indicated, telecomm outlet RJ 45 cat. 6 floor base mounted, for telecomm and data system and UTP cat. 6 cables.
The data and voice cables will terminate in separate RJ45 type patch panels.
- Furnishing and installation of WiFi Access Point, including switches to be installed in the telecomm racks, for the
Offices/Backshops areas, Hangar Bay and 30 m outdoor in the parking apron;
- Furnishing and installation of the electrical system feeding the
A/C equipment;
- Furnishing and installation of new LED type outdoor wall mounted floodlights;
- Furnishing and installation of new Sonic Bird Control System, including wiring system;
- Furnishing and installation of a new LPS, Faraday cage type, only for the Annex Area;
- Furnishing and installation of new Temperature Control Panel and temperature probes, including connections to the existing FACP.
Item includes also the FACP software upgrading;
- Furnishing and installation of new connections from electromagnetic door holders to the existing FACP. Item also
ASHE 09-1031 AC1 5
includes the provisions of the control units and the FACP software upgrading;
- Remove and reinstall in the same place the existing F/A devices, in accordance with the Architectural an Mechanical Works. At the end of the Works the F/A system shall be tested and any eventually deficiencies shall be corrected.
- At the end of the electrical works, the entire system shall be tested in accordance with the CEI 64/8 and the “Dichiarazione di
Conformità” in accordance with the Decree No. 37/08 shall be provided.
AC1-02 TECHNICAL SPECIFICATION: The following Sections of the Master
Specifications for construction projects of the Air Base in Aviano (PN), Italy, dated November 2006 and applicable modifications, shall be applicable to the present project, together with the List of Work Items to be performed:
02751 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS
02762 JOINTS, REINFORCEMENT, AND MOORING EYES IN CONCRETE PAVEMENTS
04405 NATURAL STONE WORK
07112 BITUMINOUS DAMPPROOFING
08210 WOOD DOORS
08331 ROLLING SERVICE GRILLS
12490 BLINDS
15050 BASIC MECHANICAL MATERIALS AND METHODS
15080 INSULATION FOR MECHANICAL EQUIPMENT
15810 DUCTWORK AND DUCTWORK ACCESSORIES
15901 SPACE TEMPERATURE CONTROL SYSTEM
15950 HVAC TESTING/ADJUSTING/BALANCING
See Paragraphs AC1-23 and AC1-24 for the other applicable specifications.
AC1-03 SUBMITTAL OF MATERIALS: In accordance with Paragraph 2.5 of the technical specification No. 01100/R, entitled “GENERAL CONDITIONS” of the
Master Specifications, the materials listed in AF Form 66 shall be submitted as required by the time schedule indicated, for the approval by the Contracting Officer’s Technical Representative.
The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials.
The number of copies will be as required on AF Form 66.
AC1-04 CONSTRUCTION AREA SCREENING: All construction sites and material storage areas shall be securely fenced around the entire perimeter within an area defined by the Contracting Officer’s Technical Representative.
Bilingual signs, "VIETATO L'INGRESSO - LAVORI IN CORSO / WORK AREA - NO
ENTRY" shall be placed at the work area entry and along each side of the fencing. Fence type, height, and screening color should also be specified by the Base Civil Engineering (BCE). Fencing shall be completely secured at top and bottom to prevent access. Fences shall be screened with opaque screening material to prevent visibility inside the fenced area. Fences and screens shall be adequately staked and/or anchored to prevent blowing over during high wind conditions. Contractor shall not start installation of area screening until approved, in writing, by BCE. Contractor shall
ASHE 09-1031 AC1 6
submit photos or samples of the screening material for approval by BCE.
The Contractor shall replace or repair in a timely manner, as determined by
BCE, all fences and screening sections that have damage or develop unsightly rips or holes. At the end of the work or when exterior work requires it, temporary fencing shall be removed.
Night warning lights shall be installed to illuminate the work area, from sunset to dawn.
AC1-05 PROJECT SIGN: The Contractor shall furnish a project sign on site in accordance with Section 01101/R. The sign shall be made of a durable material and maintained in good condition. Lettering is to be white gloss, exterior-type enamel. The sign and posts shall be given one prime coat and two finish coats of dark brown gloss exterior enamel paint.
The sign shall be erected at the designated location and shall be maintained in good condition by the Contractor until completion of the contract. The sign shall remain the property of the Contractor and shall be removed from the site upon final inspection and acceptance of the facility. Contractor identification and logo shall be allowed only on this sign and nowhere else on the exterior of the job site, with the exception of company vehicles. There should be no signs for the purpose of advertising anywhere on the site. Contractors shall submit sign proposal to CE for approval.
AC1-06 JOB SITE MOBILIZATION: The Contractor shall submit a proposal to
BCE diagramming their construction site and all material storage areas in locations separate from a construction site. The Contractor shall submit this plan 14 calendar days prior to the start of construction. Material mobilization and construction execution can not begin until the plan has been approved by the base. Jobsite utility connections are the responsibility of the Contractor and shall be coordinated through BCE.
Temporary overhead utility runs are prohibited. Contractor shall include a plan for supplying required utilities to their site in their proposal.
AC1-07 SAFETY: Contractor shall provide barricades, traffic control signs and construction safety signs that meet installation standards and comply with all applicable laws. Actual location, size and final arrangement of these items shall be discussed and approved by the BCE prior to installation. Such approved items shall be of uniform size, design and color. All cones, barricades, warning lights, temporary signs and protective devices shall conform to the current host nation requirements and the U.S. Army Corps of Engineers Safety and Health Requirements Manual
EM 385-1-1.
AC1-08 HAZMAT/HAZWASTE HOUSEKEEPING: Prior to bringing any hazardous material into the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.
a. Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.
b. Material Safety Data Sheets: The Contractor shall furnish English language versions of the Material Safety Data Sheets (MSDS) of hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st CES/CEV for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the MSDS form to the Contractor.
ASHE 09-1031 AC1 7
c. Hazardous Waste Management Plan: The Contractor shall provide an hazardous waste management plan.
d. Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEV office.
e. Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers.
Relative data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEV through the Director of
Works.
f. Asbestos Containing Materials: Asbestos containing materials will be encountered during demolition work. It shall be the responsibility of the Contractor to handle and dispose asbestos containing materials in the appropriate manner, as prescribed by
Italian Law, governing the handling of such materials, and to provide all required documentation and related coordination to obtain the necessary authorizations. Removal, handling and disposal of asbestos containing materials shall be in compliance with Section 13281 of this contract document.
AC1-09 PRESERVATION OF EXISTING CONDITIONS: The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized by BCE to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. The
Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the base.
AC1-10 WORK SITE CONDITIONS: The work areas shall be made available to the Contractor as follows:
a. Building interior area: Government personnel will remove furniture items prior commencement of the work.
b. Building Location: The building is located in area that requires special access procedures, therefore the Contractor shall strictly comply with the Contracting Officer’s instructions. Delays may happen when the Contractor will enter the restricted areas due to military operations or exercises. In this case the unproductive time will not be at the expense of the USA Government.
c. Administrative Containers: Containers required on site for administrative reasons (office space, conference space, break room) must be in like new condition and painted a color which coordinates with the base architectural plan and is approved by
BCE, unless it is hidden by the opaque fencing material.
Administrative containers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the
ASHE 09-1031 AC1 8
project site. A nameplate, no greater than 0.5 meters X 0.5 meters in size, shall be displayed on the exterior of all trailers which lists the name of the Contractor’s company, 24-hour
Contractor’s point(s) of contact (POC) and telephone number where they can be reached.
d. Material Storage: Storage containers will be in like new condition, and painted a color which coordinates with the base architectural plan and is approved by BCE, if it is not hidden by the opaque fencing material. Contractor shall display a nameplate on the exterior of all storage units with the name of the
Contractor’s company, the Contractor’s point(s) of contact (POC) and telephone number where they can be reached. Storage of materials at the work site is at the Contractor’s risk. The use of private security guards on a job site shall be coordinated with base Security Forces and approved by the installation commander.
The Contractor shall not use any area(s) for material or equipment storage that has not been approved by BCE.
e. Loading and Unloading of Construction Materials and Equipment:
Unloading of materials will be allowed within the fenced work area.
Contractor's personnel, vehicles and equipment must not obstruct access roads to other buildings.
Temporary parking of vehicles, for loading or unloading materials and equipment is permitted in the proximity of the work area;
unless such operations will obstruct traffic flow.
f. Housekeeping and Site Cleanup: At the end of each working day, the Contractor shall be responsible for cleaning the area surrounding the building involved in the work.
Since the adjacent buildings are used every day, the Contractor shall provide that the surrounding areas are kept constantly clean and accessible, completely safe, and that the facilities are not in any way aesthetically damaged, even temporarily.
Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. Grass within the construction sites and material storage areas shall never exceed 10 cm in height. All rubbish and waste materials shall be placed in Contractor furnished containers. Contractors shall ensure all light weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield. During the laying of asphalt roads, streets and/or parking surfaces, areas soiled by residual asphalt shall be cleaned the same day.
AC1-11 AIRFIELD SAFETY TRAINING: The Contractor shall contact Airfield
Management to receive flight line driver and airfield safety training prior to start of any work beginning on the flight line.
AC1-12 PARKING: Contractor or Contractor’s employees, including subcontractors, shall obey all traffic laws on installation.
The Contractor shall park all vehicles, including heavy equipment vehicles, only in unobtrusive locations within the fence line of the construction site or laydown areas. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily observed by the public.
The Contractor shall not park outside the construction zone unless approved through BCE.
ASHE 09-1031 AC1 9
The Contractor shall clearly identify their vehicles through the use of company logos or signs on their vehicles.
AC1-13 ACCESS ROUTES: The Contractor shall provide a haul route plan for approval by BCE.
For road detour/closures the Contractor shall submit a written request to the Contracting Officer or his authorized representative for approval four weeks prior to his scheduled starting of work.
AC1-14 TRUCKING AND ROADS: Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered.
Fasten suitable cover, such as tarpaulin, over the load before entering surrounding streets. The Contractor is solely responsible for spillage from their vehicles and such spillage shall be cleaned up immediately. All roads shall be maintained free of debris at all times. The Contractor is responsible for ensuring all haul routes and site access areas are maintained in a clean and orderly fashion, free from mud, debris and clutter at all times. Special consideration must be given to haul routes that cross active taxiways. No amount of debris at these locations shall be tolerated. The Contractor shall sweep these areas continuously as long as material deliveries are being made.
AC1-15 NOISE CONTROL: The Contractor shall comply with all applicable country, local, and installation laws, ordinances, and regulations relative to noise control, to include applicable base quiet hours.
AC1-16 EXCAVATIONS: Every trench/excavation shall be returned to its original condition within ten days of the original excavation; this may be extended to 30 days if approved by the BCE. Contractor shall phase trenching and excavation operations in order to comply. At minimum, Contractor shall restore the site to pre-excavation conditions. All soil stockpiles shall be hidden from view to the maximum extent possible. Prior approval by BCE is required if soil stockpiles are to remain exposed for long periods of time. Dust control measures are the responsibility of the
Contractor and shall be implemented as directed by BCE. All road cuts must be approved by BCE prior to execution.
AC1-17 LAWN MAINTENANCE: Grassy areas disturbed by any type of construction work including storage, equipment staging, and material delivery areas shall be sodded, or hydro-seeded, where required by BCE.
Sodding, or seeding, damaged areas should be accomplished at the earliest planting season possible. Contractor shall be responsible for the successful growth and maintenance of all sodded, or seeded, areas under this contract for a period of thirty (30) days or three mowings after final acceptance of the work. All grass, shrubbery, and ornamental plants fenced by the construction site shall be maintained to base standards by the
Contractor.
AC1-18 LAWN ESTABLISHMENT: Within seven (7) workdays of actual completion of work at contract site, the Contractor shall prepare all disturbed areas inside and outside of the fenced site for sodding, or hydro-seeding, as provided in contract specifications. Contractor shall restore the site to a condition and appearance equal to or better than existing before the work occurred. Such restoration work will not be considered complete, and the facility not accepted, until approved by BCE.
Additionally, no seeding shall be authorized for lawn establishment, whether new, or for restoration purposes unless specifically authorized by
BCE .
ASHE 09-1031 AC1 10
AC1-19 CONSTRUCTION SITE RESTORATION: All Contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences, that are erected during construction, shall be removed entirely after completion of project and within five (5) days of
Government acceptance of the project site. The Contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equipment/storage units, residual construction materials shall be removed also within five
(5) days of Government acceptance of the project site.
AC1-20 PROCEDURES AND WORK PHASES: Prior to starting any work the
Contractor shall submit a Work Plan for approval by the Contracting
Officer.
AC1-21 SALVAGEABLE MATERIALS: In this contract are indicated materials and equipment to be removed, stored and subsequently reinstalled. It shall be the responsibility of the Contractor to remove salvageable items with maximum care to avoid any damages; and to transport them to the storage areas as indicated by the Contracting Officer’s Technical Representative.
It shall be the responsibility of the Contractor to provide containers for material disposal and/or transportation of the salvageable items. All discarded materials shall be transported to an authorized public dump site by the Regional and National Regulation according to the typology of the related material. Transportation of discarded materials shall be extended, to an authorized dump site, even if the dump site is located outside the authority limits of the Aviano City Council Territory.
AC1-22 CONSTRUCTION DRAWINGS: The following Construction Drawings complement this Technical Specification and are an integral part of the project documents:
DRAWING # SHEET # DESCRIPTION
GENERAL
1 of 71 T-1 PROJECT TITLE SHEET AND MAPS
2 of 71 T-2 LIST OF DRAWINGS & LEGENDS
ARCHITECTURAL
3 of 71 A-1 EXISTING CONDITIONS - GENERAL PLAN
4 of 71 A-2 EXISTING CONDITIONS - ENLARGED PLAN
5 of 71 A-3 EXISTING CONDITIONS - ENLARGED PLAN
6 of 71 A-4
EXISTING CONDITIONS
ROOF AND SUSPENDED CEILING PLANS
7 of 71 A-5 EXISTING CONDITIONS – ELEVATIONS
8 of 71 A-6 EXISTING CONDITIONS – ELEVATIONS
9 of 71 A-7 EXISTING CONDITIONS – SECTIONS
10 of 71 A-8 NEW CONDITIONS - ENLARGED PLAN
11 of 71 A-9 NEW CONDITIONS - ENLARGED PLAN
12 of 71 A-10 NEW CONDITIONS - ROOF PLAN
13 of 71 A-11 NEW CONDITIONS – ELEVATIONS
14 of 71 A-12 NEW CONDITIONS – ELEVATIONS
15 of 71 A-13 NEW CONDITIONS – SECTIONS
16 of 71 A-14 NEW CONDITIONS - SUSPENDED CEILING PLAN
17 of 71 A-15 NEW CONDITIONS - WINDOWS SCHEDULE
18 of 71 A-16 NEW CONDITIONS - EXTERIOR DOOR SCHEDULE
19 of 71 A-17 NEW CONDITIONS - INTERIOR DOOR SCHEDULE
20 of 71 A-18 NEW CONDITIONS - FINISH SCHEDULE AND DETAILS
21 of 71 A-19 NEW CONDITIONS - DETAILS
ASHE 09-1031 AC1 11
22 of 71 A-20 NEW CONDITIONS – FLOOR MARKING PLAN
MECHANICAL
23 of 71 M-1 MECHANICAL LEGEND
24 of 71 M-2 EXISTING CONDITION - GROUND FLOOR PLAN - PART 1
25 of 71 M-3 EXISTING CONDITION - GROUND FLOOR PLAN - PART 2
26 of 71 M-4 EXISTING CONDITION - ROOF FLOOR PLAN - PART 1
27 of 71 M-5 EXISTING CONDITION - ROOF FLOOR PLAN - PART 2
28 of 71 M-6
NEW CONDITION – HVAC AIR DUCTWORK
GROUND FLOOR PLAN – PART 1
29 of 71 M-7
NEW CONDITION – HVAC AIR DUCTWORK
GROUND FLOOR PLAN – PART 2
30 of 71 M-8
NEW CONDITION – HVAC PIPEWORK
GROUND FLOOR PLAN – PART 1
31 of 71 M-9
NEW CONDITION – HVAC PIPEWORK
GROUND FLOOR PLAN – PART 2
32 of 71 M-10 NEW CONDITION - HVAC - ROOF FLOOR PLAN - PART 1
33 of 71 M-11 NEW CONDITION - HVAC - ROOF FLOOR PLAN - PART 2
34 of 71 M-12 NEW CONDITION - HVAC - GENERAL DIAGRAM - AIR DUCTS
35 of 71 M-13
NEW CONDITION - HVAC - HOT & CHILLED WATER
P&ID DIAGRAM
36 of 71 M-14 NEW CONDITION - HVAC – AHU – P&ID DIAGRAM – 1of 2
37 of 71 M-15 NEW CONDITION - HVAC – AHU – P&ID DIAGRAM – 2of 2
38 of 71 M-16 NEW CONDITION - HVAC – SCHEDULES
39 of 71 M-17 NEW CONDITION - COMPRESSED AIR AND PLUMBING SYSTEMS
40 of 71 M-18 NEW CONDITION - DETAILS
ELECTRICAL
41 of 71 E-1 EXISTING MV-LV SCHEMATIC DIAGRAM
42 of 71 E-2
ANNEX AREA - EXISTING CONDITION
POWER SYSTEM GROUND FLOOR PLAN - PART 1
43 of 71 E-3
ANNEX AREA - EXISTING CONDITION
POWER SYSTEM GROUND FLOOR PLAN - PART 2
44 of 71 E-4
ANNEX AREA - EXISTING CONDITION
LIGHTING SYSTEM GROUND FLOOR PLAN - PART 1
45 of 71 E-5
ANNEX AREA - EXISTING CONDITION
LIGHTING SYSTEM GROUND FLOOR PLAN - PART 2
46 of 71 E-6
ANNEX AREA - EXISTING CONDITION
COMMUNICATION GROUND FLOOR PLAN - PART 1
47 of 71 E-7
ANNEX AREA - EXISTING CONDITION
COMMUNICATION GROUND FLOOR PLAN - PART 2
48 of 71 E-8
ANNEX AREA - EXISTING CONDITION
FIRE ALARM SYSTEM GROUND FLOOR PLAN - PART 1
49 of 71 E-9
ANNEX AREA - EXISTING CONDITION
FIRE ALARM SYSTEM GROUND FLOOR PLAN - PART 2
50 of 71 E-10
IMPIANTO PROTEZIONE SCARICHE ATMOSFERICHE
ROOF PLAN
51 of 71 E-11 NEW LV SCHEMATIC DIAGRAM
52 of 71 E-12
ANNEX AREA - NEW CONDITION
POWER SYSTEM GROUND FLOOR PLAN - PART 1
53 of 71 E-13
ANNEX AREA - NEW CONDITION
POWER SYSTEM GROUND FLOOR PLAN - PART 2
54 of 71 E-14
ANNEX AREA - NEW CONDITION POWER SYSTEM
FOR MECHANICAL EQUIP. GROUND FLOOR AND ROOF PLANS
55 of 71 E-15 ANNEX AREA - NEW CONDITION
ASHE 09-1031 AC1 12
LIGHTING SYSTEM GROUND FLOOR PLAN - PART 1
56 of 71 E-16
ANNEX AREA - NEW CONDITION
LIGHTING SYSTEM GROUND FLOOR PLAN - PART 2
57 of 71 E-17
ANNEX AREA - NEW CONDITION
COMMUNICATION SYSTEM GROUND FLOOR PLAN - PART 1
58 of 71 E-18
ANNEX AREA - NEW CONDITION
COMMUNICATION SYSTEM GROUND FLOOR PLAN - PART 2
59 of 71 E-19
HANGAR - NEW CONDITION COMMUNICATION SYSTEM
WIFI NETWORK
60 of 71 E-20
HANGAR - NEW CONDITION COMMUNICATION SYSTEM
BLOCK DIAGRAM
61 of 71 E-21
ANNEX AREA - NEW CONDITION
FIRE ALARM SYSTEM - GROUND FLOOR PLAN - PART 1
62 of 71 E-22
ANNEX AREA – NEW CONDITION
FIRE ALARM SYSTEM - GROUND FLOOR PLAN - PART 2
63 of 71 E-23 ANNEX AREA - FIRE ALARM SYSTEM - BLOCK DIAGRAM
64 of 71 E-24 NEW CONDITION LIGHTNING SYSTEM, ROOF PLAN
65 of 71 E-25 NEW CONDITION - SCHEMATIC DIAGRAMS PANEL A
66 of 71 E-26 NEW CONDITION - SCHEMATIC DIAGRAMS PANEL B
67 of 71 E-27 NEW CONDITION - SCHEMATIC DIAGRAMS PANEL C
68 of 71 E-28 NEW CONDITION - SCHEMATIC DIAGRAMS PANEL D – PART 1
69 of 71 E-29 NEW CONDITION - SCHEMATIC DIAGRAMS PANEL D – PART 2
70 of 71 E-30 NEW CONDITION - SCHEMATIC DIAGRAMS PANELS HBOP - A/C
71 of 71 E-31 ELECTRICAL SYSTEM DETAILS
AC1-23 ADDITIONAL SPECIFICATIONS: In addition to the Norms and
Specifications contained in the Master Specifications as noted in Section
AC1-02 of these Technical Specifications, the following Additional
Specifications shall apply to this project:
UFGS 23 09 23.13 20/R BACNET DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
264100 LIGHTNING PROTECTION SYSTEM
AC1-24 REVISED MASTER SPECIFICATIONS: In addition to the Norms and
Specifications contained in the Master Specifications as noted in Section
AC1-02 of these Technical Specifications, the following Revised Master
Specifications shall apply to this project
01100/R GENERAL CONDITIONS
01101/R PROJECT SIGN
02220/R SITE DEMOLITION
03300/R CAST-IN-PLACE CONCRETE
04200/R MASONRY
05310/R STEEL DECKS
05500/R METAL FABRICATIONS
07220/R ROOF INSULATION
07600/R FLASHING AND SHEET METAL
07840/R FIRE STOPPING
07920/R JOINT SEALANTS
08110/R STEEL DOORS AND STEEL FRAMES
08120/R ALUMINUM DOORS AND FRAMES
08520/R ALUMINUM WINDOWS
08800/R GLAZING
09212/R EXTERIOR STUCCO
09220/R INTERIOR PLASTER
09510/R ACOUSTICAL CEILING
09900/R PAINTS AND COATINGS
ASHE 09-1031 AC1 13
15070/R MECHANICAL SOUND, VIBRATION AND SEISMIC CONTROL
15181/R CHILLED WATER AND HOT WATER PIPING
15400/R PLUMBING
15601/R CENTRAL REFRIGERATION EQUIPMENT FOR AIR CONDITIONING
15720/R AIR HANDLING AND DISTRIBUTION EQUIPMENT
16050/R BASIC ELECTRICAL MATERIALS AND METHODS
16316/R SWITCHBOARDS
16402/R INTERIOR DISTRIBUTION SYSTEM
16510/R INTERIOR LIGHTING
16530/R EXTERIOR LIGHTING
16710/R STRUCTURED TELECOMMUNICATIONS CABLING AND PATHWAY SYSTEM
AC1-25 ADDITIONAL NORMS AND STANDARDS: Furthermore the works included in this project shall be in accordance, when applicable, with the NFPA, ASTM, UL, HANDBOOKS, Norms and Standards, whose manuals and regulations are available for review at the Contracting Officer.
AC1-26 FINAL ACCEPTANCE TEST & CERTIFICATIONS:
a. All installed new mechanical and electrical equipment shall have the required Italian Mark of Quality and shall conform to D.P.R.
No. 459, dated 24 July 1996, with "C.E." Mark; and three copies of relevant certificates shall be furnished to the Contracting
Officer for each item of equipment installed. Furthermore the electric equipment shall be in compliance with the Legislative
Decree No. 81/08 and subsequent modifications which apply the
Directive 93/68/CEE. Electrical tests shall comply with Low 37/08 and CEI 64/8 Norm.
b. At the end of the work, the Contractor shall provide the
Government with three copies of the following documents:
1. Certificate of Compliance with Law No. 37/08, for the installation of the electrical and mechanical systems in a workmanlike manner, signed by the Contractor.
2. Final Acceptance Test Certifications for electrical and mechanical systems signed by a Registered Engineer to be selected from three candidates proposed by the Contractor to the Contracting Officer.
AFForm 66, OCT 89
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ASHE 09-1031
PROJECT TITLE
RESTORE HANGAR 1 BLDG 921, AREA F, AVIANO AB
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
D A
T E
R E
C E
IV
E
IN
C O
N T
R A
C T
G
T E
T O
C
IV
IL
N
G
IN
E E
R
T U
R N
S U
S P
E N
S
U
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
L
F
A L
A P
P R
O V
LI
E N
U M
B
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
H
O P
D R
A W
M P
LE
LO
R
S E
LE
C
T
IO
M
N U
F A
C T
U R
E
’S
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
W
R R
A N
Y
T A
LO
G
D A
P
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
DATE CONTRACTOR
NOTIFIED REMARKS
APPROVED DIS-
APPROVED
A. REPAIR WORKS
PART II
A. ARCHITECTURAL WORK
Not applicable
B. STRUCTURAL WORK
C. CIVIL WORK
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N T
R A
C T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
E N
U M
B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
PART III – MECHANICAL WORK
A. HVAC SYSTEM
1 Water Chiller Heat Pump Type, RHP-1, w/ Tank&Pump unit.
Part IIIa Item 1
3 3 3 3 3 3 30
2 Vertical single stage in-line pumps – CP1, CP2, CP3
Part IIIa Item 2
3 3 3 3 3 30
3 Electronic circulators, canned-rotor type –
CP3, CP5
Part III Item 3
3 3 3 3 3 30
4 Circulators, canned-rotor type –CP6 Part III Item 4
3 3 3 3 3 30
Inertial tank – IT-1 Part IIIa Item 5
3 3 3 3 30
6 Expansion tank – ET-1, ET-2, ET-3 Part IIIa Item 6
3 3 3 3 30
7 Motorized Valves Part IIIa Items 7, 8, 9
3 3 3 3 3 30
8 Energy meters Part IIIa Item 10
3 3 3 3 3 30
9 Butterfly valves, check valves, strainers, flexible joints, vents, ball valves, Part IIIa Items 11, 12, 13, 14, 16, 26
3 3 3 30
10 Balancing valves Part IIIa Item 15
3 3 3 3 30
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N T
R A
C T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
E N
U M
B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
11 PVC Drain Piping Part IIIa Item 17, 41
3 3 3 30
12 Pressure Gauge and thermometer Part IIIa Items 18, 19
3 3 30
13 Water softener - WS1 Part IIIa Item 20
3 3 3 3 3 30
14 Dosing pump- DP1 Part IIIa Item 21
3 3 3 3 3 30
15 Back Flow Preventer and filter Part IIIa Item 22
3 3 3 3 3 30
16 Pressure Regulators Part IIIa Item 23
3 3 30
17 Self-cleaning automatic filter Part IIIa Item 24
18 Compact filling unit Part IIIa Item 23
3 3 30
19 In line dirt separator and chemicals feeder Part IIIa Item 27
20 Hot and Chilled Water Piping and Fittings Part IIIa Items 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 39
3 3 3 30
21 Piping Insulation Part IIIa Items 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 39
3 3 3 30
22 Piping Aluminum Jacket Cover, Aluminum foil, PVC foil as required Part IIIa Items 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 39
3 3 3 30
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N T
R A
C T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
E N
U M
B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
23 AHU for supply and extraction air Part IIIa Item 29, 30, 35, 36
3 3 3 3 3 3 30
24 Ductwork and Fittings Part IIIa Items 29, 30, 31,32, 33, 34, 35, 3 3 3 3 30
25 Duct insulation, with Aluminum Jacket, Aluminum Foil, PVC Foil where needed Part IIIa Items 29, 30, 31,32, 33, 34, 35, 3 3 3 3 30
26 Damper for air duct Part IIIa Items 29, 30, 31,32, 33, 34, 35, 3 3 3 3 30
27 Actuator for damper for air duct Part IIIa Items 29, 30, 31,32, 33, 34, 35, 3 3 3 3 3 30
28 Supply and return air diffusers and grilles.
Part IIIa Items 29, 30, 31,32, 33, 34, 35, 29 Ducts noise baffles.
Part IIIa Items 29, 30, 35, 36
30 Fancoil units Part IIIa Item 32, 33, 34
3 3 3 3 3 30
31 Exhaust fans Part IIIa Items 35, 36
3 3 3 3 3 30
32 Monosplit DX unit Part IIIa Item 38
3 3 3 3 3 3 30
33 DDC Control System for Mechanical Systems, inverter ad fittings Part IIIa Items 29, 30, 33, 33, 34, 35, 36, 3 3 3 3 3 3 30
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N T
R A
C T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
E N
U M
B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
B. PLUMBING SYSTEM
34 Portable eyewash unit Part IIIb Item 43
3 3 3 3 3 30
35 Foam tank relocation, bladder replacement and foam concentrate Part IIIb Item 47
3 3 3 3 3 3 30
36 Foam generator parts replacement Part IIIb Item 48
3 3 3 3 3 3 30
PART IV – ELECTRICAL WORK
Material Safety Data Sheets (MSDS)
1 “New 4P-250 A Circuit Breaker Part IV Item 1
3 3 3 3 3 30
2 A/C Panel Part IV Item 2
3 3 3 3 3 30
3 A/C System Distribuition Part IV Item 3
3 3 3 3 3 30
4 Compressor SystemPanel Part IV Item 3
3 3 3 3 3 30
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N T
R A
C T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
E N
U M
B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
B. SUSTAIN WORKS
A. ARCHITECTURAL WORK
Material Safety Data Sheets (MSDS)
30x30 Ceramic Tile/Base Part IIa Item 1
1 3 3 3 30
2 Epoxy Resin Floor Paint Part IIa Item 3
3 3 3 3 30
3 Suspended Ceiling Panel Part IIa Item 6
1 3 3 30
4 Latex Paint for Interior/Exterior Walls Part IIa Item 7 – 8 - 9
3 3 30
5 REI120 Steel Doors Part IIa Item 12a 12b 12c 12d 12e
3 3 3 3 3 30
6 Interior Wood Doors Part IIa Item 13a 13b 13c 13d 13e
3 3 3 3 30
7 Exterior Aluminum Door Part IIa Item 15
3 3 3 3 30
8 Exterior Steel Door Part IIa Item 16a 16b 16c 16d 16e 16f
3 3 3 3 30
9 Exterior Rolling-up Door Part IIa Item 16a 16b 16c 16d 16e 16f
3 3 3 1 3 3 3 30
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N T
R A
C T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
E N
U M
B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
10 Anodized Aluminum Window Part IIa Item 18a 18b 18c 18d 18e 18f 18g 18h 18i 18j 18k 18l
3 3 3 3 30
11 Glazing Panel Part IIa Item 19
3 3 3 30
12 New Roofing System Part IIa Item 22
3 3 3 30
13 New Communication Room Part IIa Item 23 - 23
3 3 3 30
14 Hangar Bay Cement floor treatment Part IIa Item 26
3 3 3 3 30
15 Hangar Bay Horizontal Markings Part IIa Item 26
3 3 30
16 110x90 Pass thru Service Door Part IIa Item 27
3 3 30
17 Steel Ladder for Roof Access Part IIa Item 28
3 3 30
18 Steel Safety Railing Part IIa Item 29
3 3 30
19 Electromagnetic door holder Part IIa Item 31
3 3 3 3
B. STRUCTURAL WORK
Not Applicable
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N T
R A
C T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
E N
U M
B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
C. CIVIL WORK
PART III – MECHANICAL WORKS
PART IV – ELECTRICAL WORK
1 Sonic bird control system Part IV Item 1
3 3 3 3 3 30
2 Cables Part IV Items 2, 17
3 3 3 3 3 30
3 Electrical Panels Part IV Items 4,5,6,and 7
3 3 3 3 3 30
4 Interlocked outlets Part IV Item 8
3 3 3 3 3 30
5 Digital Multimeter Part IV Item 9
3 3 3 3 3 30
6 Outlets Part IV Items 10,11 and 12
3 3 3 3 3 30
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N T
R A
C T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
E N
U M
B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
7 Floor Base channel Part IV Item 13
3 3 3 3 3 30
8 Lighting fixtures Part IV Items ,18 , 19 and 20
3 3 3 3 3 30
9 Communication outlets Part IV Items 21
3 3 3 3 3 30
10 Communication rack Part IV Item 23
3 3 3 3 3 30
11 LPS
Part IV Item 27
3 3 3 3 3 30
12 Access points Part IV Item 24
3 3 3 3 3 30
13 Temperature control panel Part IV Item 25
3 3 3 3 3 30
14 Electromagnetic holders Part IV Item 26
3 3 3 3 3 30
15 Electrical system tests Part IV Item 28
3 30
16 Telecom. system tests Part IV Item 29
3 30
REVISED MASTER SPECIFICATIONS
SECTION 01100/R GENERAL CONDITIONS
SECTION 01101/R PROJECT SIGN
SECTION 02220/R SITE DEMOLITION
SECTION 03300/R CAST-IN-PLACE CONCRETE
SECTION 04200/R MASONRY
SECTION 05310/R STEEL DECKS
SECTION 05500/R METAL FABRICATIONS
SECTION 07220/R ROOF INSULATION
SECTION 07600/R FLASHING AND SHEET METAL
SECTION 07840/R FIRESTOPPING
SECTION 07920/R JOINT SEALANTS
SECTION 08110/R STEEL DOORS AND STEEL FRAMES
SECTION 08120/R ALUMINUM DOORS, FRAMES AND SIDELIGHTS
SECTION 08520/R ALUMINUM WINDOWS
SECTION 08800/R GLAZING
SECTION 09212/R EXTERIOR STUCCO
SECTION 09220/R INTERIOR PLASTER
SECTION 09510/R ACOUSTICAL CEILING
SECTION 09900/R PAINTS AND COATINGS
SECTION 13281/R ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS ... 59
SECTION 15070/R MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
SECTION 15181/R CHILLED WATER AND HOT WATER PIPING
SECTION 15400/R PLUMBING
SECTION 15601/R CENTRAL REFRIGERATION EQUIPMENT FOR AIR CONDITIONING
SECTION 15720/R AIR HANDLING AND DISTRIBUTION EQUIPMENT
SECTION 16050/R BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 16316/R SWITCHBOARDS
SECTION 16402/R INTERIOR DISTRIBUTION SYSTEMS
SECTION 16510/R INTERIOR LIGHTING
SECTION 16530/R EXTERIOR LIGHTING
SECTION 16710/R STRUCTURED TELECOMMUNICATIONS CABLING AND PATHWAY SYSTEM . 77
ADDITIONAL SPECIFICATIONS
UFGS 23 09 23.13 20 R BACNET DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
SECTION 264100 LIGHTNING PROTECTION SYSTEM
Section 01100/R 25
SECTION 01100/R
GENERAL CONDITIONS
PART 1 – APPLICABLE NORMS
Paragraph 1.1:
Delete:
a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system and electrical system.
Add:
a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system, fire protection system and electrical system.
c. Legislative Decree No. 494 dated 14 August 1996 .
d. Legislative Decree No. 528 dated 19 November 1999.
c. Legislative Decree No. 81 dated 9 April 2008.
Paragraph 1.2.2
Replace “Law No. 46 dated 5 March 1990” with “ Ministerial Decree 37/2007
Paragraph 1.2.3
a. Certificate of compliance for electrical systems in accordance with
CEI regulations and with D.P.R. No.547 dated 27 April 1955 on accident prevention.
a. Certificate of approval of the grounding and lightning protection systems, in accordance to CEI Norms and D.P.R. No. 462/01.
Revise Paragraph "3.2 UTILITY CUT-OFF" as follows:
Delete "ten (10) days" and insert "three (3) weeks" .
-- End of Section --
Section 01101/R 26
SECTION 01101/R
PROJECT SIGN
PART 1 - PROJECT SIGN
1.1 Scope
Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.
PART 2 - GENERAL
The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the
Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site.
The sign shall contain the following information in English:
a. Project No.
b. Project description
c. Constructed under Supervision of Base Civil Engineering
d. Contracted by 31st Contracting Squadron
e. Contractor
f. Design Engineer
g. Inspector
h. Contract Management: 31 CONS Construction Flight
i. ERP Coordinates
Lettering of the sign will be as shown on the following sketch, and may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.
Section 01101/R 27
-- End of Section –-
Section 02220/R 28
SECTION 02220/R
SITE DEMOLITION
Add the following paragraph:
1.1.5 Electrical and Electronic Equipment Waste Disposal (RAEE)
Disposal of the Electrical and Electronic Equipment Waste (RAEE) shall be in compliance with Legislative Decree No. 151 dated 25 July 2005:
Accomplishment of the European Directive Relevant to the Electrical and
Electronic Equipment Waste.
3.1 EXISTING ITEMS TO BE REMOVED
Delete the following sentence: “The existing temporary metal building shall be dismantled and will remain Contractor’s property.”
Add the following sentence: “ The existing equipment to be saved will be indicated by the Contracting Officer’s Technical Representative:”
Section 03300/R 29
SECTION 03300/R
CAST-IN-PLACE CONCRETE
Ministerial Decree dated 9 Jan 1996 Technical Norms for the Calculations, Execution and Testing of Normal and
Prestressed Reinforced Concrete Structures and Metal Structures.
dated 16 Jan 1996 Technical Norms for Constructions in
Seismic Zone.
dated 14 Feb 1992 Technical Norms for the Calculations, Execution and testing of Normal and
Prestressed Reinforced Concrete Structures and metal Structures.
dated 16 Jan 1996 Technical Norms for Safety Test of the
Constructions, Load, and Live Loads.
Ministerial Circular No.65 dated 10 Apr 1997 Instruction for the application of
“Technical Norms for Constructions in
Seismic Zones” dated 16 Jan 1996”.
National Research Council(CNR-UNI)
Publication No. 10011/88 Steel structures; instruction for calculation, execution, testing, and maintenance.
dated 20 March 2003, No. 3274 “First Elements in Matter of General
Criteria for Seismic Classification of
National Territory and of Technical
Regulations for Construction in Seismic
Zone”.
dated 14 January 2008: “Technical Norms for Constructions”.
UNI EN 10002-1 (1992)Metallic Materials. Tensile Testing.
Method of Test (At Ambient Temperature).
UNI ENV 10080 (1997) Steel for the Reinforcement of
Concrete. Weldable Ribbed Reinforcing
Section 03300/R 30
Steel B500. Technical Delivery Conditions for Bars, Coils and Welded Fabric.
UNI EN 934-2 (2002) Admixtures for Concrete, Mortar and
Grout. Concrete Admixtures. Definitions, Requirements, Conformity, Marking and
Labeling.
UNI EN 206-1 (2001) Concrete. Specification, Performance, Production and Conformity.
UNI 8520 (1999)Aggregates for Concrete Mixes.
Definition, Classification and Properties.
UNI EN 10002-1 (2004)Metallic Materials. Tensile Testing.
Part 1: Method of Test at Ambient
Temperature.
UNI ENV 10080 (2005) Steel for the Reinforcement of
UNI EN 934-2 (2007) Admixtures for Concrete, Mortar and
Grout. Part 2: Concrete Admixtures.
Definitions, Requirements, Conformity, Marking and Labeling.
UNI EN 206-1 (2006) Concrete.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .