| CONSTRUCTION COST ESTIMATE BREAKDOWN - REV 2 | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| RESTORE HANGAR 1 BLDG 921, AREA F, AVIANO AB, ITALY - REPAIR WORKS | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 09-1031 | AREA F, AVIANO AIR BASE, ITALY | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| A. | REPAIR WORKS / Lavori di Ristrutturazione | |||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||||
| Ia Architectural - Ia Architettura | ||||||||||||
| NOT APPLICABLE/ Non applicabile | ||||||||||||
| Ib Structural Work - Ib Lavori Strutturali | ||||||||||||
| 1 | SURVEYED WALL DEMOLITION FOR HVAC PASSAGEWAY | |||||||||||
| Demolizione controllata di muratura par passaggi HVAC | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 2 | ROOF SLAB SLOT OPENINGS FOR HVAC PASSAGEWAY | |||||||||||
| Apertura asole in solaio copertura passaggi HVAC | IT. No. Art. n. | 2 | LS/AC | |||||||||
| Total structural - Totale Strutturali | ||||||||||||
| Ic Civil Work - Ic Lavori Civili | ||||||||||||
| NOT APPLICABLE/ Non applicabile | ||||||||||||
| Id Mechanical - Id Meccanico | ||||||||||||
| 1 | REMOVAL OF EXISTING AHUs W/ DUCTWORK, PIPES, VALVES, AIR GRILLES AND INSTALLED FITTINGS | |||||||||||
| Rimozione delle esistenti unità di trattamento aria comprei i canali, tubi, valvole, griglie ed accessori presenti | IT. No. Art. n. | 3 | LS/AC | |||||||||
| 2 | REMOVAL OF PUMPS, VALVE, PIPING AND FITTINGS INSIDE MECH ROOM 14 | |||||||||||
| Rimozione di elettropompe, valvole, tubazioni ed accessori nel locale meccanico 14 | IT. No. Art. n. | 4 | LS/AC | |||||||||
| 3 | REMOVAL OF MONOSPLIT SYSTEM W/ PIPE, WIRING, CONTROL PANEL | |||||||||||
| Rimozione di monosplit comprese le tubazioni, linee elettriche, pannello di controllo | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 4 | REMOVAL OF DUALSPLIT SYSTEM W/ PIPE, WIRING, CONTROL PANEL | |||||||||||
| Rimozione di dual split comprese le tubazioni, linee elettriche, pannello di controllo | IT. No. Art. n. | 6 | EA/NO | |||||||||
| 5 | REMOVAL OF FANCOIL WALL MOUNTED W/ FITTINGS | |||||||||||
| Rimozione di ventilconvettore a parete con accessori | IT. No. Art. n. | 7 | EA/NO | |||||||||
| 6 | REMOVAL OF ROOF EXHAUST FAN | |||||||||||
| Rimozione di ventilatore di estrazione | IT. No. Art. n. | 8 | EA/NO | |||||||||
| 7 | REMOVAL OF LITTLE CHILLER ON THE ROOF | |||||||||||
| Rimozione di piccolo chiller sulla copertura | IT. No. Art. n. | 9 | EA/NO | |||||||||
| 8 | REMOVAL OF PIPE W/ VALVES, INSULATION, BRACKETS AND FITTINGS | |||||||||||
| Rimozione di tubazioni incluse le valvole, la coibentazione, gli staffaggi e gli accessori | IT. No. Art. n. | 10 | LS/AC | |||||||||
| Total Mechanical - Totale Meccanico | ||||||||||||
| Ie Electrical - Ie Elettrico | ||||||||||||
| 1 | REMOVE ELECTRICAL SYSTEM FEEDING A/C EQUIPMENT | |||||||||||
| Rimozione dell'impianto elettrico alimentante le apparecchiature di Condizionamento | IT. No. Art. n. | 11 | LS / AC | |||||||||
| Total Electrical - Totale Elettrico | ||||||||||||
| TOTAL PART I - Totale Parte I | ||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | ||||||||||||
| IIa Architectural - IIa Architettonico | ||||||||||||
| 1 | LIGHT CONCRETE PADS AND SUPPORT BLOCKS FOR HVAC UNITS | |||||||||||
| Basamenti e Baggioli per Unità Hvac | IT. No. Art. n. | 1 | LS/AC | |||||||||
| Total Architectural - Totale Architettura | ||||||||||||
| IIb Structural Work - IIb Lavori Strutturali | ||||||||||||
| NOT APPLICABLE/ Non applicabile | ||||||||||||
| IIc Civil Work - IIc Lavori Civili | ||||||||||||
| NOT APPLICABLE/ Non applicabile | ||||||||||||
| TOTAL PART II / Totale Parte II | ||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||||
| IIIa - HVAC System / IIIa - Impianto di Condizionamento | ||||||||||||
| 1 | REVERSIBLE HEAT PUMP RHP-1 W/ LOW TEMP KIT, PUMP KIT, PARTIAL HEAT RECOVERY AND FITTINGS | |||||||||||
| Pompa di calore reversione RHP-1 con kit bassa tempertura, modulo idronico, recupero di calore parziale ed accessori | IT. No. Art. n. | 1 | EA/NO | |||||||||
| 2 | VERTICAL SINGLE STAGE TWIN CENTRIFUGAL PUMP, VARIABE SPEED W/ PRESSURE SENSOR & FITTINGS - CP1 | |||||||||||
| Pompa gemellare centrifuga a singolo stadio, velocità variabile con sensore di pressione ed accessori - CP1 | IT. No. Art. n. | 2a | EA/NO | |||||||||
| 3 | VERTICAL SINGLE STAGE TWIN CENTRIFUGAL PUMP, VARIABE SPEED W/ PRESSURE SENSOR & FITTINGS - CP2 | |||||||||||
| Pompa gemellare centrifuga a singolo stadio, velocità variabile con sensore di pressione ed accessori - CP2 | IT. No. Art. n. | 2b | EA/NO | |||||||||
| 4 | VERTICAL SINGLE STAGE TWIN CENTRIFUGAL PUMP, VARIABE SPEED W/ PRESSURE SENSOR & FITTINGS - CP4 | |||||||||||
| Pompa gemellare centrifuga a singolo stadio, velocità variabile con sensore di pressione ed accessori - CP4 | IT. No. Art. n. | 2c | EA/NO | |||||||||
| 5 | HIGH EFFICIENCIES CIRCULATOR - TWIN TYPE - CP3 | |||||||||||
| Circolatore ad alta efficienza - Gemellare - CP3 | IT. No. Art. n. | 3a | EA/NO | |||||||||
| 6 | HIGH EFFICIENCIES CIRCULATOR - SINGLE TYPE - CP5 | |||||||||||
| Circolatore ad alta efficienza - singolo - CP5 | IT. No. Art. n. | 3b | EA/NO | |||||||||
| 7 | HIGH EFFICIENCIES CIRCULATOR - SINGLE TYPE - CP6 | |||||||||||
| Circolatore ad alta efficienza - singolo - CP6 | IT. No. Art. n. | 4a | EA/NO | |||||||||
| 8 | INERTIAL TANK - IT-1 | |||||||||||
| Serbatoio inerziale - IT-1 | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 9 | EXPANSION TANK - ET-1 | |||||||||||
| Vaso di espansione - ET-1 | IT. No. Art. n. | 6a | EA/NO | |||||||||
| 10 | EXPANSION TANK - ET-2 | |||||||||||
| Vaso di espansione - ET-2 | IT. No. Art. n. | 6b | EA/NO | |||||||||
| 11 | EXPANSION TANK - ET-3 | |||||||||||
| Vaso di espansione - ET-3 | IT. No. Art. n. | 6c | EA/NO | |||||||||
| 11 | 2-WAY VALVE WITH ON/OFF MOTOR - DN100 | |||||||||||
| Valvola a 2 vie con motorizzazione on/off - DN100 | IT. No. Art. n. | 7 | EA/NO | |||||||||
| 12 | 3-WAY VALVE WITH ON/OFF MOTOR - DN40 | |||||||||||
| Valvola a 3 vie con motorizzazione on/off - DN40 | IT. No. Art. n. | 8 | EA/NO | |||||||||
| 13 | 3-WAY VALVE WITH MODULATING MOTOR - DN80 | |||||||||||
| Valvola a 3 vie con motorizzazione modulante- DN80 | IT. No. Art. n. | 9 | EA/NO | |||||||||
| 14 | ENERGY METER INTEGRATOR - DN 50 | |||||||||||
| Contabilizzatore di energia termica- DN 50 | IT. No. Art. n. | 10a | EA/NO | |||||||||
| 15 | ENERGY METER INTEGRATOR - DN 100 | |||||||||||
| Contabilizzatore di energia termica - DN 100 | IT. No. Art. n. | 10b | EA/NO | |||||||||
| 15 | BUTTERFLY VALVE - DN 25 | |||||||||||
| Valvola a farfalla - DN 25 | IT. No. Art. n. | 11a | EA/NO | |||||||||
| 16 | BUTTERFLY VALVE - DN 32 | |||||||||||
| Valvola a farfalla - DN 32 | IT. No. Art. n. | 11b | EA/NO | |||||||||
| 17 | BUTTERFLY VALVE - DN 40 | |||||||||||
| Valvola a farfalla - DN 40 | IT. No. Art. n. | 11c | EA/NO | |||||||||
| 18 | BUTTERFLY VALVE - DN 50 | |||||||||||
| Valvola a farfalla - DN 50 | IT. No. Art. n. | 11d | EA/NO | |||||||||
| 19 | BUTTERFLY VALVE - DN 80 | |||||||||||
| Valvola a farfalla - DN 80 | IT. No. Art. n. | 11e | EA/NO | |||||||||
| 20 | BUTTERFLY VALVE - DN 100 | |||||||||||
| Valvola a farfalla - DN 100 | IT. No. Art. n. | 11f | EA/NO | |||||||||
| 20 | CHECK VALVE - DN 20 | |||||||||||
| Valvola di ritegno - DN 20 | IT. No. Art. n. | 12a | EA/NO | |||||||||
| 21 | CHECK VALVE - DN 32 | |||||||||||
| Valvola di ritegno - DN 32 | IT. No. Art. n. | 12b | EA/NO | |||||||||
| 22 | CHECK VALVE - DN 40 | |||||||||||
| Valvola di ritegno - DN 40 | IT. No. Art. n. | 12c | EA/NO | |||||||||
| 23 | CHECK VALVE - DN 50 | |||||||||||
| Valvola di ritegno - DN 50 | IT. No. Art. n. | 12d | EA/NO | |||||||||
| 24 | CHECK VALVE - DN 100 | |||||||||||
| Valvola di ritegno - DN 100 | IT. No. Art. n. | 12e | EA/NO | |||||||||
| 24 | STRAINER FILTER - DN 25 | |||||||||||
| Filtro obliquo - DN 25 | IT. No. Art. n. | 13a | EA/NO | |||||||||
| 25 | STRAINER FILTER - DN 32 | |||||||||||
| Filtro obliquo - DN 32 | IT. No. Art. n. | 13b | EA/NO | |||||||||
| 26 | STRAINER FILTER - DN 40 | |||||||||||
| Filtro obliquo - DN 40 | IT. No. Art. n. | 13c | EA/NO | |||||||||
| 27 | STRAINER FILTER - DN 50 | |||||||||||
| Filtro obliquo - DN 50 | IT. No. Art. n. | 13d | EA/NO | |||||||||
| 28 | STRAINER FILTER - DN 100 | |||||||||||
| Filtro obliquo - DN 100 | IT. No. Art. n. | 13e | EA/NO | |||||||||
| 29 | STEEL ANTI VIBRATION CONNECTOR - DN 32 | |||||||||||
| Giunto antivibrante in acciaio - DN 32 | IT. No. Art. n. | 14a | EA/NO | |||||||||
| 30 | STEEL ANTI VIBRATION CONNECTOR - DN 40 | |||||||||||
| Giunto antivibrante in acciaio - DN 40 | IT. No. Art. n. | 14b | EA/NO | |||||||||
| 31 | STEEL ANTI VIBRATION CONNECTOR - DN 50 | |||||||||||
| Giunto antivibrante in acciaio - DN 50 | IT. No. Art. n. | 14c | EA/NO | |||||||||
| 32 | STEEL ANTI VIBRATION CONNECTOR - DN 100 | |||||||||||
| Giunto antivibrante in acciaio - DN 100 | IT. No. Art. n. | 14d | EA/NO | |||||||||
| 33 | Balancing valve - DN 20 | |||||||||||
| Giunto antivibrante - DN 20 | IT. No. Art. n. | 15a | EA/NO | |||||||||
| 34 | Balancing valve - DN 32 | |||||||||||
| Giunto antivibrante - DN 32 | IT. No. Art. n. | 15b | EA/NO | |||||||||
| 35 | Balancing valve - DN 100 | |||||||||||
| Giunto antivibrante - DN 100 | IT. No. Art. n. | 15c | EA/NO | |||||||||
| 34 | DRAIN AND VENT FOR CLOSED CIRCUIT IN ROOM 14 | |||||||||||
| Drenaggi e sfiati per i circuiti chiusi nella Room 14 | IT. No. Art. n. | 16 | LS / AC | |||||||||
| 35 | DRAIN LINE FOR ROOM 14 | |||||||||||
| Rete di scarico Room 14 | IT. No. Art. n. | 17 | LS / AC | |||||||||
| 36 | PRESSURE GAUGE FOR PIPE INSTALLATION | |||||||||||
| Manometro per tubazioni | IT. No. Art. n. | 18 | EA/NO | |||||||||
| 37 | THERMOMETER FOR PIPE INSTALLATION | |||||||||||
| Termometro per tubazioni | IT. No. Art. n. | 19 | EA/NO | |||||||||
| 38 | WATER SOFTENER - WS-1 | |||||||||||
| Addolcitore - WS-1 | IT. No. Art. n. | 20 | EA/NO | |||||||||
| 39 | CHEMICAL DOSING PUMP - DP-1 | |||||||||||
| Pompa dosatrice - DP-1 | IT. No. Art. n. | 21 | EA/NO | |||||||||
| 40 | REDUCED PRESSURE BACKFLOW PREVENTER - DN25 | |||||||||||
| Disconnettore a zone di pressione controllabili - DN25 | IT. No. Art. n. | 22 | EA/NO | |||||||||
| 41 | PRESSURE REGULATOR - DN25 | |||||||||||
| Riduttore di pressione - DN25 | IT. No. Art. n. | 23 | EA/NO | |||||||||
| 41 | SELF CLEANING AUTOMATIC FILTER - DN25 | |||||||||||
| Filtro autopulente automatico - DN25 | IT. No. Art. n. | 24 | EA/NO | |||||||||
| 42 | AUTOMATIC FILLING UNIT - DN20 | |||||||||||
| Gruppo di riempimento - DN20 | IT. No. Art. n. | 25 | EA/NO | |||||||||
| 42 | BALL VALVE - BRONZE BODY - DN15 | |||||||||||
| Valvola a sfera - Corpo in bronzo - DN15 | IT. No. Art. n. | 26a | EA/NO | |||||||||
| 42 | BALL VALVE - BRONZE BODY - DN20 | |||||||||||
| Valvola a sfera - Corpo in bronzo - DN20 | IT. No. Art. n. | 26b | EA/NO | |||||||||
| 43 | BALL VALVE - BRONZE BODY - DN25 | |||||||||||
| Valvola a sfera - Corpo in bronzo - DN255 | IT. No. Art. n. | 26c | EA/NO | |||||||||
| 43 | SLUDGE SEPARATOR AND CHEMICAL FEEDER (CPF) | |||||||||||
| Separatore di sporco e dosatore chimico | IT. No. Art. n. | 27 | EA/NO | |||||||||
| 44 | CONNECTION OF NEW HVAC SYSTEM TO EXISTING HOT WATER LINE FROM EXISTING EXTERNAL BOILER ROOM | |||||||||||
| Collegamento dei nuovi impianti HVAC al circuito acqua calda in arrivo dalla centrale termica esterna esistente | IT. No. Art. n. | 28 | LS / AC | |||||||||
| 45 | OUTDOOR AIR HANDLING UNIT W/ CONTROL SYSTEM - |
AHU-1
| Unità di trattamento aria da esterno - AHU-1 | IT. No. Art. n. | 29a | EA/NO |
| 46 | OUTDOOR AIR HANDLING UNIT W/ CONTROL SYSTEM - |
AHU-2
| Unità di trattamento aria da esterno - AHU-2 | IT. No. Art. n. | 29b | EA/NO |
| 47 | RECIRCULATION AIR HANDLING UNIT W/ SENSOR AND ACTUATOR - AHU- 5 | ||
| Unità di trattamento aria per ricircolo con sensori ed attuatori - AHU-5 | IT. No. Art. n. | 30a | EA/NO |
| 48 | RECIRCULATION AIR HANDLING UNIT W/ SENSOR AND ACTUATOR - AHU -6 | ||
| Unità di trattamento aria per ricircolo con sensori ed attuatori - AHU-6 | IT. No. Art. n. | 30b | EA/NO |
| 49 | RECIRCULATION AIR HANDLING UNIT W/ SENSOR AND ACTUATOR - AHU -7 | ||
| Unità di trattamento aria per ricircolo con sensori ed attuatori - AHU-7 | IT. No. Art. n. | 30c | EA/NO |
| 47 | COMPLETE SUPPLY AND RETURN AIR DUCTWORKS FOR AIR HANDLING UNITS AHU-1 , AHU-2, AHU-5, AHU-6, AHU-7 | ||
| Unità di Reti complete di canalizzaizoni di mandata e ripresa aria per le unità AHU-1, AHU-2, AHU-5, AHU-6, AHU-7 | IT. No. Art. n. | 31 | LS / AC |
| 48 | FANCOIL UNIT FOR CEILING INSTALLATION COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-1 | ||
| Ventilconvettore per installazione pensile completo di canalizzaizoni, tubazioni e controlli - FC-1 | IT. No. Art. n. | 32a | EA/NO |
| 49 | FANCOIL UNIT FOR CEILING INSTALLATION COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-2 | ||
| Ventilconvettore per installazione pensile completo di canalizzaizoni, tubazioni e controlli - FC-2 | IT. No. Art. n. | 32b | EA/NO |
| 48 | FANCOIL UNIT FOR FALSE CEILING INSTALL. COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-1 | ||
| Ventilconvettore per installazione in controsoffitto completo di canalizzaizoni, tubazioni e controlli - FC-1 | IT. No. Art. n. | 33a | EA/NO |
| 49 | FANCOIL UNIT FOR FALSE CEILING INSTALL. COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-2 | ||
| Ventilconvettore per installazione in controsoffitto completo di canalizzaizoni, tubazioni e controlli - FC-2 | IT. No. Art. n. | 33b | EA/NO |
| 50 | FANCOIL UNIT FOR FALSE CEILING INSTALL. COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-3 | ||
| Ventilconvettore per installazione in controsoffitto completo di canalizzaizoni, tubazioni e controlli - FC-3 | IT. No. Art. n. | 33c | EA/NO |
| 51 | FANCOIL UNIT 6V COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-2 | ||
| Ventilconvettore a 6V completo di canalizzaizoni, tubazioni e controlli - FC-2 | IT. No. Art. n. | 34a | EA/NO |
| 52 | FANCOIL UNIT 6V COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-3 | ||
| Ventilconvettore a 6V completo di canalizzaizoni, tubazioni e controlli - FC-3 | IT. No. Art. n. | 34b | EA/NO |
| 53 | DEDICATED HVAC FOR BATT ROOM W/ AHU-4, EF-4 ATEX TYPE , DUCTWORK, PIPEWORK, CONTROL & FITTINGS | ||
| Impianto HVAC dedicato per la Battery Room completo di AHU-4, EF-4 atex, canali, tubazioni, controlli ed accessori. | IT. No. Art. n. | 35 | LS / AC |
| 54 | DEDICATED HVAC FOR LOX ROOM W/ AHU-3, EF-3 ATEX TYPE , DUCTWORK, PIPEWORK, CONTROL & FITTINGS | ||
| Impianto HVAC dedicato per la Battery Room completo di AHU-3, EF-3 atex, canali, tubazioni, controlli ed accessori. | IT. No. Art. n. | 36 | LS / AC |
| 55 | MAIN HOT / CHILLED PIPEWORK FROM MECH ROOM 14 INCLUDING PIPES, INSULATION, CONVER & FITTINGS | ||
| Reti principali acqua calda/refrigerata dalla Mech Room 14 comprensive di tubi, isolamenti, rivestimenti ed accessori. | IT. No. Art. n. | 37 | LS / AC |
| 56 | DX UNIT FOR ROOM 33 | ||
| Unità ad espansione diretta per il locale 33 | IT. No. Art. n. | 38 | EA/NO |
| 57 | HOT WATER PIPEWORK FROM ROOM 14 TO H. BAY HEAT EXCHANGER W/ PIPES, INSULATION, CONVER & FITTINGS | ||
| Circuito acqua calda dalla Mech Room 14 allo scambiatore area Bay inclusi tubi, isolamenti, rivestimenti ed accessori. | IT. No. Art. n. | 39 | LS / AC |
| 58 | COMPLETION OF MECHANICAL CONTROL SYSTEM - DDC TYPE - INCLUDING SENSORS, CONTROLLER AND FITTINGS | ||
| Completamento del di controllo dell'impianto meccanico - Tipo DDC - Completo di sensori, attuatori, regolatori ed accessori | IT. No. Art. n. | 40 | LS / AC |
| 59 | CONDENSATE DRAIN SYSTEM MAIN PIPELINES | ||
| Tubazioni principali del sistema di raccolta della condensa | IT. No. Art. n. | 41 | LS/AC |
| 60 | TESTING; ADJUSTING AND BALANCING OF THE HVAC SYSTEMS | ||
| Prove, tarature e bilanciamento impianti HVAC | IT. No. Art. n. | 42 | LS/AC |
| IIIb Plumbing system / IIIb Impianto Idraulico | |||
| 60 | PORTABLE EYEWASH W/ FITTINGS - WALL MOUNTED | ||
| Lavaocchi portatile con accessori - Montato a parete | IT. No. Art. n. | 43 | LS/AC |
| 61 | UPGRADING POTABLE WATER AND COMPRESSED AIR CONNECTION POINTS IN THE SHOP AREA | ||
| Modifiche ai punti di prelievo acqua potabile ed aria compressa nell'area delle officine | IT. No. Art. n. | 44 | LS/AC |
| 61 | NEW COMPRESSED AIR LINE IN BAY AREA | ||
| Nuova linea aria compressa nell'area BAY | IT. No. Art. n. | 45 | LS/AC |
| 62 | RELOCATION OF COMPRESSED AIR EQUIPMENTS | ||
| Modifiche ai punti di prelievo acqua potabile ed aria compressa nell'area delle officine | IT. No. Art. n. | 46 | LS/AC |
| 62 | RELOCATION OF EXISTING FOAM CONCENTRATE TAN K AND BLADDER REPLACEMENT | ||
| Spostamento dell'esistente serbatoio della schiuma e sostituzione della membrana | IT. No. Art. n. | 47 | LS/AC |
| 63 | FOAM GENERATOR REPAIR | ||
| Riparazione generatore di schiuma | IT. No. Art. n. | 48 | LS/AC |
| TOTAL PART III / Totale Parte III | |||
| PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici | |||
| 1 | NEW 4P-250 A CIRCUIT BREAKER IN 400V MDP | ||
| Nuovo interruttore 4P-250 A nel MDP a 400 V | IT. No. Art. n. | 1 | EA / No |
| 2 | A/C PANEL | ||
| Quadro elettrico per A/C | IT. No. Art. n. | 2 | EA / No |
| 3 | A/C SYSTEM DISTRIBUTION | ||
| Distribuzione impianto A/C | IT. No. Art. n. | 3 | LS / AC |
| 4 | COMPRESSOR SYSTEM DISCONNECT SWITCH | ||
| Sezionatore impianto aria compressa | IT. No. Art. n. | 4 | EA / No |
| 5 | LIGHTING FIXTURE REINSTALLATION AND ADJUSTMENT | ||
| Reinstallazione e modifica elementi illuminanti | IT. No. Art. n. | 5 | LS / AC |
| TOTAL PART IV - Totale Parte IV | |||
| REPAIR WORKS SUMMARY / Riepilogo Lavori di Ristrutturazione | |||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | |||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | |||
| PART III - MECHANICAL WORK | |||
| PART IV - ELECTRICAL WORK | |||
| TOTAL PRICE / Costo Totale |
Page &P of &N
Sustain works
| CONSTRUCTION COST ESTIMATE BREAKDOWN - REV 2 | |||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||
| RESTORE HANGAR 1 BLDG 921, AREA F, AVIANO AB, ITALY - SUSTAIN WORKS | |||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||||
| ASHE 09-1031 | AREA F, AVIANO AIR BASE, ITALY | ||||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||||
| B. | SUSTAIN WORK / Lavori di Manutenzione | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||||||||||||
| Ia Architectural - Ia Architettura | |||||||||||||
| 1 | REMOVAL OF WOOD DOORS | ||||||||||||
| Rimozione di porte in legno | IT. No. Art. n. | 1 | EA/NO | ||||||||||
| 2 | REMOVAL OF METAL DOORS | ||||||||||||
| Rimozione di porte in metallo | IT. No. Art. n. | 2 | EA/NO | ||||||||||
| 3 | REMOVAL OF METAL WINDOWS W/INSECT SCREEN | ||||||||||||
| Rimozione di finestre in metallo con rete antinsetto | IT. No. Art. n. | 3 | EA/NO | ||||||||||
| 4 | REMOVAL OF WINDOW METAL GRATE | ||||||||||||
| Rimozione di grate metalliche finestre | IT. No. Art. n. | 4 | KG | ||||||||||
| 5 | REM. OF 10X20cm GRES TILE FLOOR W/SETT.BED | ||||||||||||
| Rimozione di pavimento in gres 10x20 cm incluso massetto | IT. No. Art. n. | 5 | SM/MQ | ||||||||||
| 6 | REMOVAL OF CERAMIC BASEBOARD | ||||||||||||
| Rimozione di zoccolino in ceramica | IT. No. Art. n. | 6 | LM/ML | ||||||||||
| 7 | REMOVAL OF METAL WAINSCOTING | ||||||||||||
| Rimozione di rivestimento metallico | IT. No. Art. n. | 7 | SM/MQ | ||||||||||
| 8 | REMOVAL OF RUBBER/PAINT FLOOR INCL. SETTING BED | ||||||||||||
| Rimozione di pavimento in gomma/resina incluso massetto di posa | IT. No. Art. n. | 8 | SM/MQ | ||||||||||
| 9 | DEMOLITION OF GYPSUM BOARD PARTITIONS | ||||||||||||
| Demolizione di tramezzo in pannelli di gesso | IT. No. Art. n. | 9 | SM/MQ | ||||||||||
| 10 | REMOVAL OF SUSPENDED CEILING | ||||||||||||
| Rimozione di controsoffitto | IT. No. Art. n. | 10 | SM/MQ | ||||||||||
| 11 | REMOVAL OF MEMBRANE ROOFING, INCL. THERMAL INSULATION AND SLOPING BED | ||||||||||||
| Rimozione di impermeabilizzazione in copertura, incluso isolamento termico e massetto pendenze | IT. No. Art. n. | 11 | SM/MQ | ||||||||||
| 12 | REMOVAL OF METAL FLASHING | ||||||||||||
| Rimozione di scossalina metallica | IT. No. Art. n. | 12 | LM/ML | ||||||||||
| 13 | REMOVAL OF EXTERNAL STEP, ROOM 016 | ||||||||||||
| Rimozione di gradino esterni | IT. No. Art. n. | 13 | EA/NO | ||||||||||
| 14 | PARTIAL DEMOLITION OF INTERIOR PLASTER | ||||||||||||
| Demolizione parziale di intonaci interni | IT. No. Art. n. | 14 | SM/MQ | ||||||||||
| 15 | PARTIAL DEMOLITION OF EXTERIOR PLASTER | ||||||||||||
| Parziale demolizione di intonaci esterni | IT. No. Art. n. | 15 | SM/MQ | ||||||||||
| 16 | DEMOLITION OF EXISTING METAL CANOPY | ||||||||||||
| Demolizione di tettoia metallica esistente | IT. No. Art. n. | 16 | LS/AC | ||||||||||
| 17 | DEMOLITION OF EXISTING COMM ROOM, ROOM No. 33 | ||||||||||||
| Demolizione del locale telecomunicazioni, locale n. 33 | IT. No. Art. n. | 17 | LS/AC | ||||||||||
| 18 | HANGAR BAY, CUTTING OF EXISTING INDUSTRIAL PAVEMENT | ||||||||||||
| Hangar, taglio di pavimentazione industriale | IT. No. Art. n. | 18 | LM/ML | ||||||||||
| 19 | HANGAR BAY, TRENCH EXCAVATION IN EXISTING CONCRETE FLOOR FOR NEW CABLEDUCT | ||||||||||||
| Hangar, scavo in trincea in pavimentazione industriale in calcestruzzo per nuovo cavidotto | IT. No. Art. n. | 19 | CU.M/MC | ||||||||||
| 20 | HANGAR BAY, INDUSTRIAL CEMENT FLOOR SHOOT BLASTING | ||||||||||||
| Hangar, pulizia meccanica pavimentazione industriale | IT. No. Art. n. | 20 | SM/MQ | ||||||||||
| 21 | HANGAR BAY, SLIDING FRONT DOOR PANEL CUT FOR PASS 110x90 THRU DOOR INSTALLATION | ||||||||||||
| Hangar, taglio pannello portone scorrevole hangar per installazione portella 110x90 | IT. No. | 21 | LS/AC | ||||||||||
| 22 | REMOVAL OF CEMENT ASBESTOS DOWNSPOUT ELBOW | ||||||||||||
| Rimozione di raccordi in cemento amianto dei pluviali | IT. No. | 22 | EA/NO | ||||||||||
| Total Architectural - Totale Architettura | |||||||||||||
| Ib Structural Work - Ib Lavori Strutturali | |||||||||||||
| NOT APPLICABLE/ Non applicabile | |||||||||||||
| Ic Civil Work - Ic Lavori Civili | |||||||||||||
| NOT APPLICABLE/ Non applicabile | |||||||||||||
| Id Mechanical - Id Meccanico | |||||||||||||
| NOT APPLICABLE/ Non applicabile | |||||||||||||
| Ie Electrical - Ie Elettrico | |||||||||||||
| 1 | REMOVAL INTERLOCKED OUTLETS INCLUDING WIRING SYSTEM | ||||||||||||
| Rimozione prese interbloccate compresi i collegamenti | IT. No. Art. n. | 23 | LS/AC | ||||||||||
| 2 | REMOVAL ITALIAN/USA TYPE OUTLETS INCLUDING WIRING SYSTEM | ||||||||||||
| Rimozione prese tipo italiano/USA compresi i collegamenti | IT. No. Art. n. | 24 | LS/AC | ||||||||||
| 3 | REMOVAL ELECTRICAL PANELS | ||||||||||||
| Rimozione quadri elettrici | IT. No. Art. n. | 25 | LS/AC | ||||||||||
| 4 | REMOVAL OF WIRING SYSTEM FEEDING LIGHTING FIXTURES | ||||||||||||
| Rimozione di collegamenti elettrici alimentanti i corpi illuminanti esistenti | IT. No. Art. n. | 26 | LS/AC | ||||||||||
| 5 | REMOVAL OF TELECOMM OUTLETS INCLUDING WIRING SYSTEM | ||||||||||||
| Rimozione di prese telefoniche compresi i collegamenti | IT. No. Art. n. | 27 | LS/AC | ||||||||||
| 6 | REMOVAL OF TELECOMM RACK Rimozione armdi telefonici | IT. No. Art. n. | 28 | LS/AC | |||||||||
| 7 | REMOVAL GROUNDING & LIGHTNING PROTECTION SYSTEM Rimozione impianti di terra e parafulmini | IT. No. Art. n. | 29 | LS/AC | |||||||||
| 8 | REMOVAL AND REINSTALL OF FIRE DETECTION EQUIPMENT Rimozione e reinstallazione di apparecchiature rilevazione incendi | IT. No. Art. n. | 30 | LS/AC | |||||||||
| 9 | REMOVAL OF OUTDOOR LIGHTING FIXTURES INCLUDING WIRING SYSTEM Rimozione dei corpi illuminanti esterni compresi i collegamenti | IT. No. Art. n. | 31 | LS/AC | |||||||||
| Total Electrical - Totale Elettrico | |||||||||||||
| TOTAL PART I / Totale Parte I | |||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | |||||||||||||
| IIa Architectural - IIa Architettonico | |||||||||||||
| 1 | 30x30 CM GRANITE CERAMIC TILE FLOOR, INCL SETT. BED | ||||||||||||
| Pavimento in piastrelle di granito ceramico 30x30, incl. massetto | IT. No. Art. n. | 1 | SM/MQ | ||||||||||
| 2 | GRANITE CERAMIC COVE BASE | ||||||||||||
| Zoccolino in granito ceramico | IT. No. Art. n. | 2 | LM/ML | ||||||||||
| 3 | EPOXY RESIN ON INDUSTRIAL FLOOR IN ANNEX AREA | ||||||||||||
| Applicazione di resina epossidica su pavimento industriale nelle aree di supporto. | IT. No. Art. n. | 3 | SM/MQ | ||||||||||
| 4 | RUBBER COVE BASE | ||||||||||||
| Zoccolino in gomma | IT. No. Art. n. | 4 | LM/ML | ||||||||||
| 5 | RUBBER FLOOR SETTING BED | ||||||||||||
| Letto di posa pavimento in gomma | IT. No. Art. n. | 5 | SM/MQ | ||||||||||
| 6 | MINERAL FIBER PANEL SUSPENDED CEILING | ||||||||||||
| Controsoffitto in pannelli di fibra minerale | IT. No. Art. n. | 6 | SM/MQ | ||||||||||
| 7 | PAINT INTERIOR SURFACES WITH WATER ENAMEL | ||||||||||||
| Pitturazione con idropittura lavabile delle superfici interne | IT. No. Art. n. | 7 | SM/MQ | ||||||||||
| 8 | PAINT INTERIOR CEILING | ||||||||||||
| Pitturazione a tempera dei soffitti | IT. No. Art. n. | 8 | SM/MQ | ||||||||||
| 9 | PAINT EXTERIOR SURFACES WITH WATER ENAMEL | ||||||||||||
| Pitturazione con idropittura lavabile delle superfici esterne | IT. No. Art. n. | 9 | SM/MQ | ||||||||||
| 10 | INTERIOR PLASTER | ||||||||||||
| Intonaco interno | IT. No. Art. n. | 10 | SM/MQ | ||||||||||
| 11 | EXTERIOR PLASTER | ||||||||||||
| Intonaco esterno | IT. No. Art. n. | 11 | SM/MQ | ||||||||||
| 12 | 240x220cm REI120 STEEL DOORS, Di1 Type | ||||||||||||
| Porta in acciaio 240x220 REI120, tipo Di1 | IT. No. Art. n. | 12a | EA/NO | ||||||||||
| 13 | 120x220cm REI120 STEEL DOORS, Di2 Type | ||||||||||||
| Porta in acciaio 120x220 REI120, tipo Di2 | IT. No. Art. n. | 12b | EA/NO | ||||||||||
| 14 | 150x250cm REI120 STEEL DOORS, Di3 Type | ||||||||||||
| Porta in acciaio 150x250 REI120, tipo Di3 | IT. No. Art. n. | 12c | EA/NO | ||||||||||
| 15 | 220x250cm REI120 STEEL DOORS, Di4 Type | ||||||||||||
| Porta in acciaio 220x250 REI120, tipo Di4 | IT. No. Art. n. | 12d | EA/NO | ||||||||||
| 16 | 90x215cm REI120 STEEL DOORS, Di5 Type | ||||||||||||
| Porta in acciaio 90x215 REI120, tipo Di5 | IT. No. Art. n. | 12e | EA/NO | ||||||||||
| 17 | 100x220 INTERIOR WOOD DOOR, Di6 Type | ||||||||||||
| Porte interne in legno 100x220, tipo Di6 | IT. No. Art. n. | 13a | EA/NO | ||||||||||
| 18 | 170x210 INTERIOR WOOD DOOR, Di7 Type | ||||||||||||
| Porte interne in legno 170x210, tipo Di7 | IT. No. Art. n. | 13b | EA/NO | ||||||||||
| 19 | 80x210 INTERIOR WOOD DOOR, Di8 Type | ||||||||||||
| Porte interne in legno 80x210, tipo Di8 | IT. No. Art. n. | 13c | EA/NO | ||||||||||
| 20 | 100x210 INTERIOR WOOD DOOR, Di9 Type | ||||||||||||
| Porte interne in legno 100x210, tipo Di9 | IT. No. Art. n. | 13d | EA/NO | ||||||||||
| 21 | 100x230 INTERIOR WOOD DOOR, Di10 Type | ||||||||||||
| Porte interne in legno 100x230, tipo Di10 | IT. No. Art. n. | 13e | EA/NO | ||||||||||
| 22 | 70x220 INTERIOR STEEL DOOR, Di11 Type | ||||||||||||
| Porte interne in acciaio 70x220, tipo Di11 | IT. No. Art. n. | 14 | EA/NO | ||||||||||
| 23 | 190x265 EXTERIOR ALUMINUM DOOR, De1 Type | ||||||||||||
| Porte esterne in alluminio 190x265, tipo De1 | IT. No. Art. n. | 15 | EA/NO | ||||||||||
| 24 | 150x225 EXTERIOR STEEL DOOR, De2 Type | ||||||||||||
| Porte esterne in acciaio 150x225, tipo De2 | IT. No. Art. n. | 16a | EA/NO | ||||||||||
| 25 | 100x215 EXTERIOR STEEL DOOR, De3 Type | ||||||||||||
| Porte esterne in acciaio 100x215, tipo De3 | IT. No. Art. n. | 16b | EA/NO | ||||||||||
| 26 | 110x230 EXTERIOR STEEL DOOR, De4 Type | ||||||||||||
| Porte esterne in acciaio 110x230, tipo De4 | IT. No. Art. n. | 16c | EA/NO | ||||||||||
| 27 | 140x220 EXTERIOR STEEL DOOR, De5 Type | ||||||||||||
| Porte esterne in acciaio 140x220, tipo De5 | IT. No. Art. n. | 16d | EA/NO | ||||||||||
| 28 | 190x220 EXTERIOR STEEL DOOR, De6 Type | ||||||||||||
| Porte esterne in acciaio 190x220, tipo De6 | IT. No. Art. n. | 16e | EA/NO | ||||||||||
| 29 | 100x220 EXTERIOR STEEL DOOR, De7 Type | ||||||||||||
| Porte esterne in acciaio 100x220, tipo De7 | IT. No. Art. n. | 16f | EA/NO | ||||||||||
| 30 | 315x270 ROLLING UP EXTERIOR DOOR, De8 Type | ||||||||||||
| Portone esterno a saracinesca 315x270, tipo De8 | IT. No. Art. n. | 17 | EA/NO | ||||||||||
| 31 | 155x150cm ANDZ. ALUM. WINDOW , F1 Type | ||||||||||||
| Finestra in alluminio anodiz., 155x155 cm, tipo F1 | IT. No. Art. n. | 18a | EA/NO | ||||||||||
| 32 | 115x155cm ANDZ. ALUM. WINDOW , F2 Type | ||||||||||||
| Finestra in alluminio anodiz., 115x155 cm, tipo F2 | IT. No. Art. n. | 18b | EA/NO | ||||||||||
| 33 | 140x150cm ANDZ. ALUM. WINDOW , F3 Type | ||||||||||||
| Finestra in alluminio anodiz., 140x150 cm, tipo F3 | IT. No. Art. n. | 18c | EA/NO | ||||||||||
| 34 | 220x155cm ANDZ. ALUM. WINDOW , F4 Type | ||||||||||||
| Finestra in alluminio anodiz., 220x155 cm, tipo F4 | IT. No. Art. n. | 18d | EA/NO | ||||||||||
| 35 | 100x125cm ANDZ. ALUM. WINDOW , F5 Type | ||||||||||||
| Finestra in alluminio anodiz., 100x125 cm, tipo F5 | IT. No. Art. n. | 18e | EA/NO | ||||||||||
| 36 | Dia. 130cm ANDZ. ALUM. WINDOW , F6 Type | ||||||||||||
| Finestra in alluminio anodiz., dia 130 cm, tipo F6 | IT. No. Art. n. | 18f | EA/NO | ||||||||||
| 37 | 140x140cm ANDZ. ALUM. WINDOW , F7 Type | ||||||||||||
| Finestra in alluminio anodiz., 140x140 cm, tipo F7 | IT. No. Art. n. | 18g | EA/NO | ||||||||||
| 38 | 215x270cm ANDZ. ALUM. WINDOW , F8 Type | ||||||||||||
| Finestra in alluminio anodiz., 215x270 cm, tipo F8 | IT. No. Art. n. | 18h | EA/NO | ||||||||||
| 39 | 165x155cm ANDZ. ALUM. WINDOW , F9 Type | ||||||||||||
| Finestra in alluminio anodiz., 165x155 cm, tipo F9 | IT. No. Art. n. | 18i | EA/NO | ||||||||||
| 40 | 105x95cm ANDZ. ALUM. WINDOW , F10 Type | ||||||||||||
| Finestra in alluminio anodiz., 105x95 cm, tipo F10 | IT. No. Art. n. | 18j | EA/NO | ||||||||||
| 41 | 140x800cm ANDZ. ALUM. WINDOW , F11 Type | ||||||||||||
| Finestra in alluminio anodiz., 140x80 cm, tipo F11 | IT. No. Art. n. | 18k | EA/NO | ||||||||||
| 42 | 117x143cm ANDZ. ALUM. WINDOW , F12 Type | ||||||||||||
| Finestra in alluminio anodiz., 117x143 cm, tipo F12 | IT. No. Art. n. | 18l | EA/NO | ||||||||||
| 43 | GLAZING PANEL REPLACEMENT | ||||||||||||
| Sostituzione pannelli vetrati | IT. No. Art. n. | 19 | SM/MQ | ||||||||||
| 44 | EXTERNAL STEPS REPAIR | ||||||||||||
| Ripristino gradini esterni | IT. No. Art. n. | 20 | LS/AC | ||||||||||
| 45 | 8/10 MM ALLMINUM FLASHINGS | ||||||||||||
| Scossaline in alluminio da 8/10mm | IT. No. Art. n. | 21 | LM/ML | ||||||||||
| 46 | NEW ROOFING | ||||||||||||
| Nuovo pacchetto di copertura | IT. No. Art. n. | 22 | SM/MQ | ||||||||||
| 47 | 25CM THICK LOAD BEARING WALL | ||||||||||||
| Muro porttante, spessore 25cm | IT. No. Art. n. | 23 | SM/MQ | ||||||||||
| 48 | CEILING CORRUGATED STEEL SLAB | ||||||||||||
| Solaio di copertura in lamiera grecata | IT. No. Art. n. | 24 | SM/MQ | ||||||||||
| 49 | HANGAR BAY CEMENT FLOOR REPAIR | ||||||||||||
| Ripristino pavimentazione in cemento hangar | IT. No. Art. n. | 25 | SM/MQ | ||||||||||
| 50 | HANGAR BAY CEMENT FLOOR SURFACE TREATMENT | ||||||||||||
| Trattamento superficiale pavimentazione in cemento hangar | IT. No. Art. n. | 26 | SM/MQ | ||||||||||
| 51 | 100x100CM PASS THRU SERVICE DOOR AT HANGAR DOOR | ||||||||||||
| Portella di servizio 100x100cm nel potone scorrevole hangar | IT. No. Art. n. | 27 | EA/NO | ||||||||||
| 52 | STEEL LADDER FOR ROOF ACCESS | ||||||||||||
| Scale metalliche per accesso in copertura | IT. No. Art. n. | 28 | KG | ||||||||||
| 53 | SAFETY GLVD STEEL RAILING | ||||||||||||
| Ringhiera di sicurezza in acciaio zincato | IT. No. Art. n. | 29 | KG | ||||||||||
| 54 | 180x80cm RECESSED COCCO MAT, ROOM 012 | ||||||||||||
| Zerbino incassato in cocco 180x80cm, locale 012 | IT. No. Art. n. | 30 | EA/NO | ||||||||||
| 55 | WALL MOUNTEDELECTROMAGNETIC DOOR HOLDERS | ||||||||||||
| Fermi elettromagnetici montati a parete | IT. No. Art. n. | 31a | EA/NO | ||||||||||
| 56 | FLOOR MOUNTED ELECTROMAGNETIC DOOR HOLDERS | ||||||||||||
| Fermi elettromagnetici montati a pavimento | IT. No. Art. n. | 31b | EA/NO | ||||||||||
| 57 | DOOR HOLDERS ANCHOR SYSTEM | ||||||||||||
| Ancora per fermi elettromagnetici | IT. No. Art. n. | 31c | EA/NO | ||||||||||
| 58 | HDPE DOWNSPOUT ELBOWS, INCL. SURFACES REPAIR | ||||||||||||
| Raccordi pluviali in PEAD, incluso ripristino superfici | IT. No. Art. n. | 32 | EA/NO | ||||||||||
| 59 | REI120 PARTITION WALL, ROOM 009. INCL. CEILING | ||||||||||||
| Tramezzo Rei120, locale 009. Incluso soletta di chiusura | IT. No. Art. n. | 33 | LS/AC | ||||||||||
| 59 | OVERHEAD DOOR REPAIR, ROOM 008 | ||||||||||||
| Riparazione portone sezionale, locale 008 | IT. No. Art. n. | 34 | LS/AC | ||||||||||
| Total Architectural - Totale architettonico | |||||||||||||
| IIb Structural Work - IIc Lavori Strutturali | |||||||||||||
| NOT APPLICABLE/ Non applicabile | |||||||||||||
| IIc Civil Work - IIc Lavori Civili | |||||||||||||
| NOT APPLICABLE/ Non applicabile | |||||||||||||
| TOTAL PART II / Totale Parte II | |||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | |||||||||||||
| NOT APPLICABLE/ Non applicabile | |||||||||||||
| PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici | |||||||||||||
| 1 | SONIC BIRD CONTROL SYSTEM | ||||||||||||
| Dissuasore sonoro allontanamento volatili | IT. No. Art. n. | 1 | LS/AC | ||||||||||
| 2 | NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x70+35N+35PE | ||||||||||||
| Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x70+35N+35PE | IT. No. Art. n. | 2a | LM/ML | ||||||||||
| 3 | NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x70+35N+35PE | ||||||||||||
| Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x70+35N+35PE | IT. No. Art. n. | 2b | LM/ML | ||||||||||
| 4 | NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x95+50N+50PE | ||||||||||||
| Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x95+50N+50PE | IT. No. Art. n. | 2c | LM/ML | ||||||||||
| 5 | NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x120+70N+70PE | ||||||||||||
| Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x120+70N+70PE | IT. No. Art. n. | 2d | LM/ML | ||||||||||
| 6 | NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x95+50N+50PE | ||||||||||||
| Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x95+50N+50PE | IT. No. Art. n. | 2e | LM/ML | ||||||||||
| 7 | NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x70+35N+35PE | ||||||||||||
| Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x70+35N+35PE | IT. No. Art. n. | 2f | LM/ML | ||||||||||
| 8 | 500x150 CABLE TRAY | ||||||||||||
| Canaletta 500x150 | IT. No. Art. n. | 2g | LM/ML | ||||||||||
| 9 | 100x75 CABLE TRAY | ||||||||||||
| Canaletta 100x75 | IT. No. Art. n. | 2h | LM/ML | ||||||||||
| 10 | NEW 4P-250A CIRCUIT BREAKER | ||||||||||||
| Nuovo interruttore 4P-250A | IT. No. Art. n. | 3 | EA/NO | ||||||||||
| 11 | NEW ELECTRICAL PANELS A AND B - PANEL A | ||||||||||||
| Nuovi quadri elettrici A e B - Quadro A | IT. No. Art. n. | 4a | EA/NO | ||||||||||
| 12 | NEW ELECTRICAL PANELS A AND B - QUADRO B | ||||||||||||
| Nuovi quadri elettrici A e B - Quadro B | IT. No. Art. n. | 4b | EA/NO | ||||||||||
| 13 | NEW ELECTRICAL PANELS C AND D - PANEL C | ||||||||||||
| Nuovi quadri elettrici C e D - Quadro C | IT. No. Art. n. | 5a | EA/NO | ||||||||||
| 14 | NEW ELECTRICAL PANELS C AND D - PANEL D | ||||||||||||
| Nuovi quadri elettrici C e D - Quadro D | IT. No. Art. n. | 5b | EA/NO | ||||||||||
| 15 | NEW ELECTRICAL PANEL HBOP | ||||||||||||
| Nuovo quadro elettrico HBOP | IT. No. Art. n. | 6 | EA/NO | ||||||||||
| 16 | NEW ZONE OUTLET PANEL | ||||||||||||
| Nuovo quadro prese di zona | IT. No. Art. n. | 7 | EA/NO | ||||||||||
| 17 | NEW INTERLOCKED OUTLETS | ||||||||||||
| Nove prese interbloccate | IT. No. Art. n. | 8 | EA/NO | ||||||||||
| 18 | NEW IDIGITAL MULTI-METER | ||||||||||||
| Novo Multimetro Digitale | IT. No. Art. n. | 9 | EA/NO | ||||||||||
| 19 | NEW OUTLETS ITALIAN STYLE | ||||||||||||
| Nuove prese tipo Italiano | IT. No. Art. n. | 10 | EA/NO | ||||||||||
| 20 | NEW OUTLETS USA STYLE | ||||||||||||
| Nuove prese tipo USA | IT. No. Art. n. | 11 | EA/NO | ||||||||||
| 21 | NEW GROUND FAULT OUTLETS | ||||||||||||
| Nuove prese con differenziale | IT. No. Art. n. | 12 | EA/NO | ||||||||||
| 22 | TWO SECTION 195x65 FLOOR BASE CHANNEL | ||||||||||||
| Canalina battiscopa a due scomparti 195x65 | IT. No. Art. n. | 13 | LM/ML | ||||||||||
| 23 | CIVIL OUTLET POINT | ||||||||||||
| Punto presa civile | IT. No. Art. n. | 14 | EA/NO | ||||||||||
| 24 | LIGHTING POINT | ||||||||||||
| Punto luce | IT. No. Art. n. | 15 | EA/NO | ||||||||||
| 25 | UPGRADING EXISTING 10% LIGHTING FIXTURES | ||||||||||||
| Revisione 10% corpi illuminanti esistenti | IT. No. Art. n. | 16 | LS/AC | ||||||||||
| 26 | NEW CABLES FEEDING NEW INTERLOCKED OUTLETS, 5x16 | ||||||||||||
| Nuovi cavi alimentanti le prese interbloccate, 5x16 | IT. No. Art. n. | 17a | LM/ML | ||||||||||
| 27 | NEW CABLES FEEDING NEW INTERLOCKED OUTLETS, 5x6 | ||||||||||||
| Nuovi cavi alimentanti le prese interbloccate, 5x6 | IT. No. Art. n. | 17b | LM/ML | ||||||||||
| 28 | NEW CABLES FEEDING NEW INTERLOCKED OUTLETS, 3x6 | ||||||||||||
| Nuovi cavi alimentanti le prese interbloccate, 3x6 | IT. No. Art. n. | 17c | LM/ML | ||||||||||
| 27 | NEW 2X36 W LIGHTING FIXTURES | ||||||||||||
| Nuovi corpi illuminanti 2x36 W | IT. No. Art. n. | 18 | EA/NO | ||||||||||
| 28 | NEW 4X18 W LIGHTING FIXTURES | ||||||||||||
| Nuovi corpi illuminanti 4X18 W | IT. No. Art. n. | 19 | EA/NO | ||||||||||
| 29 | NEW LED TYPE OUTDOOR FLOODLIGHTS | ||||||||||||
| Nuovi proiettori da esterno a LED | IT. No. Art. n. | 20 | EA/NO | ||||||||||
| 30 | NEW COMMUNICATION OUTLETS | ||||||||||||
| Nuove prese per comunicazioni | IT. No. Art. n. | 21 | EA/NO | ||||||||||
| 31 | NEW COMMUNICATION POINT | ||||||||||||
| Nuovo punto per comunicazioni | IT. No. Art. n. | 22 | EA/NO | ||||||||||
| 32 | NEW COMMUNICATION RACK - MAIN RACK | ||||||||||||
| Nuove Armadio per comunicazioni - Rack Principale | IT. No. Art. n. | 23a | EA/NO | ||||||||||
| 33 | NEW COMMUNICATION RACK - TR1 | ||||||||||||
| Nuove Armadio per comunicazioni - TR1 | IT. No. Art. n. | 23b | EA/NO | ||||||||||
| 34 | NEW COMMUNICATION RACK - TR2 | ||||||||||||
| Nuove Armadio per comunicazioni - TR2 | IT. No. Art. n. | 23c | EA/NO | ||||||||||
| 35 | NEW COMMUNICATION RACK - OPTIC FIBER CABLE | ||||||||||||
| Nuove Armadio per comunicazioni - Cavi Fibra Ottica | IT. No. Art. n. | 23d | LM/ML | ||||||||||
| 36 | NEW WIFI ACCESS POINT - OFFICES | ||||||||||||
| Nuovi punti di accesso WIFI - Uffici | IT. No. Art. n. | 24a | LS/AC | ||||||||||
| 37 | NEW WIFI ACCESS POINT - HANGAR BAY | ||||||||||||
| Nuovi punti di accesso WIFI - Area hangar | IT. No. Art. n. | 24b | LS/AC | ||||||||||
| 38 | NEW WIFI ACCESS POINT - OUTDOOR | ||||||||||||
| Nuovi punti di accesso WIFI - Esterno | IT. No. Art. n. | 24c | LS/AC | ||||||||||
| 39 | TEMPERATURE CONTROL PANEL | ||||||||||||
| Quadro controllo temperatura | IT. No. Art. n. | 25 | LS/AC | ||||||||||
| 40 | ELECTROMAGNETIC HOLDERS CONNECTIONS | ||||||||||||
| Collegamenti degli elettromagneti | IT. No. Art. n. | 26 | LS/AC | ||||||||||
| 41 | NEW LPS SYSTEM | ||||||||||||
| Nuovo impianto LPS | IT. No. Art. n. | 27 | LS/AC | ||||||||||
| 39 | ELECTRICAL SYSTEMS TESTS | ||||||||||||
| Collaudo Impianti Elettrici | IT. No. Art. n. | 28 | LS/AC | ||||||||||
| 40 | TELECOMM SYSTEM TESTS | ||||||||||||
| Collaudo Impianto Telefonico | IT. No. Art. n. | 29 | LS/AC | ||||||||||
| TOTAL PART IV - Totale Parte IV | |||||||||||||
| SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione | |||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | |||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | |||||||||||||
| PART IV - ELECTRICAL WORK | |||||||||||||
| TOTAL PRICE / Costo Totale |
Page &P of &N
Summary
| CONSTRUCTION COST ESTIMATE BREAKDOWN - REV 2 | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RESTORE HANGAR 1 BLDG 921, AREA F, AVIANO AB, ITALY | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 09-1031 | AREA F, AVIANO AIR BASE, ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| A. | REPAIR WORKS / Lavori di Ristutturazione | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||
| PART III - MECHANICAL WORK | ||||||||||
| PART IV - ELECTRICAL WORK | ||||||||||
| SUB TOTAL A. | ||||||||||
| B. | SUSTAIN WORKS / Lavori di Manutenzione | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||
| PART IV - ELECTRICAL WORK | ||||||||||
| SUB TOTAL B. | ||||||||||
| TOTAL PRICE / Costo Totale |
Page &P of &N
Grand Total
| RESTORE HANGAR 1 BLDG 921, AREA F, AVIANO AB, ITALY - REV 2 | |||||||||
| INSTRUCTIONS FOR COMPLETING AF FORM | |||||||||
| A. REPAIR | B. SUSTAIN | TOTAL A+B (€) | |||||||
| TOTAL MATERIAL COSTS | € | 0 | € | 0 | € | 0 | |||
| TOTAL LABOR COSTS | € | 0 | € | 0 | € | 0 | |||
| TOTAL OTHER DIRECT COSTS | € | 0 | € | 0 | € | 0 | |||
| TOTAL DIRECT COSTS | € | 0 | € | 0 | € | 0 | |||
| OVERHEAD | % | € | 0 | € | 0 | € | 0 | ||
| SUBTOTAL | € | 0 | € | 0 | € | 0 | |||
| PROFIT | % | € | 0 | € | 0 | € | 0 | ||
| TOTAL PRICE | € | 0 | € | 0 | € | 0 | |||
| DATE | FIRM NAME | ||||||||
| TITLE | BY | ||||||||
| INSTRUCTIONS TO OFFERORS |
&CPREVIOUS EDITION IS OBSOLETE&12 &RSheet &P of &N
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .