CONSTRUCTION COST ESTIMATE BREAKDOWN REV 2

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair works

CONSTRUCTION COST ESTIMATE BREAKDOWN - REV 2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RESTORE HANGAR 1 BLDG 921, AREA F, AVIANO AB, ITALY - REPAIR WORKS
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 09-1031AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
A.REPAIR WORKS / Lavori di Ristrutturazione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural - Ia Architettura
NOT APPLICABLE/ Non applicabile
Ib Structural Work - Ib Lavori Strutturali
1SURVEYED WALL DEMOLITION FOR HVAC PASSAGEWAY
Demolizione controllata di muratura par passaggi HVACIT. No. Art. n.1LS/AC
2ROOF SLAB SLOT OPENINGS FOR HVAC PASSAGEWAY
Apertura asole in solaio copertura passaggi HVACIT. No. Art. n.2LS/AC
Total structural - Totale Strutturali
Ic Civil Work - Ic Lavori Civili
NOT APPLICABLE/ Non applicabile
Id Mechanical - Id Meccanico
1REMOVAL OF EXISTING AHUs W/ DUCTWORK, PIPES, VALVES, AIR GRILLES AND INSTALLED FITTINGS
Rimozione delle esistenti unità di trattamento aria comprei i canali, tubi, valvole, griglie ed accessori presentiIT. No. Art. n.3LS/AC
2REMOVAL OF PUMPS, VALVE, PIPING AND FITTINGS INSIDE MECH ROOM 14
Rimozione di elettropompe, valvole, tubazioni ed accessori nel locale meccanico 14IT. No. Art. n.4LS/AC
3REMOVAL OF MONOSPLIT SYSTEM W/ PIPE, WIRING, CONTROL PANEL
Rimozione di monosplit comprese le tubazioni, linee elettriche, pannello di controlloIT. No. Art. n.5EA/NO
4REMOVAL OF DUALSPLIT SYSTEM W/ PIPE, WIRING, CONTROL PANEL
Rimozione di dual split comprese le tubazioni, linee elettriche, pannello di controlloIT. No. Art. n.6EA/NO
5REMOVAL OF FANCOIL WALL MOUNTED W/ FITTINGS
Rimozione di ventilconvettore a parete con accessoriIT. No. Art. n.7EA/NO
6REMOVAL OF ROOF EXHAUST FAN
Rimozione di ventilatore di estrazioneIT. No. Art. n.8EA/NO
7REMOVAL OF LITTLE CHILLER ON THE ROOF
Rimozione di piccolo chiller sulla coperturaIT. No. Art. n.9EA/NO
8REMOVAL OF PIPE W/ VALVES, INSULATION, BRACKETS AND FITTINGS
Rimozione di tubazioni incluse le valvole, la coibentazione, gli staffaggi e gli accessoriIT. No. Art. n.10LS/AC
Total Mechanical - Totale Meccanico
Ie Electrical - Ie Elettrico
1REMOVE ELECTRICAL SYSTEM FEEDING A/C EQUIPMENT
Rimozione dell'impianto elettrico alimentante le apparecchiature di CondizionamentoIT. No. Art. n.11LS / AC
Total Electrical - Totale Elettrico
TOTAL PART I - Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
1LIGHT CONCRETE PADS AND SUPPORT BLOCKS FOR HVAC UNITS
Basamenti e Baggioli per Unità HvacIT. No. Art. n.1LS/AC
Total Architectural - Totale Architettura
IIb Structural Work - IIb Lavori Strutturali
NOT APPLICABLE/ Non applicabile
IIc Civil Work - IIc Lavori Civili
NOT APPLICABLE/ Non applicabile
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
IIIa - HVAC System / IIIa - Impianto di Condizionamento
1REVERSIBLE HEAT PUMP RHP-1 W/ LOW TEMP KIT, PUMP KIT, PARTIAL HEAT RECOVERY AND FITTINGS
Pompa di calore reversione RHP-1 con kit bassa tempertura, modulo idronico, recupero di calore parziale ed accessoriIT. No. Art. n.1EA/NO
2VERTICAL SINGLE STAGE TWIN CENTRIFUGAL PUMP, VARIABE SPEED W/ PRESSURE SENSOR & FITTINGS - CP1
Pompa gemellare centrifuga a singolo stadio, velocità variabile con sensore di pressione ed accessori - CP1IT. No. Art. n.2aEA/NO
3VERTICAL SINGLE STAGE TWIN CENTRIFUGAL PUMP, VARIABE SPEED W/ PRESSURE SENSOR & FITTINGS - CP2
Pompa gemellare centrifuga a singolo stadio, velocità variabile con sensore di pressione ed accessori - CP2IT. No. Art. n.2bEA/NO
4VERTICAL SINGLE STAGE TWIN CENTRIFUGAL PUMP, VARIABE SPEED W/ PRESSURE SENSOR & FITTINGS - CP4
Pompa gemellare centrifuga a singolo stadio, velocità variabile con sensore di pressione ed accessori - CP4IT. No. Art. n.2cEA/NO
5HIGH EFFICIENCIES CIRCULATOR - TWIN TYPE - CP3
Circolatore ad alta efficienza - Gemellare - CP3IT. No. Art. n.3aEA/NO
6HIGH EFFICIENCIES CIRCULATOR - SINGLE TYPE - CP5
Circolatore ad alta efficienza - singolo - CP5IT. No. Art. n.3bEA/NO
7HIGH EFFICIENCIES CIRCULATOR - SINGLE TYPE - CP6
Circolatore ad alta efficienza - singolo - CP6IT. No. Art. n.4aEA/NO
8INERTIAL TANK - IT-1
Serbatoio inerziale - IT-1IT. No. Art. n.5EA/NO
9EXPANSION TANK - ET-1
Vaso di espansione - ET-1IT. No. Art. n.6aEA/NO
10EXPANSION TANK - ET-2
Vaso di espansione - ET-2IT. No. Art. n.6bEA/NO
11EXPANSION TANK - ET-3
Vaso di espansione - ET-3IT. No. Art. n.6cEA/NO
112-WAY VALVE WITH ON/OFF MOTOR - DN100
Valvola a 2 vie con motorizzazione on/off - DN100IT. No. Art. n.7EA/NO
123-WAY VALVE WITH ON/OFF MOTOR - DN40
Valvola a 3 vie con motorizzazione on/off - DN40IT. No. Art. n.8EA/NO
133-WAY VALVE WITH MODULATING MOTOR - DN80
Valvola a 3 vie con motorizzazione modulante- DN80IT. No. Art. n.9EA/NO
14ENERGY METER INTEGRATOR - DN 50
Contabilizzatore di energia termica- DN 50IT. No. Art. n.10aEA/NO
15ENERGY METER INTEGRATOR - DN 100
Contabilizzatore di energia termica - DN 100IT. No. Art. n.10bEA/NO
15BUTTERFLY VALVE - DN 25
Valvola a farfalla - DN 25IT. No. Art. n.11aEA/NO
16BUTTERFLY VALVE - DN 32
Valvola a farfalla - DN 32IT. No. Art. n.11bEA/NO
17BUTTERFLY VALVE - DN 40
Valvola a farfalla - DN 40IT. No. Art. n.11cEA/NO
18BUTTERFLY VALVE - DN 50
Valvola a farfalla - DN 50IT. No. Art. n.11dEA/NO
19BUTTERFLY VALVE - DN 80
Valvola a farfalla - DN 80IT. No. Art. n.11eEA/NO
20BUTTERFLY VALVE - DN 100
Valvola a farfalla - DN 100IT. No. Art. n.11fEA/NO
20CHECK VALVE - DN 20
Valvola di ritegno - DN 20IT. No. Art. n.12aEA/NO
21CHECK VALVE - DN 32
Valvola di ritegno - DN 32IT. No. Art. n.12bEA/NO
22CHECK VALVE - DN 40
Valvola di ritegno - DN 40IT. No. Art. n.12cEA/NO
23CHECK VALVE - DN 50
Valvola di ritegno - DN 50IT. No. Art. n.12dEA/NO
24CHECK VALVE - DN 100
Valvola di ritegno - DN 100IT. No. Art. n.12eEA/NO
24STRAINER FILTER - DN 25
Filtro obliquo - DN 25IT. No. Art. n.13aEA/NO
25STRAINER FILTER - DN 32
Filtro obliquo - DN 32IT. No. Art. n.13bEA/NO
26STRAINER FILTER - DN 40
Filtro obliquo - DN 40IT. No. Art. n.13cEA/NO
27STRAINER FILTER - DN 50
Filtro obliquo - DN 50IT. No. Art. n.13dEA/NO
28STRAINER FILTER - DN 100
Filtro obliquo - DN 100IT. No. Art. n.13eEA/NO
29STEEL ANTI VIBRATION CONNECTOR - DN 32
Giunto antivibrante in acciaio - DN 32IT. No. Art. n.14aEA/NO
30STEEL ANTI VIBRATION CONNECTOR - DN 40
Giunto antivibrante in acciaio - DN 40IT. No. Art. n.14bEA/NO
31STEEL ANTI VIBRATION CONNECTOR - DN 50
Giunto antivibrante in acciaio - DN 50IT. No. Art. n.14cEA/NO
32STEEL ANTI VIBRATION CONNECTOR - DN 100
Giunto antivibrante in acciaio - DN 100IT. No. Art. n.14dEA/NO
33Balancing valve - DN 20
Giunto antivibrante - DN 20IT. No. Art. n.15aEA/NO
34Balancing valve - DN 32
Giunto antivibrante - DN 32IT. No. Art. n.15bEA/NO
35Balancing valve - DN 100
Giunto antivibrante - DN 100IT. No. Art. n.15cEA/NO
34DRAIN AND VENT FOR CLOSED CIRCUIT IN ROOM 14
Drenaggi e sfiati per i circuiti chiusi nella Room 14IT. No. Art. n.16LS / AC
35DRAIN LINE FOR ROOM 14
Rete di scarico Room 14IT. No. Art. n.17LS / AC
36PRESSURE GAUGE FOR PIPE INSTALLATION
Manometro per tubazioniIT. No. Art. n.18EA/NO
37THERMOMETER FOR PIPE INSTALLATION
Termometro per tubazioniIT. No. Art. n.19EA/NO
38WATER SOFTENER - WS-1
Addolcitore - WS-1IT. No. Art. n.20EA/NO
39CHEMICAL DOSING PUMP - DP-1
Pompa dosatrice - DP-1IT. No. Art. n.21EA/NO
40REDUCED PRESSURE BACKFLOW PREVENTER - DN25
Disconnettore a zone di pressione controllabili - DN25IT. No. Art. n.22EA/NO
41PRESSURE REGULATOR - DN25
Riduttore di pressione - DN25IT. No. Art. n.23EA/NO
41SELF CLEANING AUTOMATIC FILTER - DN25
Filtro autopulente automatico - DN25IT. No. Art. n.24EA/NO
42AUTOMATIC FILLING UNIT - DN20
Gruppo di riempimento - DN20IT. No. Art. n.25EA/NO
42BALL VALVE - BRONZE BODY - DN15
Valvola a sfera - Corpo in bronzo - DN15IT. No. Art. n.26aEA/NO
42BALL VALVE - BRONZE BODY - DN20
Valvola a sfera - Corpo in bronzo - DN20IT. No. Art. n.26bEA/NO
43BALL VALVE - BRONZE BODY - DN25
Valvola a sfera - Corpo in bronzo - DN255IT. No. Art. n.26cEA/NO
43SLUDGE SEPARATOR AND CHEMICAL FEEDER (CPF)
Separatore di sporco e dosatore chimicoIT. No. Art. n.27EA/NO
44CONNECTION OF NEW HVAC SYSTEM TO EXISTING HOT WATER LINE FROM EXISTING EXTERNAL BOILER ROOM
Collegamento dei nuovi impianti HVAC al circuito acqua calda in arrivo dalla centrale termica esterna esistenteIT. No. Art. n.28LS / AC
45OUTDOOR AIR HANDLING UNIT W/ CONTROL SYSTEM -

AHU-1

Unità di trattamento aria da esterno - AHU-1IT. No. Art. n.29aEA/NO
46OUTDOOR AIR HANDLING UNIT W/ CONTROL SYSTEM -

AHU-2

Unità di trattamento aria da esterno - AHU-2IT. No. Art. n.29bEA/NO
47RECIRCULATION AIR HANDLING UNIT W/ SENSOR AND ACTUATOR - AHU- 5
Unità di trattamento aria per ricircolo con sensori ed attuatori - AHU-5IT. No. Art. n.30aEA/NO
48RECIRCULATION AIR HANDLING UNIT W/ SENSOR AND ACTUATOR - AHU -6
Unità di trattamento aria per ricircolo con sensori ed attuatori - AHU-6IT. No. Art. n.30bEA/NO
49RECIRCULATION AIR HANDLING UNIT W/ SENSOR AND ACTUATOR - AHU -7
Unità di trattamento aria per ricircolo con sensori ed attuatori - AHU-7IT. No. Art. n.30cEA/NO
47COMPLETE SUPPLY AND RETURN AIR DUCTWORKS FOR AIR HANDLING UNITS AHU-1 , AHU-2, AHU-5, AHU-6, AHU-7
Unità di Reti complete di canalizzaizoni di mandata e ripresa aria per le unità AHU-1, AHU-2, AHU-5, AHU-6, AHU-7IT. No. Art. n.31LS / AC
48FANCOIL UNIT FOR CEILING INSTALLATION COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-1
Ventilconvettore per installazione pensile completo di canalizzaizoni, tubazioni e controlli - FC-1IT. No. Art. n.32aEA/NO
49FANCOIL UNIT FOR CEILING INSTALLATION COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-2
Ventilconvettore per installazione pensile completo di canalizzaizoni, tubazioni e controlli - FC-2IT. No. Art. n.32bEA/NO
48FANCOIL UNIT FOR FALSE CEILING INSTALL. COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-1
Ventilconvettore per installazione in controsoffitto completo di canalizzaizoni, tubazioni e controlli - FC-1IT. No. Art. n.33aEA/NO
49FANCOIL UNIT FOR FALSE CEILING INSTALL. COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-2
Ventilconvettore per installazione in controsoffitto completo di canalizzaizoni, tubazioni e controlli - FC-2IT. No. Art. n.33bEA/NO
50FANCOIL UNIT FOR FALSE CEILING INSTALL. COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-3
Ventilconvettore per installazione in controsoffitto completo di canalizzaizoni, tubazioni e controlli - FC-3IT. No. Art. n.33cEA/NO
51FANCOIL UNIT 6V COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-2
Ventilconvettore a 6V completo di canalizzaizoni, tubazioni e controlli - FC-2IT. No. Art. n.34aEA/NO
52FANCOIL UNIT 6V COMPLETE OF DUCTWORKS, PIPEWORK, CONTROLS - FC-3
Ventilconvettore a 6V completo di canalizzaizoni, tubazioni e controlli - FC-3IT. No. Art. n.34bEA/NO
53DEDICATED HVAC FOR BATT ROOM W/ AHU-4, EF-4 ATEX TYPE , DUCTWORK, PIPEWORK, CONTROL & FITTINGS
Impianto HVAC dedicato per la Battery Room completo di AHU-4, EF-4 atex, canali, tubazioni, controlli ed accessori.IT. No. Art. n.35LS / AC
54DEDICATED HVAC FOR LOX ROOM W/ AHU-3, EF-3 ATEX TYPE , DUCTWORK, PIPEWORK, CONTROL & FITTINGS
Impianto HVAC dedicato per la Battery Room completo di AHU-3, EF-3 atex, canali, tubazioni, controlli ed accessori.IT. No. Art. n.36LS / AC
55MAIN HOT / CHILLED PIPEWORK FROM MECH ROOM 14 INCLUDING PIPES, INSULATION, CONVER & FITTINGS
Reti principali acqua calda/refrigerata dalla Mech Room 14 comprensive di tubi, isolamenti, rivestimenti ed accessori.IT. No. Art. n.37LS / AC
56DX UNIT FOR ROOM 33
Unità ad espansione diretta per il locale 33IT. No. Art. n.38EA/NO
57HOT WATER PIPEWORK FROM ROOM 14 TO H. BAY HEAT EXCHANGER W/ PIPES, INSULATION, CONVER & FITTINGS
Circuito acqua calda dalla Mech Room 14 allo scambiatore area Bay inclusi tubi, isolamenti, rivestimenti ed accessori.IT. No. Art. n.39LS / AC
58COMPLETION OF MECHANICAL CONTROL SYSTEM - DDC TYPE - INCLUDING SENSORS, CONTROLLER AND FITTINGS
Completamento del di controllo dell'impianto meccanico - Tipo DDC - Completo di sensori, attuatori, regolatori ed accessoriIT. No. Art. n.40LS / AC
59CONDENSATE DRAIN SYSTEM MAIN PIPELINES
Tubazioni principali del sistema di raccolta della condensaIT. No. Art. n.41LS/AC
60TESTING; ADJUSTING AND BALANCING OF THE HVAC SYSTEMS
Prove, tarature e bilanciamento impianti HVACIT. No. Art. n.42LS/AC
IIIb Plumbing system / IIIb Impianto Idraulico
60PORTABLE EYEWASH W/ FITTINGS - WALL MOUNTED
Lavaocchi portatile con accessori - Montato a pareteIT. No. Art. n.43LS/AC
61UPGRADING POTABLE WATER AND COMPRESSED AIR CONNECTION POINTS IN THE SHOP AREA
Modifiche ai punti di prelievo acqua potabile ed aria compressa nell'area delle officineIT. No. Art. n.44LS/AC
61NEW COMPRESSED AIR LINE IN BAY AREA
Nuova linea aria compressa nell'area BAYIT. No. Art. n.45LS/AC
62RELOCATION OF COMPRESSED AIR EQUIPMENTS
Modifiche ai punti di prelievo acqua potabile ed aria compressa nell'area delle officineIT. No. Art. n.46LS/AC
62RELOCATION OF EXISTING FOAM CONCENTRATE TAN K AND BLADDER REPLACEMENT
Spostamento dell'esistente serbatoio della schiuma e sostituzione della membranaIT. No. Art. n.47LS/AC
63FOAM GENERATOR REPAIR
Riparazione generatore di schiumaIT. No. Art. n.48LS/AC
TOTAL PART III / Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici
1NEW 4P-250 A CIRCUIT BREAKER IN 400V MDP
Nuovo interruttore 4P-250 A nel MDP a 400 VIT. No. Art. n.1EA / No
2A/C PANEL
Quadro elettrico per A/CIT. No. Art. n.2EA / No
3A/C SYSTEM DISTRIBUTION
Distribuzione impianto A/CIT. No. Art. n.3LS / AC
4COMPRESSOR SYSTEM DISCONNECT SWITCH
Sezionatore impianto aria compressaIT. No. Art. n.4EA / No
5LIGHTING FIXTURE REINSTALLATION AND ADJUSTMENT
Reinstallazione e modifica elementi illuminantiIT. No. Art. n.5LS / AC
TOTAL PART IV - Totale Parte IV
REPAIR WORKS SUMMARY / Riepilogo Lavori di Ristrutturazione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale

Page &P of &N

Sustain works

CONSTRUCTION COST ESTIMATE BREAKDOWN - REV 2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RESTORE HANGAR 1 BLDG 921, AREA F, AVIANO AB, ITALY - SUSTAIN WORKS
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 09-1031AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
B.SUSTAIN WORK / Lavori di Manutenzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural - Ia Architettura
1REMOVAL OF WOOD DOORS
Rimozione di porte in legnoIT. No. Art. n.1EA/NO
2REMOVAL OF METAL DOORS
Rimozione di porte in metalloIT. No. Art. n.2EA/NO
3REMOVAL OF METAL WINDOWS W/INSECT SCREEN
Rimozione di finestre in metallo con rete antinsettoIT. No. Art. n.3EA/NO
4REMOVAL OF WINDOW METAL GRATE
Rimozione di grate metalliche finestreIT. No. Art. n.4KG
5REM. OF 10X20cm GRES TILE FLOOR W/SETT.BED
Rimozione di pavimento in gres 10x20 cm incluso massettoIT. No. Art. n.5SM/MQ
6REMOVAL OF CERAMIC BASEBOARD
Rimozione di zoccolino in ceramicaIT. No. Art. n.6LM/ML
7REMOVAL OF METAL WAINSCOTING
Rimozione di rivestimento metallicoIT. No. Art. n.7SM/MQ
8REMOVAL OF RUBBER/PAINT FLOOR INCL. SETTING BED
Rimozione di pavimento in gomma/resina incluso massetto di posaIT. No. Art. n.8SM/MQ
9DEMOLITION OF GYPSUM BOARD PARTITIONS
Demolizione di tramezzo in pannelli di gessoIT. No. Art. n.9SM/MQ
10REMOVAL OF SUSPENDED CEILING
Rimozione di controsoffittoIT. No. Art. n.10SM/MQ
11REMOVAL OF MEMBRANE ROOFING, INCL. THERMAL INSULATION AND SLOPING BED
Rimozione di impermeabilizzazione in copertura, incluso isolamento termico e massetto pendenzeIT. No. Art. n.11SM/MQ
12REMOVAL OF METAL FLASHING
Rimozione di scossalina metallicaIT. No. Art. n.12LM/ML
13REMOVAL OF EXTERNAL STEP, ROOM 016
Rimozione di gradino esterniIT. No. Art. n.13EA/NO
14PARTIAL DEMOLITION OF INTERIOR PLASTER
Demolizione parziale di intonaci interniIT. No. Art. n.14SM/MQ
15PARTIAL DEMOLITION OF EXTERIOR PLASTER
Parziale demolizione di intonaci esterniIT. No. Art. n.15SM/MQ
16DEMOLITION OF EXISTING METAL CANOPY
Demolizione di tettoia metallica esistenteIT. No. Art. n.16LS/AC
17DEMOLITION OF EXISTING COMM ROOM, ROOM No. 33
Demolizione del locale telecomunicazioni, locale n. 33IT. No. Art. n.17LS/AC
18HANGAR BAY, CUTTING OF EXISTING INDUSTRIAL PAVEMENT
Hangar, taglio di pavimentazione industrialeIT. No. Art. n.18LM/ML
19HANGAR BAY, TRENCH EXCAVATION IN EXISTING CONCRETE FLOOR FOR NEW CABLEDUCT
Hangar, scavo in trincea in pavimentazione industriale in calcestruzzo per nuovo cavidottoIT. No. Art. n.19CU.M/MC
20HANGAR BAY, INDUSTRIAL CEMENT FLOOR SHOOT BLASTING
Hangar, pulizia meccanica pavimentazione industrialeIT. No. Art. n.20SM/MQ
21HANGAR BAY, SLIDING FRONT DOOR PANEL CUT FOR PASS 110x90 THRU DOOR INSTALLATION
Hangar, taglio pannello portone scorrevole hangar per installazione portella 110x90IT. No.21LS/AC
22REMOVAL OF CEMENT ASBESTOS DOWNSPOUT ELBOW
Rimozione di raccordi in cemento amianto dei pluvialiIT. No.22EA/NO
Total Architectural - Totale Architettura
Ib Structural Work - Ib Lavori Strutturali
NOT APPLICABLE/ Non applicabile
Ic Civil Work - Ic Lavori Civili
NOT APPLICABLE/ Non applicabile
Id Mechanical - Id Meccanico
NOT APPLICABLE/ Non applicabile
Ie Electrical - Ie Elettrico
1REMOVAL INTERLOCKED OUTLETS INCLUDING WIRING SYSTEM
Rimozione prese interbloccate compresi i collegamentiIT. No. Art. n.23LS/AC
2REMOVAL ITALIAN/USA TYPE OUTLETS INCLUDING WIRING SYSTEM
Rimozione prese tipo italiano/USA compresi i collegamentiIT. No. Art. n.24LS/AC
3REMOVAL ELECTRICAL PANELS
Rimozione quadri elettriciIT. No. Art. n.25LS/AC
4REMOVAL OF WIRING SYSTEM FEEDING LIGHTING FIXTURES
Rimozione di collegamenti elettrici alimentanti i corpi illuminanti esistentiIT. No. Art. n.26LS/AC
5REMOVAL OF TELECOMM OUTLETS INCLUDING WIRING SYSTEM
Rimozione di prese telefoniche compresi i collegamentiIT. No. Art. n.27LS/AC
6REMOVAL OF TELECOMM RACK Rimozione armdi telefoniciIT. No. Art. n.28LS/AC
7REMOVAL GROUNDING & LIGHTNING PROTECTION SYSTEM Rimozione impianti di terra e parafulminiIT. No. Art. n.29LS/AC
8REMOVAL AND REINSTALL OF FIRE DETECTION EQUIPMENT Rimozione e reinstallazione di apparecchiature rilevazione incendiIT. No. Art. n.30LS/AC
9REMOVAL OF OUTDOOR LIGHTING FIXTURES INCLUDING WIRING SYSTEM Rimozione dei corpi illuminanti esterni compresi i collegamentiIT. No. Art. n.31LS/AC
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
130x30 CM GRANITE CERAMIC TILE FLOOR, INCL SETT. BED
Pavimento in piastrelle di granito ceramico 30x30, incl. massettoIT. No. Art. n.1SM/MQ
2GRANITE CERAMIC COVE BASE
Zoccolino in granito ceramicoIT. No. Art. n.2LM/ML
3EPOXY RESIN ON INDUSTRIAL FLOOR IN ANNEX AREA
Applicazione di resina epossidica su pavimento industriale nelle aree di supporto.IT. No. Art. n.3SM/MQ
4RUBBER COVE BASE
Zoccolino in gommaIT. No. Art. n.4LM/ML
5RUBBER FLOOR SETTING BED
Letto di posa pavimento in gommaIT. No. Art. n.5SM/MQ
6MINERAL FIBER PANEL SUSPENDED CEILING
Controsoffitto in pannelli di fibra mineraleIT. No. Art. n.6SM/MQ
7PAINT INTERIOR SURFACES WITH WATER ENAMEL
Pitturazione con idropittura lavabile delle superfici interneIT. No. Art. n.7SM/MQ
8PAINT INTERIOR CEILING
Pitturazione a tempera dei soffittiIT. No. Art. n.8SM/MQ
9PAINT EXTERIOR SURFACES WITH WATER ENAMEL
Pitturazione con idropittura lavabile delle superfici esterneIT. No. Art. n.9SM/MQ
10INTERIOR PLASTER
Intonaco internoIT. No. Art. n.10SM/MQ
11EXTERIOR PLASTER
Intonaco esternoIT. No. Art. n.11SM/MQ
12240x220cm REI120 STEEL DOORS, Di1 Type
Porta in acciaio 240x220 REI120, tipo Di1IT. No. Art. n.12aEA/NO
13120x220cm REI120 STEEL DOORS, Di2 Type
Porta in acciaio 120x220 REI120, tipo Di2IT. No. Art. n.12bEA/NO
14150x250cm REI120 STEEL DOORS, Di3 Type
Porta in acciaio 150x250 REI120, tipo Di3IT. No. Art. n.12cEA/NO
15220x250cm REI120 STEEL DOORS, Di4 Type
Porta in acciaio 220x250 REI120, tipo Di4IT. No. Art. n.12dEA/NO
1690x215cm REI120 STEEL DOORS, Di5 Type
Porta in acciaio 90x215 REI120, tipo Di5IT. No. Art. n.12eEA/NO
17100x220 INTERIOR WOOD DOOR, Di6 Type
Porte interne in legno 100x220, tipo Di6IT. No. Art. n.13aEA/NO
18170x210 INTERIOR WOOD DOOR, Di7 Type
Porte interne in legno 170x210, tipo Di7IT. No. Art. n.13bEA/NO
1980x210 INTERIOR WOOD DOOR, Di8 Type
Porte interne in legno 80x210, tipo Di8IT. No. Art. n.13cEA/NO
20100x210 INTERIOR WOOD DOOR, Di9 Type
Porte interne in legno 100x210, tipo Di9IT. No. Art. n.13dEA/NO
21100x230 INTERIOR WOOD DOOR, Di10 Type
Porte interne in legno 100x230, tipo Di10IT. No. Art. n.13eEA/NO
2270x220 INTERIOR STEEL DOOR, Di11 Type
Porte interne in acciaio 70x220, tipo Di11IT. No. Art. n.14EA/NO
23190x265 EXTERIOR ALUMINUM DOOR, De1 Type
Porte esterne in alluminio 190x265, tipo De1IT. No. Art. n.15EA/NO
24150x225 EXTERIOR STEEL DOOR, De2 Type
Porte esterne in acciaio 150x225, tipo De2IT. No. Art. n.16aEA/NO
25100x215 EXTERIOR STEEL DOOR, De3 Type
Porte esterne in acciaio 100x215, tipo De3IT. No. Art. n.16bEA/NO
26110x230 EXTERIOR STEEL DOOR, De4 Type
Porte esterne in acciaio 110x230, tipo De4IT. No. Art. n.16cEA/NO
27140x220 EXTERIOR STEEL DOOR, De5 Type
Porte esterne in acciaio 140x220, tipo De5IT. No. Art. n.16dEA/NO
28190x220 EXTERIOR STEEL DOOR, De6 Type
Porte esterne in acciaio 190x220, tipo De6IT. No. Art. n.16eEA/NO
29100x220 EXTERIOR STEEL DOOR, De7 Type
Porte esterne in acciaio 100x220, tipo De7IT. No. Art. n.16fEA/NO
30315x270 ROLLING UP EXTERIOR DOOR, De8 Type
Portone esterno a saracinesca 315x270, tipo De8IT. No. Art. n.17EA/NO
31155x150cm ANDZ. ALUM. WINDOW , F1 Type
Finestra in alluminio anodiz., 155x155 cm, tipo F1IT. No. Art. n.18aEA/NO
32115x155cm ANDZ. ALUM. WINDOW , F2 Type
Finestra in alluminio anodiz., 115x155 cm, tipo F2IT. No. Art. n.18bEA/NO
33140x150cm ANDZ. ALUM. WINDOW , F3 Type
Finestra in alluminio anodiz., 140x150 cm, tipo F3IT. No. Art. n.18cEA/NO
34220x155cm ANDZ. ALUM. WINDOW , F4 Type
Finestra in alluminio anodiz., 220x155 cm, tipo F4IT. No. Art. n.18dEA/NO
35100x125cm ANDZ. ALUM. WINDOW , F5 Type
Finestra in alluminio anodiz., 100x125 cm, tipo F5IT. No. Art. n.18eEA/NO
36Dia. 130cm ANDZ. ALUM. WINDOW , F6 Type
Finestra in alluminio anodiz., dia 130 cm, tipo F6IT. No. Art. n.18fEA/NO
37140x140cm ANDZ. ALUM. WINDOW , F7 Type
Finestra in alluminio anodiz., 140x140 cm, tipo F7IT. No. Art. n.18gEA/NO
38215x270cm ANDZ. ALUM. WINDOW , F8 Type
Finestra in alluminio anodiz., 215x270 cm, tipo F8IT. No. Art. n.18hEA/NO
39165x155cm ANDZ. ALUM. WINDOW , F9 Type
Finestra in alluminio anodiz., 165x155 cm, tipo F9IT. No. Art. n.18iEA/NO
40105x95cm ANDZ. ALUM. WINDOW , F10 Type
Finestra in alluminio anodiz., 105x95 cm, tipo F10IT. No. Art. n.18jEA/NO
41140x800cm ANDZ. ALUM. WINDOW , F11 Type
Finestra in alluminio anodiz., 140x80 cm, tipo F11IT. No. Art. n.18kEA/NO
42117x143cm ANDZ. ALUM. WINDOW , F12 Type
Finestra in alluminio anodiz., 117x143 cm, tipo F12IT. No. Art. n.18lEA/NO
43GLAZING PANEL REPLACEMENT
Sostituzione pannelli vetratiIT. No. Art. n.19SM/MQ
44EXTERNAL STEPS REPAIR
Ripristino gradini esterniIT. No. Art. n.20LS/AC
458/10 MM ALLMINUM FLASHINGS
Scossaline in alluminio da 8/10mmIT. No. Art. n.21LM/ML
46NEW ROOFING
Nuovo pacchetto di coperturaIT. No. Art. n.22SM/MQ
4725CM THICK LOAD BEARING WALL
Muro porttante, spessore 25cmIT. No. Art. n.23SM/MQ
48CEILING CORRUGATED STEEL SLAB
Solaio di copertura in lamiera grecataIT. No. Art. n.24SM/MQ
49HANGAR BAY CEMENT FLOOR REPAIR
Ripristino pavimentazione in cemento hangarIT. No. Art. n.25SM/MQ
50HANGAR BAY CEMENT FLOOR SURFACE TREATMENT
Trattamento superficiale pavimentazione in cemento hangarIT. No. Art. n.26SM/MQ
51100x100CM PASS THRU SERVICE DOOR AT HANGAR DOOR
Portella di servizio 100x100cm nel potone scorrevole hangarIT. No. Art. n.27EA/NO
52STEEL LADDER FOR ROOF ACCESS
Scale metalliche per accesso in coperturaIT. No. Art. n.28KG
53SAFETY GLVD STEEL RAILING
Ringhiera di sicurezza in acciaio zincatoIT. No. Art. n.29KG
54180x80cm RECESSED COCCO MAT, ROOM 012
Zerbino incassato in cocco 180x80cm, locale 012IT. No. Art. n.30EA/NO
55WALL MOUNTEDELECTROMAGNETIC DOOR HOLDERS
Fermi elettromagnetici montati a pareteIT. No. Art. n.31aEA/NO
56FLOOR MOUNTED ELECTROMAGNETIC DOOR HOLDERS
Fermi elettromagnetici montati a pavimentoIT. No. Art. n.31bEA/NO
57DOOR HOLDERS ANCHOR SYSTEM
Ancora per fermi elettromagneticiIT. No. Art. n.31cEA/NO
58HDPE DOWNSPOUT ELBOWS, INCL. SURFACES REPAIR
Raccordi pluviali in PEAD, incluso ripristino superficiIT. No. Art. n.32EA/NO
59REI120 PARTITION WALL, ROOM 009. INCL. CEILING
Tramezzo Rei120, locale 009. Incluso soletta di chiusuraIT. No. Art. n.33LS/AC
59OVERHEAD DOOR REPAIR, ROOM 008
Riparazione portone sezionale, locale 008IT. No. Art. n.34LS/AC
Total Architectural - Totale architettonico
IIb Structural Work - IIc Lavori Strutturali
NOT APPLICABLE/ Non applicabile
IIc Civil Work - IIc Lavori Civili
NOT APPLICABLE/ Non applicabile
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
NOT APPLICABLE/ Non applicabile
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici
1SONIC BIRD CONTROL SYSTEM
Dissuasore sonoro allontanamento volatiliIT. No. Art. n.1LS/AC
2NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x70+35N+35PE
Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x70+35N+35PEIT. No. Art. n.2aLM/ML
3NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x70+35N+35PE
Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x70+35N+35PEIT. No. Art. n.2bLM/ML
4NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x95+50N+50PE
Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x95+50N+50PEIT. No. Art. n.2cLM/ML
5NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x120+70N+70PE
Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x120+70N+70PEIT. No. Art. n.2dLM/ML
6NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x95+50N+50PE
Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x95+50N+50PEIT. No. Art. n.2eLM/ML
7NEW CABLES FEEDING NEW ELECTRICAL PANELS 3x1x70+35N+35PE
Nuovi cavi alimentanti i nuovi quadri elettrici 3x1x70+35N+35PEIT. No. Art. n.2fLM/ML
8500x150 CABLE TRAY
Canaletta 500x150IT. No. Art. n.2gLM/ML
9100x75 CABLE TRAY
Canaletta 100x75IT. No. Art. n.2hLM/ML
10NEW 4P-250A CIRCUIT BREAKER
Nuovo interruttore 4P-250AIT. No. Art. n.3EA/NO
11NEW ELECTRICAL PANELS A AND B - PANEL A
Nuovi quadri elettrici A e B - Quadro AIT. No. Art. n.4aEA/NO
12NEW ELECTRICAL PANELS A AND B - QUADRO B
Nuovi quadri elettrici A e B - Quadro BIT. No. Art. n.4bEA/NO
13NEW ELECTRICAL PANELS C AND D - PANEL C
Nuovi quadri elettrici C e D - Quadro CIT. No. Art. n.5aEA/NO
14NEW ELECTRICAL PANELS C AND D - PANEL D
Nuovi quadri elettrici C e D - Quadro DIT. No. Art. n.5bEA/NO
15NEW ELECTRICAL PANEL HBOP
Nuovo quadro elettrico HBOPIT. No. Art. n.6EA/NO
16NEW ZONE OUTLET PANEL
Nuovo quadro prese di zonaIT. No. Art. n.7EA/NO
17NEW INTERLOCKED OUTLETS
Nove prese interbloccateIT. No. Art. n.8EA/NO
18NEW IDIGITAL MULTI-METER
Novo Multimetro DigitaleIT. No. Art. n.9EA/NO
19NEW OUTLETS ITALIAN STYLE
Nuove prese tipo ItalianoIT. No. Art. n.10EA/NO
20NEW OUTLETS USA STYLE
Nuove prese tipo USAIT. No. Art. n.11EA/NO
21NEW GROUND FAULT OUTLETS
Nuove prese con differenzialeIT. No. Art. n.12EA/NO
22TWO SECTION 195x65 FLOOR BASE CHANNEL
Canalina battiscopa a due scomparti 195x65IT. No. Art. n.13LM/ML
23CIVIL OUTLET POINT
Punto presa civileIT. No. Art. n.14EA/NO
24LIGHTING POINT
Punto luceIT. No. Art. n.15EA/NO
25UPGRADING EXISTING 10% LIGHTING FIXTURES
Revisione 10% corpi illuminanti esistentiIT. No. Art. n.16LS/AC
26NEW CABLES FEEDING NEW INTERLOCKED OUTLETS, 5x16
Nuovi cavi alimentanti le prese interbloccate, 5x16IT. No. Art. n.17aLM/ML
27NEW CABLES FEEDING NEW INTERLOCKED OUTLETS, 5x6
Nuovi cavi alimentanti le prese interbloccate, 5x6IT. No. Art. n.17bLM/ML
28NEW CABLES FEEDING NEW INTERLOCKED OUTLETS, 3x6
Nuovi cavi alimentanti le prese interbloccate, 3x6IT. No. Art. n.17cLM/ML
27NEW 2X36 W LIGHTING FIXTURES
Nuovi corpi illuminanti 2x36 WIT. No. Art. n.18EA/NO
28NEW 4X18 W LIGHTING FIXTURES
Nuovi corpi illuminanti 4X18 WIT. No. Art. n.19EA/NO
29NEW LED TYPE OUTDOOR FLOODLIGHTS
Nuovi proiettori da esterno a LEDIT. No. Art. n.20EA/NO
30NEW COMMUNICATION OUTLETS
Nuove prese per comunicazioniIT. No. Art. n.21EA/NO
31NEW COMMUNICATION POINT
Nuovo punto per comunicazioniIT. No. Art. n.22EA/NO
32NEW COMMUNICATION RACK - MAIN RACK
Nuove Armadio per comunicazioni - Rack PrincipaleIT. No. Art. n.23aEA/NO
33NEW COMMUNICATION RACK - TR1
Nuove Armadio per comunicazioni - TR1IT. No. Art. n.23bEA/NO
34NEW COMMUNICATION RACK - TR2
Nuove Armadio per comunicazioni - TR2IT. No. Art. n.23cEA/NO
35NEW COMMUNICATION RACK - OPTIC FIBER CABLE
Nuove Armadio per comunicazioni - Cavi Fibra OtticaIT. No. Art. n.23dLM/ML
36NEW WIFI ACCESS POINT - OFFICES
Nuovi punti di accesso WIFI - UfficiIT. No. Art. n.24aLS/AC
37NEW WIFI ACCESS POINT - HANGAR BAY
Nuovi punti di accesso WIFI - Area hangarIT. No. Art. n.24bLS/AC
38NEW WIFI ACCESS POINT - OUTDOOR
Nuovi punti di accesso WIFI - EsternoIT. No. Art. n.24cLS/AC
39TEMPERATURE CONTROL PANEL
Quadro controllo temperaturaIT. No. Art. n.25LS/AC
40ELECTROMAGNETIC HOLDERS CONNECTIONS
Collegamenti degli elettromagnetiIT. No. Art. n.26LS/AC
41NEW LPS SYSTEM
Nuovo impianto LPSIT. No. Art. n.27LS/AC
39ELECTRICAL SYSTEMS TESTS
Collaudo Impianti ElettriciIT. No. Art. n.28LS/AC
40TELECOMM SYSTEM TESTS
Collaudo Impianto TelefonicoIT. No. Art. n.29LS/AC
TOTAL PART IV - Totale Parte IV
SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale

Page &P of &N

Summary

CONSTRUCTION COST ESTIMATE BREAKDOWN - REV 2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RESTORE HANGAR 1 BLDG 921, AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 09-1031AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
A.REPAIR WORKS / Lavori di Ristutturazione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
SUB TOTAL A.
B.SUSTAIN WORKS / Lavori di Manutenzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART IV - ELECTRICAL WORK
SUB TOTAL B.
TOTAL PRICE / Costo Totale

Page &P of &N

Grand Total

RESTORE HANGAR 1 BLDG 921, AREA F, AVIANO AB, ITALY - REV 2
INSTRUCTIONS FOR COMPLETING AF FORM
A. REPAIRB. SUSTAINTOTAL A+B (€)
TOTAL MATERIAL COSTS€0€0€0
TOTAL LABOR COSTS€0€0€0
TOTAL OTHER DIRECT COSTS€0€0€0
TOTAL DIRECT COSTS€0€0€0
OVERHEAD%€0€0€0
SUBTOTAL€0€0€0
PROFIT%€0€0€0
TOTAL PRICE€0€0€0
DATEFIRM NAME
TITLEBY
INSTRUCTIONS TO OFFERORS

&CPREVIOUS EDITION IS OBSOLETE&12 &RSheet &P of &N

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.