ATTACHMENT 5 – BID SCHEDULE
NON-PERSONAL SERVICES:
The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform collection of recyclable materials and operations of recycling centers in the KAISERSLAUTERN MILITARY COMMUNITY in accordance with the Performance Work Statement dated 11 Feb 2019.
BASIC YEAR
Performance Period: 01 Oct 2019- 30 Sep 2020
Phase-In Plan will start on approximately 1 Sep 19 – 30 Sep 19, the offeror will coordinate with 786 CES/CEOES and the current contractor to execute the Phase-In Plan. The Phase-In Plan is for planning purposes only and at no additional cost to the Government.
Historical Estimated Workload Data can be found in Appendix A of the PWS, dated 11 Feb 19.
The offeror will propose at the main CLIN level (i.e. 0003, 1003). At the time of award, the government will award the contract with 16 Sub-CLINS against each main CLIN (i.e. 000301, 000302, 000303). This is for funding purposes only and the total for the main CLIN will be unchanged and the contractor will still invoice at the main CLIN level.
CONTRACT
LINE ITEM
NO. (CLIN)
SUPPLIES/SERVICE
QTY
UNIT
PRICE
AMOUNT
0003 Recyclable Collection – Base This shall include:
• Recycling – (PWS Para 1.1.1.3)
• Unscheduled Items Pick-up and
Special Events (PWS Para 1.1.3.1)
• Additional Pick-ups (PWS Para
1.1.3.6.)
• Basic Cleaning for Underground
Containers (UC’s) (PWS Para 1.1.9.2.)
• On Call Cleaning for
UC’s (PWS Para 1.1.9.3.)
12 MO
• Unscheduled UC Lifting
(PWS Para 1.1.9.4.)
0005 Recyclable Collection – MFH (Nonprivatized) This shall include:
• Recycling (PWS Para 1.1.1.3)
• Unscheduled Items Pick-up and
Special Events (PWS Para 1.1.3.1)
• Additional Pick-ups (PWS Para
1.1.3.6.)
• Basic Cleaning for Underground
Containers (UC’s) (PWS Para 1.1.9.2.)
• Unscheduled UC Lifting
Container Relocations (PWS Para 1.1.3.7) – No charge
Not Separately Priced
0015 Operate Base Recycling Centers / Material Recovery Facility (PWS Para 1.2.3)
12 MO
TOTAL BASE YEAR
AMOUNT:
OPTION YEAR ONE
Performance Period: 01 Oct 2020- 30 Sep 2021
Historical Estimated Workload Data can be found in Appendix A of the PWS, dated 11 Feb 19.
CONTRACT
1003 Recyclable Collection – Base
• Recycling – (PWS Para
1.1.1.3)
• Unscheduled Items Pick-up and
Special Events (PWS Para 1.1.3.1)
• Additional Pick-ups (PWS Para
1.1.3.6.)
• Basic Cleaning for
Underground Containers (UC’s) (PWS Para 1.1.9.2.)
• Unscheduled UC
Lifting
1005 Recyclable Collection – MFH (Nonprivatized) This shall include:
• Recycling (PWS Para 1.1.1.3)
• Unscheduled Items Pick-up and
• Additional Pick-ups (PWS Para
1.1.3.6.)
• Basic Cleaning for
1015 Operate Base Recycling Centers / Material Recovery Facility (PWS Para 1.2.3)
12 MO
TOTAL OPTION YEAR
ONE AMOUNT:
OPTION YEAR TWO
Performance Period: 01 Oct 2021- 30 Sep 2022
Historical Estimated Workload Data can be found in Appendix A of the PWS, dated 11 Feb 19.
CONTRACT
2003 Recyclable Collection – Base
• Unscheduled Items Pick-up and
• Additional Pick-ups (PWS
Para 1.1.3.6.)
• Basic Cleaning for
2005 Recyclable Collection – MFH
This shall include:
• Recycling (PWS Para 1.1.1.3)
• Unscheduled Items Pick-up and
• Basic Cleaning for
2015 Operate Base Recycling Centers / Material Recovery Facility (PWS Para 1.2.3)
TOTAL OPTION
YEAR TWO AMOUNT:
OPTION YEAR THREE
Performance Period: 01 Oct 2022- 30 Sep 2023
Historical Estimated Workload Data can be found in Appendix A of the PWS, dated 11 Feb 19.
CONTRACT
3003 Recyclable Collection – Base
• Unscheduled Items Pick-up and
• Basic Cleaning for
3005 Recyclable Collection – MFH (Nonprivatized)
• Recycling (PWS Para 1.1.1.3)
• Basic Cleaning for
(PWS Para 1.1.3.7) - No
3015 Operate Base Recycling Centers / Material Recovery Facility (PWS Para 1.2.3)
12 MO
TOTAL OPTION
YEAR THREE
OPTION YEAR FOUR
Performance Period: 01 Oct 2023- 30 Sep 2024
Historical Estimated Workload Data can be found in Appendix A of the PWS, dated 11 Feb 19.
CONTRACT
4003 Recyclable Collection – Base
• Basic Cleaning for
4005 Recyclable Collection – MFH
This shall include:
• Recycling (PWS Para 1.1.1.3)
• Unscheduled Items Pick-up and
• Basic Cleaning for
4015 Operate Base Recycling Centers / Material Recovery Facility (PWS Para 1.2.3)
12 MO
TOTAL OPTION
YEAR FOUR
Total Contract Price (Base Year + Four Option Years