Summary of Changes.docx
DOCX document 12 KB Posted
- Attached to
- Spangdahlem Static Display Restoration
- Solicitation number
- FA5606-09-R-0035
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of Work 11Sep09.docx | DOCX document | |
| Performance Plan 11Sep09.doc | DOC document | |
| Summary_of_Changes_11Sep09.docx | DOCX document | |
| Performance Plan 04Sep09.doc | DOC document | |
| Summary of Changes 04Sep09.docx | DOCX document | |
| Statement of Work 04Sep09.docx | DOCX document | |
| Statement of Work dtd 03Sep09.docx | DOCX document | |
| NEW Performance Plan.doc | DOC document | |
| AF IMT 3952.pdf | ||
| Performance Plan.doc | DOC document | |
| Statement of Work.docx | DOCX document | |
| Past Performance Survey.doc | DOC document | |
| FBO Pictures.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
List of SOW Changes:
Paragraph 1 - Replace "Initial contract performance must begin no later than 30 Sep 09." with " Contract award is expected by 30 Sep 09 and initial contract performance is to begin as soon as possible following award. All repair work and painting must be completed by 31 Mar 2010. "
Paragraph 1.1 - Last sentence, "pedastal" changed to "pedastals"
Paragraph 1.3 - The following sentences are added after the first sentence: "The F-16, F-15, F-4, A-10, and F-105 aircraft are located at the airpark. The F-86 is located about a half mile away from the airpark."
The paragraph number for the Service Delivery Summary is changed to 2 and subsequent paragraph numbering is corrected.
Paragraph 2 - The Service Delivery Summary, item 2, Performance Threshold is changed to read "Not to exceed average of four weeks per aircraft unless delayed by weather."
Paragraph 3 - The last sentence "No other government furnished property will be provided to the contractor." is replaced with the following: " The Government offers the contractor use of nearby fire hydrants and 220/380 volt electrical outlets. As of the date of this SOW, utility services are available and functioning. However, the Government offers no guarantee of their continued serviceability. No other government furnished property will be provided to the contractor. The contractor is highly encouraged to provide a Toilet/Shower Box or other portable hygeine unit as there is no guarantee surrounding buildings will have such facilities available to contractor personnel."
Paragraph 4.3 - The following sentence is added to the end of the paragraph: "The contractor is solely responsible for all waste disposal. The Government will not assist with the disposal of any waste associated with this effort. "
List of Performance Plan changes:
SERVICE DELIVERY SUMMARY (page 5), item 2, Performance Threshold is changed to read " Not to exceed average of four weeks per aircraft unless delayed by weather."
TIMEFRAME FOR COMPLETION OF CORROSION/STRUCTURAL REPAIR (Page 6), Performance Threshold is changed to read: " Not to exceed average of four weeks per aircraft unless delayed by weather. All repair work and painting must be completed by 31 Mar 2010." and the Procedures are changed to read " Performance is acceptable if completion of the cleaning/repair/corrosion control/painting of all the aircraft is within 24 weeks. All repair work and painting must be completed by 31 Mar 2010."